Original source · versioned page text
RFI - SWMP Elands
The original of this document is very large (17.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 50, section 1. The text section number identifies this passage in the reader.
PROPERTY BOUNDARY
PROPOSED FOOTPATH
EDGE OF EXISTING ASPHALT C For Aprroval JP 14/01/22
B For Approval JP 13/01/22
GENERAL NOTES A Original Issue (For App.) JP 10/01/22
1:40 1:8 1. ALL WORK TO CONFORM TO AS 3500 Part 1, 2 Rev Description Drawn Date
1:33 1:8 1:6
& 3. Associated Consultant
1:4
DWELLING 2. ALL WORK TO CONFORM WITH ALL RELEVANT
1:6 AUSTRALIAN STANDARDS.
1:8
PROPOSED KERB AND CHANNEL 3. CONTRACTOR TO VERIFY ALL LEVELS
BEFORE COMMENCING WORK TO ENSURE
CONNECTION TO SERVICE WITH ADEQUATE
0.5 0 0.5 1 1.5 2 2.5m COVER AND FALL.
ROAD SECTION
Scale 1:50 SCALE 1 : 50 4. THE EXISTING UNDERGROUND SERVICES
(BEFORE REDUCTION) SHOWN HAVE BEEN OBTAINED FROM OLD
ROAD CROWN
E
E
TOP See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.