VEGETATION MANAGEMENT STATEMENT SITE DESCRIPTION: The site is described as Lot 3 on RP 887636 and is located at 2 Girraween Court, Sunshine Beach. The subject property is bounded by Girraween Court to the south, Eenie Creek Road to the north, the Noosa Tennis Academy to the west and the balance of the lot to the east. The existing vegetation is a blend of regrowth open dry heath with a co-dominance of Allocasuarina littoralis and Banksia aemula and cleared lands. Generally the native vegetation growing on this property are species which naturally occur in the regional ecosystem 12.2.13. No active koala habitat trees were identified on this site. For the purpose of preparing this Vegetation Management Plan, only the significant trees growing on the site, generally 120mm D.B.H. or greater, were plotted and identified but the intention is to preserve all the native vegetation on site wherever practicable. This will be done by either retaining and protecting the vegetation in situ or by translocating vegetation where practical and sustainable to locations on site which are clear of proposed building works. VEGETATION MANAGEMENT: Prior to any works commencing on site all significant trees and the associated understorey plants as shown are to be protected with temporary protection fencing (see detail 01 on LP 02). This fencing shall remain for the full length of the construction phase to protect the trees from the impacts associated with the development works including earthworks , location and storage of equipment, materials, site sheds and storage facilities. In general, no work is to be carried out within this fenced off area without an initial subsurface root layout map being prepared by a suitable qualified and experience arborist. All works within this area are to be carried out so that no major structural roots are affected. A suitably qualified arborist is to be engaged and present at all times during the undertaking of the works to ensure the safety and health of the tree is not compromised at any time. Any damage to the tree or its roots are to be repaired without hesitation. Eradicate all environmental and bushland weeds from the site if detected using an established environmentally sensitive technique. Remove all rubbish, old fences including fence posts and gates, and debris from the site as required and dispose of in an approved manner . Refer to Engineer's drawings for details of sediment and erosion control devises. All removed vegetation, except weed species unless approved by the Superintendent's Representative , shall be mulched and the material stockpiled on site as for re-use in landscape works proposed for the development. Refer civil engineering plans for stockpile sites. A suitably qualified arborist is to be engaged to inspect and certify the integrity and suitability of the vegetation to be retained. SITE MANAGEMENT: Ensure all vehicles leaving the site are reasonably clean and free from soil and vegetative material. Construction personnel are not to allow their dogs, if any, within the area covered by the Vegetation Management Plan prior to or during clearing works. FAUNA MANAGEMENT A qualified Fauna Spotter who is fully licensed with QPWS is required to inspect all vegetation on the development site prior to the commencement of the clearing works for any fauna or habitat features. Any trees identified for removal that are found to contain native animals or birds are to be retained until the resident fauna relocate away from the site. No fauna is to be physically relocated, but allowed to move on naturally, unless approved in writing by QPWS. The Fauna Spotter is to supply a written report to the Council's Ecologist certifying that the site has been inspected and clearing works can proceed. lf deemed necessary by the Council's Ecologist based on the findings of the Fauna Spotter's pre-clearing certification report, the Fauna Spotter is to remain on site at all times when clearing works are progressing. Following approval from the Fauna Spotter to commence clearing works, clearing is to progress in a methodical manner starting from one end of the site and working towards the rear, where practicable. The Fauna Spotter is to inspect all fallen trees, bark, debris and leaves for resident fauna. Orphaned or injured animals that may require relocation are to be reported to QPWS on tel: 1300 130 372. Only personnel licensed to do so by QPWS are to handle fauna. VEGETATION PROTECTION METHODS: The extent of vegetation to be retained is shown on this plan. All precautions shall be taken to protect this vegetation from loss or damage resulting from the impact of site works. This includes but is not limited to; loss or scarring of tree limbs or trunk, unspecified removal of tree and the compaction of the soil under the tree canopies. Protection methods for trees that are to be retained include, but not limited to; providing a protective barrier or fence to the existing vegetation using barrier mesh, plain wire and star pickets. The only works to be allowed inside the enclosure, without prior approval, will be the removal of debris or rubbish, the application of mulch and/or the planting of new vegetation where required. The cutting of tree roots should be avoided. In the event of root damage, immediately prune the root with a sharp pruning tool or saw and apply a suitable fungicide to the wound. Any damage to the protected vegetation is to be remedied by an approved arborist as soon as practicable after the damage has occur and to the satisfaction of Council's representative. WEED REMOVAL: While this plan concentrates on the native vegetation found on site it was noted that while undertaking the site surveys no class 1 or 2 declared plants were found, but if discovered the presence of the plants are to be reported to Council and removed using industry recognised and environmentally sound techniques. lt was also noted that there was present several weed species typically found in this type of disturbed environment. While they are not currently posing a major environmental threat it is advisable that they be treated using industry recognised and environmentally sound techniques by a suitably qualified and experienced contractor. If using herbicide to manage weeds, care must be taken to ensure no over-spray of herbicide occurs. The Contractor shall be responsible for replacing any plant which has died or is irrevocably damaged either within or adjacent to the project site caused by over-spray of herbicide. REVEGETATION/REHABILITATION: Prior to commencement of any clearing works, a plant rescue is to be carried out. The rescued plants shall either be translocated directly into areas on the site which are clear of any future works or potted up and taken off site to a suitable location where they will be cared for. The translocated plants will be protected with a vegetation protection fence and appropriately maintained throughout the construction and establishment phases of the project. The potted stock will be maintained off site before being returned to site after the completion of construction works and replanted in the revegetation zones as shown on LPO’ at the prescribed plant densities detailed below. REVEGETATION/REHABILITATION WORKS: All works carried out in relation to this plan is to comply with Sunshine Coast Regional Council Planning Scheme Policies (PSP) 3 - Landscape Plants and Guidelines. The remnant native vegetation existing within the site comprises of species usually found in the Regional Ecosystem 12.2.13, Open Dry Heath. Only species usually found in this R.E. are to be used for revegetation works. SITE PREPARATION: All areas to be revegetated shall be cultivated to a depth of 200mm prior to the planting. Take care when cultivating not to bring subgrade soil layers to the top. After cultivation, remove all stone greater than 25mm diameter. Take care when Cultivating over service lines, pipes and around tree roots and if necessary cultivate with hand tools. Lightly cultivate with hand tools within G0O0mm of hard pavements and structures. Cultivate parallel to final contours. do not cultivate when soil is wet or plastic. Test site topsoils to ensure the soil's ph is between 6.5-7.0 and its fertility is within acceptable limits. Ameliorate where necessary. Spread site mulch evenly to a minimum depth of 100mm. PLANTING WORKS: The only plant material to be used for revegetation is that which was rescued prior to construction. No supplementary supply of plants are to be used without prior approval of the Superintendent's representative. Plantings are to be carried out as random mixtures of plants at the following plant densities:- 1 Tree per 5m?, 1 shrub per 3m? and 2 groundcovers per 1m?. Water in well at time of planting and then as required to adequately sustain good healthy plant growth. Maintain as detailed. MAINTENANCE WORKS: The maintenance period of 12 weeks to commence at practical completion & shall include; e min 1 visit per week for the first 6 weeks e min 1 visit per fortnight for the 6 weeks following works to be carried out during this period includes but is not limited to; watering, weeding, pest & disease control, replacement planting, remulching, and keeping the site tidy. Refer to Council's landscape requirements & details for further information. Description. Existing tree to be retained & protected during site construction Star pickets 2400 long driven 600mm into ground Surround with orange plastic safety barrier beyond the root/drip zone ™~ af Single tree protection fence Description. Existing tree to be retained & protected during site construction Star pickets 2400 long driven 600mm into ground Surround with orange plastic safety barrier beyond the root/drip zone In general the vegetation protection fence to be located no closer than a distance which is equivalent to 12 times the DBH of the tree that is to be protected Multiple tree protection fence @) Typical vegetation protection fencing Plan Scale NTS LANDSCAPE ARCHITECTS: a IN E MeL A eEnviromental ManagementeLandscape Architecture EMAIL:[email protected] inSITE EMLA P.O. BOX 2460 KEPERRA, QLD 4054 T: 07 3351 8425 F: 07 3351 8635 M: 0421 883 238 ABN: 89 115 479 046 CLIENT: Christian Brothers PROJECT: Noosa Flexible Learning Centre PROJECT No: 12-186 A 08-08-12 Client Review Revision Date: Description: NORTH DRAWING TITLE Vegetation Management Notes and Detail DRAWING NUMBER 12-186 LP 02 SCALE DATE DRAWN BY: =| CHECKED July 2012 - This plan was prepared for the exclusive use of INSITE EM LA Pty Ltd to accompany relevant documentation for submission & shall not be used for any other purpose or by any other persons or company. Do not scale from this plan, use dimensioning where possible. ©Copyright INSITE EM LA Pty Ltd 2008. No reproduction, alteration or copying of this document or part thereof is permitted without the written permission of INSITE EM LA Pty Ltd.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix F - Vegetation Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.