VEGETATION MANAGEMENT STATEMENT

SITE DESCRIPTION:

The site is described as Lot 3 on RP 887636 and is located at 2 Girraween Court,
Sunshine Beach. The subject property is bounded by Girraween Court to the south,
Eenie Creek Road to the north, the Noosa Tennis Academy to the west and the
balance of the lot to the east.

The existing vegetation is a blend of regrowth open dry heath with a co-dominance of
Allocasuarina littoralis and Banksia aemula and cleared lands. Generally the native
vegetation growing on this property are species which naturally occur in the regional
ecosystem 12.2.13.

No active koala habitat trees were identified on this site.

For the purpose of preparing this Vegetation Management Plan, only the significant
trees growing on the site, generally 120mm D.B.H. or greater, were plotted and
identified but the intention is to preserve all the native vegetation on site wherever
practicable. This will be done by either retaining and protecting the vegetation in situ or
by translocating vegetation where practical and sustainable to locations on site which
are clear of proposed building works.

VEGETATION MANAGEMENT:

Prior to any works commencing on site all significant trees and the associated
understorey plants as shown are to be protected with temporary protection fencing
(see detail 01 on LP 02). This fencing shall remain for the full length of the construction
phase to protect the trees from the impacts associated with the development works
including earthworks , location and storage of equipment, materials, site sheds and
storage facilities.

 

In general, no work is to be carried out within this fenced off area without an initial
subsurface root layout map being prepared by a suitable qualified and experience
arborist. All works within this area are to be carried out so that no major structural roots
are affected.

A suitably qualified arborist is to be engaged and present at all times during the
undertaking of the works to ensure the safety and health of the tree is not
compromised at any time. Any damage to the tree or its roots are to be repaired
without hesitation.

Eradicate all environmental and bushland weeds from the site if detected using an
established environmentally sensitive technique.

Remove all rubbish, old fences including fence posts and gates, and debris from the
site as required and dispose of in an approved manner .

Refer to Engineer's drawings for details of sediment and erosion control devises.

All removed vegetation, except weed species unless approved by the Superintendent's
Representative , shall be mulched and the material stockpiled on site as for re-use in
landscape works proposed for the development. Refer civil engineering plans for
stockpile sites.

A suitably qualified arborist is to be engaged to inspect and certify the integrity and
suitability of the vegetation to be retained.

SITE MANAGEMENT:

Ensure all vehicles leaving the site are reasonably clean and free from soil and
vegetative material.

Construction personnel are not to allow their dogs, if any, within the area covered by
the Vegetation Management Plan prior to or during clearing works.

FAUNA MANAGEMENT

 

 

A qualified Fauna Spotter who is fully licensed with QPWS is required to inspect all
vegetation on the development site prior to the commencement of the clearing works
for any fauna or habitat features. Any trees identified for removal that are found to
contain native animals or birds are to be retained until the resident fauna relocate away
from the site. No fauna is to be physically relocated, but allowed to move on naturally,
unless approved in writing by QPWS.

The Fauna Spotter is to supply a written report to the Council's Ecologist certifying that
the site has been inspected and clearing works can proceed.

lf deemed necessary by the Council's Ecologist based on the findings of the Fauna
Spotter's pre-clearing certification report, the Fauna Spotter is to remain on site at all
times when clearing works are progressing.

Following approval from the Fauna Spotter to commence clearing works, clearing is to
progress in a methodical manner starting from one end of the site and working
towards the rear, where practicable.

The Fauna Spotter is to inspect all fallen trees, bark, debris and leaves for resident
fauna. Orphaned or injured animals that may require relocation are to be reported to
QPWS on tel: 1300 130 372. Only personnel licensed to do so by QPWS are to handle
fauna.

VEGETATION PROTECTION METHODS:

The extent of vegetation to be retained is shown on this plan. All precautions shall be
taken to protect this vegetation from loss or damage resulting from the impact of site
works. This includes but is not limited to; loss or scarring of tree limbs or trunk,
unspecified removal of tree and the compaction of the soil under the tree canopies.

 

Protection methods for trees that are to be retained include, but not limited to; providing
a protective barrier or fence to the existing vegetation using barrier mesh, plain wire
and star pickets.

The only works to be allowed inside the enclosure, without prior approval, will be the
removal of debris or rubbish, the application of mulch and/or the planting of new
vegetation where required.

The cutting of tree roots should be avoided. In the event of root damage, immediately
prune the root with a sharp pruning tool or saw and apply a suitable fungicide to the
wound.

Any damage to the protected vegetation is to be remedied by an approved arborist as
soon as practicable after the damage has occur and to the satisfaction of Council's
representative.

WEED REMOVAL:

While this plan concentrates on the native vegetation found on site it was noted that
while undertaking the site surveys no class 1 or 2 declared plants were found, but if
discovered the presence of the plants are to be reported to Council and removed using
industry recognised and environmentally sound techniques.

lt was also noted that there was present several weed species typically found in this
type of disturbed environment. While they are not currently posing a major
environmental threat it is advisable that they be treated using industry recognised and
environmentally sound techniques by a suitably qualified and experienced contractor.

If using herbicide to manage weeds, care must be taken to ensure no over-spray of
herbicide occurs. The Contractor shall be responsible for replacing any plant which has
died or is irrevocably damaged either within or adjacent to the project site caused by
over-spray of herbicide.

REVEGETATION/REHABILITATION:

 

Prior to commencement of any clearing works, a plant rescue is to be carried out. The
rescued plants shall either be translocated directly into areas on the site which are
clear of any future works or potted up and taken off site to a suitable location where
they will be cared for.

The translocated plants will be protected with a vegetation protection fence and
appropriately maintained throughout the construction and establishment phases of the
project. The potted stock will be maintained off site before being returned to site after
the completion of construction works and replanted in the revegetation zones as shown
on LPO’ at the prescribed plant densities detailed below.

REVEGETATION/REHABILITATION WORKS:

All works carried out in relation to this plan is to comply with Sunshine Coast Regional
Council Planning Scheme Policies (PSP) 3 - Landscape Plants and Guidelines.

 

The remnant native vegetation existing within the site comprises of species usually
found in the Regional Ecosystem 12.2.13, Open Dry Heath.

Only species usually found in this R.E. are to be used for revegetation works.

SITE PREPARATION:

All areas to be revegetated shall be cultivated to a depth of 200mm prior to the
planting. Take care when cultivating not to bring subgrade soil layers to the top. After
cultivation, remove all stone greater than 25mm diameter.

Take care when Cultivating over service lines, pipes and around tree roots and if
necessary cultivate with hand tools. Lightly cultivate with hand tools within G0O0mm of
hard pavements and structures.

Cultivate parallel to final contours. do not cultivate when soil is wet or plastic.

Test site topsoils to ensure the soil's ph is between 6.5-7.0 and its fertility is within
acceptable limits. Ameliorate where necessary.

Spread site mulch evenly to a minimum depth of 100mm.

PLANTING WORKS:

The only plant material to be used for revegetation is that which was rescued prior to
construction. No supplementary supply of plants are to be used without prior approval
of the Superintendent's representative.

Plantings are to be carried out as random mixtures of plants at the following plant
densities:- 1 Tree per 5m?, 1 shrub per 3m? and 2 groundcovers per 1m?.

Water in well at time of planting and then as required to adequately sustain good
healthy plant growth.

Maintain as detailed.
MAINTENANCE WORKS:

 

The maintenance period of 12 weeks to commence at practical
completion & shall include;

e min 1 visit per week for the first 6 weeks
e min 1 visit per fortnight for the 6 weeks following

works to be carried out during this period includes but is not limited to;
watering, weeding, pest & disease control, replacement planting,
remulching, and keeping the site tidy.

Refer to Council's landscape requirements & details for further information.

Description.
Existing tree to be retained &

protected during site construction

Star pickets 2400 long driven
600mm into ground

Surround with orange plastic safety
barrier beyond the root/drip zone

 

™~ af Single tree protection fence

Description.

Existing tree to be retained &
protected during site construction

Star pickets 2400 long driven
600mm into ground

Surround with orange plastic safety
barrier beyond the root/drip zone

    

In general the vegetation protection fence to be
located no closer than a distance which is equivalent
to 12 times the DBH of the tree that is to be protected

Multiple tree protection fence

@) Typical vegetation protection fencing

Plan Scale NTS

 

 

 

LANDSCAPE ARCHITECTS:

a

IN

E MeL A

eEnviromental ManagementeLandscape Architecture

EMAIL:[email protected]

inSITE EMLA
P.O. BOX 2460
KEPERRA, QLD 4054

T: 07 3351 8425
F: 07 3351 8635
M: 0421 883 238
ABN: 89 115 479 046

 

 

 

CLIENT:

Christian Brothers

 

 

PROJECT:

Noosa Flexible Learning Centre

 

 

PROJECT No:

12-186

 

 

 

 

 

 

 

 

 

 

A

08-08-12

 

Client Review

 

Revision

Date:

Description:

 

NORTH

 

DRAWING TITLE

Vegetation Management Notes and Detail

 

DRAWING NUMBER
12-186 LP 02

 

SCALE

 

DATE DRAWN BY: =| CHECKED

 

 

July 2012 -

 

 

 

This plan was prepared for the exclusive use of INSITE EM LA Pty Ltd to accompany
relevant documentation for submission & shall not be used for any other purpose or
by any other persons or company.

Do not scale from this plan, use dimensioning where possible.
©Copyright INSITE EM LA Pty Ltd 2008. No reproduction, alteration or copying of

this document or part thereof is permitted without the written permission of
INSITE EM LA Pty Ltd.

 

 

Used in these records

About this file

File size
3.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix F - Vegetation Management Plan.pdf · 3.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.