Skip to the record
Search everything, all in one place.

Original source · versioned page text

RFI - SWMP Elands

of 96

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (17.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 8, section 1. The text section number identifies this passage in the reader.

65-67 Elanda Street, Sunshine Beach
Site Based Stormwater Management Plan
_____________________________________________________________________________________________

2. Lawful Point of Discharge
In accordance with Queensland Urban Drainage Manual (QUDM 2016) section 3.4, a Lawful
Point of Discharge (LPD) must be demonstrated when proposing a development. Section
3.4.1 outlines a two-point test to assess whether a lawful point of discharge exists for a
development that consists of the following:

    (i)       The location of the discharge is under the lawful control of the local government
              or other statutory authority from whom permission to discharge has been
              received. This will include park, drainage or road reserve, stormwater drainage
              easement


    (ii)      In discharging to that location, the discharge will not cause an actionable
              nuisance (i.e. a nuisance for which the current or some future neighbouring
              proprietor may bring an action or claim for damages arising out of the nuisance),
              or environmental or property damage.

Currently, the site discharges stormwater naturally to the east downstream area, the
proposed LPOD moves this to Elanda Street. Surface runoff will flow towards east of the
site as sheet flow as it currently does; while the roof water will be mitigated first, and
discharged to Elanda Street.




File Name:            WCD-22936 – 65-67 Elanda_SWMP.docx
Revision:             B                                                                     8
Log in to download the original file

RFI - SWMP Elands.pdf · 17.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.