1810-8094 SRA Response with conditions MCU18-0158

Attached to the e-mail SARA Response with conditions - MCU18/0158.

of 9

Page text shows just the words. Original shows the document exactly as it was published.

RA6-N




SARA reference:        1810-8094 SRA
Applicant reference:   MCU18/0158 & RAL18/0017



16 January 2019

The Chief Executive Officer
Noosa Shire Council
PO Box 141
Tewantin Qld 4565
[email protected]

Attention:       Patrick Murphy


Dear Sir/Madam

Referral agency response—with conditions
(Given under section 56 of the Planning Act 2016)

The development application described below was properly referred to the Department of State
Development, Manufacturing, Infrastructure and Planning on 7 November 2018.

Applicant details
 Applicant name:                     Kexron Pty Ltd C/- Pivotal Perspective Pty Ltd
 Applicant contact details:          Jack Lewis
                                     4/59 Mary St
                                     Noosaville QLD 4566
                                     [email protected]

Location details
 Street address:                     34 Elm Street, Cooroy
 Real property description:          4RP72698; 5RP72698; 6RP72698
 Local government area:              Noosa Shire Council

Application details
 Development permit                  Material change of use - Multiple Housing, Type 4 Conventional, Retail
                                     Business - Type 2 Shop & Salon
                                     Reconfiguring a lot – Boundary realignment (3 lots into 3)




                                                                          South East Queensland (North) regional
                                                                          office
                                                                          Mike Ahern Building, Level 3, 12 First
                                                                          Avenue, Maroochydore
 Page 1 of 9                                                              PO Box 1129, Maroochydore QLD 4558
Log in to download the original file

1810-8094 SRA Response with conditions MCU18-0158.pdf · 363 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 8 pages

Page 2

                                                                                                      1810-8094 SRA



Referral triggers
 The development application was referred to the department under the following provisions of the
Planning Regulation 2017:
          10.9.4.2.3.1                State transport corridors and future State transport corridors
          10.9.4.2.4.1                State transport corridors and future State transport corridors

Conditions
Under section 56(1)(b)(i) of the Planning Act 2016 (the Act), the conditions set out in Attachment 1 must
be attached to any development approval.

Reasons for decision to impose conditions
The department must provide reasons for the decision to impose conditions. These reasons are set out in
Attachment 2.

Advice to the applicant
The department offers advice about the application to the applicant—see Attachment 3.

Approved plans and specifications
The department requires that the plans and specifications set out below and enclosed must be attached
to any development approval.

 Drawing/report title               Prepared by                    Date         Reference no.     Version/issue
 Aspect of development: All
 Site Plan/Ground Floor             And+ Design                    July 2018    DA-16.0518.2      -
 Plan amended in red



A copy of this response has been sent to the applicant for their information.

For further information please contact Luke Farrelly, Senior Planning Officer, on 0753529774 or via email
[email protected] who will be pleased to assist.

Yours sincerely




Garth Nolan
Manager (Planning)

cc        Kexron Pty Ltd C/- Pivotal Perspective Pty Ltd, [email protected]

enc       Attachment 1—Conditions to be imposed
          Attachment 2—Reasons for decision to impose conditions
          Attachment 3—Advice to the applicant
          Approved plans and specifications




 Department of State Development, Manufacturing, Infrastructure and Planning                             Page 2 of 9

Page 3

                                                                                                1810-8094 SRA



Attachment 1—Conditions to be imposed


 No.      Conditions                                                                 Condition timing
 Material change of use
 10.9.4.2.4 State-controlled road —The chief executive administering the Planning Act 2016 nominates
 the Director-General of the Department of Transport and Main Roads to be the enforcement authority for
 the development to which this development approval relates for the administration and enforcement of
 any matter relating to the following condition(s):
 1.       (a) The development must be carried out generally in accordance with       (a) prior to the
              the following shown on the Site Plan/Ground Floor Plan, prepared       commencement of use
              by And+ Design, dated July 2018, drawing number DA-16.0518.2
              as amended in red:                                                     (b) prior to obtaining
                The existing bus stop ‘Elm St at Cooroy Station, Cooroy’            development approval
                   (TransLink ID: 700540, Hastus ID: 301598) adjacent to the site    for operational work or
                   in Elm Street must not be relocated.                              building work,
                The existing bus stop shelter must be repositioned to the north     whichever occurs first
                   of the awning. Where the existing shelter cannot be reinstated,
                   a new disability compliant shelter must be provided in            (c) prior to the
                   accordance with Noosa Council’s requirements and Table 5.9        commencement of use
                   – ‘TransLink requirements for bus stop components – bus stop
                   furniture - shelters’ (page 38) of Chapter 5 – ‘Bus Stop
                   Infrastructure’ of the Public Transport Infrastructure Manual
                   2015.
                The existing bin must be repositioned to the south of the tactile
                   ground surface indicators. Where the existing bin cannot be
                   reinstated, a new bin must be provided in accordance with
                   Table 5.9 – ‘TransLink requirements for bus stop components
                   – bus stop furniture – bins’ (page 39) of Chapter 5 – ‘Bus Stop
                   Infrastructure’ of the Public Transport Infrastructure Manual
                   2015.

          (b) Written notice must be provided to the Department of Transport and
              Main Roads’ TransLink Division (07 3851 8700 or at
              [email protected]) prior to relocating the existing shelter
              and bin at the bus stop.

          (c) RPEQ certification must be provided to the North Coast District
              Development Assessment Team, via
              [email protected]. within the Department of Transport
              and Main Roads’, confirming that the development has been
              designed and constructed in accordance with parts (a), (b) and (c)
              of this condition.

 2.       (a) Stormwater management of the development must ensure no                (a) at all times
              worsening or actionable nuisance to the state-controlled road.
                                                                                     (b) at all times
          (b) Any works on the land must not:
                  (i) create any new discharge points for stormwater runoff onto     (c) Prior to the
                  the state-controlled road;                                         commencement of use
                  (ii) interfere with and/or cause damage to the existing
                  stormwater drainage on the state-controlled road;
                  (iii) surcharge any existing culvert or drain on the state-
                  controlled road;
                  (iv) reduce the quality of stormwater discharge onto the state-
                  controlled road .

          (c) RPEQ certification with supporting documentation must be provided


 Department of State Development, Manufacturing, Infrastructure and Planning                        Page 3 of 9

Page 4

                                                                                               1810-8094 SRA




             to the North Coast District Development Assessment team via
             [email protected] within the Department of
             Transport and Main Roads, confirming that the development has
             been designed and constructed in accordance with parts (a) and
             (b) of this condition.

3.       (a) The existing vehicular property access located between Lot 5           (a) and (b) prior to the
             RP72698 and Cooroy Connection road must be permanently                     commencement of
             closed and removed.                                                        use

         (b) The kerb and channelling and the footpath between the pavement
             edge and the property boundary must be reinstated in accordance
             with Transport and Main Roads Road Planning and Design Manual
             and relevant council standards at no cost to the Department of
             Transport and Main Roads’.

Reconfiguring a lot
10.9.4.2.3.1 State-controlled road —The chief executive administering the Planning Act 2016 nominates
the Director-General of the Department of Transport and Main Roads to be the enforcement authority for
the development to which this development approval relates for the administration and enforcement of
any matter relating to the following condition(s):
4.       a) The development must be carried out generally in accordance with        (a) & (c) prior to the
             the following shown on the Site Plan/Ground Floor Plan, prepared           commencement of
             by And+ Design, dated July 2018, drawing number DA-16.0518.2               use
             as amended in red:
               The existing bus stop ‘Elm St at Cooroy Station, Cooroy’            (b) prior to obtaining
                  (TransLink ID: 700540, Hastus ID: 301598) adjacent to the site        development
                  in Elm Street must not be relocated.                                  approval for
               The existing bus stop shelter must be repositioned to the north         operational work
                  of the awning. Where the existing shelter cannot be reinstated,
                  a new disability compliant shelter must be provided in
                  accordance with Noosa Council’s requirements and Table 5.9
                  – ‘TransLink requirements for bus stop components – bus stop
                  furniture - shelters’ (page 38) of Chapter 5 – ‘Bus Stop
                  Infrastructure’ of the Public Transport Infrastructure Manual
                  2015.
               The existing bin must be repositioned to the south of the tactile
                  ground surface indicators. Where the existing bin cannot be
                  reinstated, a new bin must be provided in accordance with
                  Table 5.9 – ‘TransLink requirements for bus stop components
                  – bus stop furniture – bins’ (page 39) of Chapter 5 – ‘Bus Stop
                  Infrastructure’ of the Public Transport Infrastructure Manual
                  2015.

         (b) Written notice must be provided to the Department of Transport and
             Main Roads’ TransLink Division (07 3851 8700 or at
             [email protected]) prior to relocating the existing shelter
             and bin at the bus stop.

         (c) RPEQ certification must be provided to the North Coast District
             Development Assessment Team, via
             [email protected]. within the Department of Transport
             and Main Roads’, confirming that the development has been
             designed and constructed in accordance with parts (a), (b) and (c)
             of this condition.

5.       (a) Stormwater management of the development must ensure no                (a) at all times


Department of State Development, Manufacturing, Infrastructure and Planning                        Page 4 of 9

Page 5

                                                                                                1810-8094 SRA




         worsening or actionable nuisance to the state-controlled road.
                                                                                     (b) at all times
         (b) Any works on the land must not:
                                                                                     (c) prior to submitting
                   (i) create any new discharge points for stormwater runoff onto    the Plan of Survey to
                   the state-controlled road;                                        the local government
                   (ii) interfere with and/or cause damage to the existing           for approval
                   stormwater drainage on the state-controlled road;
                   (iii) surcharge any existing culvert or drain on the state-
                   controlled road;
                   (iv) reduce the quality of stormwater discharge onto the state-
                   controlled road .

                   (c) RPEQ certification must be provided to the North Coast
                   District Development Assessment team via
                   [email protected] within the Department of
                   Transport and Main Roads, confirming that the development
                   has been designed and constructed in accordance with parts
                   (a) and (b) of this condition.

6.       a) The existing vehicular property access located between Lot 5             (a) and (b) prior to
            RP72698 and Cooroy Connection road must be permanently                       submitting the
            closed and removed.                                                          Plan of Survey to
                                                                                         the local
         (b) The kerb and channelling and the footpath between the pavement              government for
             edge and the property boundary must be reinstated in accordance             approval
             with Transport and Main Roads Road Planning and Design Manual
             and relevant council standards at no cost to the Department of
             Transport and Main Roads’.




Department of State Development, Manufacturing, Infrastructure and Planning                         Page 5 of 9

Page 6

                                                                                           1810-8094 SRA



Attachment 2—Reasons for decision to impose conditions

The reasons for this decision are:
  To ensure the development is carried out generally in accordance with the plans of development
    submitted with the application.
  To provide, as far as practicable, public passenger transport infrastructure to support public
    passenger services.
  To ensure that the impacts of stormwater events associated with development are minimised and
    managed to avoid creating any adverse impacts on the state-transport corridor.
  To maintain the safety and efficiency of the state-controlled road by reducing the number of road
    access.

Findings on material questions of fact
DSDMIP as referral agency (concurrence):
  Requires conditions to attach to any development approval as detailed in the referral agency
    response (concurrence). (Planning Act 2016 section 56(1)(b)(i))
  Provides advice to the applicant about the referral agency response (concurrence).
  Include references to the plans and specifications relied upon for the referral agency response
    (concurrence).

Evidence or other material on which the findings were based
 development application material uploaded to mydas2
 State Development Assessment Provisions published by the Department of State Development,
    Manufacturing, Infrastructure and Planning
 Planning Act 2016
 Planning Regulation 2017




 Department of State Development, Manufacturing, Infrastructure and Planning                   Page 6 of 9

Page 7

                                                                                               1810-8094 SRA



Attachment 3—Advice to the applicant


 General advice
 Advertising advice
 1        Advertising devices have the potential to cause unsafe distraction, glare or other nuisance to
          drivers, which affects safety on the sate-controlled road. Any proposed advertising devices are
          to be in accordance with the Department of Transport and Main Roads’ (TMR) Roadside
          Advertising Guide. For example, any advertising device at this location:
               Must not exceed a maximum luminance of 350cd/m2.
               Must be placed within the subject site and be clear of the state-controlled road reserve
                   (without overhang).
               Must not contain a variable message component.

          Further information on the Roadside Advertising Manual can be found at the following link:
          https://www.tmr.qld.gov.au/business-industry/Technical-standards-publications/Roadside-
          advertising-manual

 Public passenger transport
 2        The detailed positioning of the relocated bus stop shelter and bin should be submitted to the
          Department of Transport and Roads’ TransLink Division for endorsement prior to construction
          or any works commencing. Please contact the TransLink Division on telephone number (07)
          3851 8700 or at [email protected] TMR, TransLink Public Transport Infrastructure Manual May (PTIM) 2015 and Signage
          Manual Bus Network Transport Infrastructure December 2016 are available at:
          http://translink.com.au/about-translink/what-we-do/public-transport-planning.

 Road Traffic Noise
 3        Transport noise corridor: Mandatory Part (MP) 4.4 of the Queensland Development Code
          (QDC) commenced on 1 September 2010 and applies to building work for the construction or
          renovation of a residential building in a designated transport noise corridor. MP4.4 seeks to
          ensure that the habitable rooms of Class 1, 2, 3 and 4 buildings located in a transport noise
          corridor are designed and constructed to reduce transport noise. Transport noise corridor
          means land designated under Chapter 8B of the Building Act 1975 as a transport noise
          corridor. Information about transport noise corridors is available at state and local government
          offices. A free online search tool can be used to find out whether a property is located in a
          designated transport noise corridor. This tool is available at the Department of Local
          Government and Planning website (http://napmap.smarteda.qld.gov.au/planmapweb/) and
          allows searches on a registered lot number and/or property address to determine whether and
          how the QDC applies to the land.

 Further development permits, compliance permits or compliance certificates
 Public passenger transport
 4        The existing bus stop ‘Elm St at Cooroy Station, Cooroy’ (TransLink ID: 700540, Hastus ID:
          301598) will be impacted on by the development. This bus stop must be able to function and
          pedestrian access to this facility must be maintained during the construction of the
          development, including the relocation of the bus stop shelter and bin. Accordingly, if any
          temporary bus stop and pedestrian access arrangements are required, the applicant must
          reach agreement on suitable arrangements with the TMR TransLink Division
          ([email protected] or on 3851 8700) prior to any construction or works
          commencing.

 Removal of the existing access to the State-controlled Road & Works within the State-controlled
 Road Corridor


 Department of State Development, Manufacturing, Infrastructure and Planning                       Page 7 of 9

Page 8

                                                                                                1810-8094 SRA




5        Under section 33 of the Transport Infrastructure Act 1994, written approval is required from
         TMR to carry out works on a state-controlled road including:
             Removal of the existing access driveway
             Construction of the new footpath
             Relocation of the existing bus stop

         A section 33 approval must be obtained before commencing the works. For further information
         about applying for a section 33 approval, please contact TMR by phone on 07 5451 7055 or
         email [email protected] (please quote TMR18-025959).

Road corridor permit
6        Advice regarding Road Corridor Permit:
         An application for a Road Corridor Permit (RCP), is required for any ancillary works and
         encroachments on the state-controlled road under section 50(2) and Schedule 6 of the
         Transport Infrastructure Act 1994 and Part 5 and Schedule 1 of the Transport Infrastructure
         (State-Controlled Roads) Regulation 2006.

         Ancillary works and encroachments include but are not limited to awnings, advertising signs or
         other advertising devices, paths or bikeways, buildings/shelters, vegetation clearing,
         landscaping and planting.

         All proposed awnings within a state-controlled road require a Road Corridor Permit to be
         obtained from TMR. Other approvals may also be required from the local authority.
         All applications should contain the following information:
              • dimensioned plans, sections and elevations of proposal;
              • a full description of the proposed support structure, fabric, colour and fixing details; and
                  structural certification by a qualified structural engineer (RPEQ).

         To make an application for a Road Corridor Permit please refer to the following link for further
         information: https://www.tmr.qld.gov.au/Community-and-environment/Planning-and-
         development/Other-matters-requiring-approval/Road-Corridor-Permit.

         An application for a Road Corridor Permit, can be made to the Development Assessment
         Team via [email protected] of TMR (please quote TMR18-025959).

         Advice regarding proposed awnings:
             Multiple awnings in the road corridor appear to be supported by posts.
             If posts are used in the design, these must be cosmetic only (not structural).
             Awnings proposed must be able to withstand an errant vehicle driving into a post,
                 without collapse.
             Awnings must be cantilevered out from the building and must be removable.
             Awnings must be removed if needed by TMR, or the permit expires/is cancelled.
             A Road Corridor Permit from TMR must be held for the awnings at all times (the permit
                 must cover construction, operation and ultimate removal.) The permit is NOT
                 transferrable. Any change in ownership would require the new owner to apply for a
                 new permit in their own name.
             TMR has concerns with the proximity of the awnings to several power poles. The
                 applicant must check with Energex to ensure appropriate offsets are maintained.
             Power poles may NOT be relocated closer to the road carriageway to achieve this
                 offset.

         Advice regarding proposed plantings in the state-controlled road corridor
              Details of the proposed plantings in the road corridor are to be provided to TMR.
              Any plantings must comply with TMR's Landscaping manual, and not pose a hazard to
                 traffic (eg must not block sight lines, must not block visibility to pedestrians using
                 crossing location, must not block visibility to people using the bus stop, must be
                 frangible, must not obstruct operation of the bus stop, must not damage adjacent road
                 pavements, must be able to be maintained without traffic control being required.


Department of State Development, Manufacturing, Infrastructure and Planning                         Page 8 of 9

Page 9

                                                                                           1810-8094 SRA




                  Any landscaping must be maintained by either the property owner or council. TMR will
                   require documentation in writing, showing who will be responsible for long-term
                   maintenance of the landscaping. TMR will NOT be responsible for any maintenance of
                   the landscaping.




Department of State Development, Manufacturing, Infrastructure and Planning                    Page 9 of 9

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.