1810-8094 SRA Response with conditions MCU18-0158
Attached to the e-mail SARA Response with conditions - MCU18/0158.
1810-8094 SRA
5 Under section 33 of the Transport Infrastructure Act 1994, written approval is required from
TMR to carry out works on a state-controlled road including:
Removal of the existing access driveway
Construction of the new footpath
Relocation of the existing bus stop
A section 33 approval must be obtained before commencing the works. For further information
about applying for a section 33 approval, please contact TMR by phone on 07 5451 7055 or
email [email protected] (please quote TMR18-025959).
Road corridor permit
6 Advice regarding Road Corridor Permit:
An application for a Road Corridor Permit (RCP), is required for any ancillary works and
encroachments on the state-controlled road under section 50(2) and Schedule 6 of the
Transport Infrastructure Act 1994 and Part 5 and Schedule 1 of the Transport Infrastructure
(State-Controlled Roads) Regulation 2006.
Ancillary works and encroachments include but are not limited to awnings, advertising signs or
other advertising devices, paths or bikeways, buildings/shelters, vegetation clearing,
landscaping and planting.
All proposed awnings within a state-controlled road require a Road Corridor Permit to be
obtained from TMR. Other approvals may also be required from the local authority.
All applications should contain the following information:
• dimensioned plans, sections and elevations of proposal;
• a full description of the proposed support structure, fabric, colour and fixing details; and
structural certification by a qualified structural engineer (RPEQ).
To make an application for a Road Corridor Permit please refer to the following link for further
information: https://www.tmr.qld.gov.au/Community-and-environment/Planning-and-
development/Other-matters-requiring-approval/Road-Corridor-Permit.
An application for a Road Corridor Permit, can be made to the Development Assessment
Team via [email protected] of TMR (please quote TMR18-025959).
Advice regarding proposed awnings:
Multiple awnings in the road corridor appear to be supported by posts.
If posts are used in the design, these must be cosmetic only (not structural).
Awnings proposed must be able to withstand an errant vehicle driving into a post,
without collapse.
Awnings must be cantilevered out from the building and must be removable.
Awnings must be removed if needed by TMR, or the permit expires/is cancelled.
A Road Corridor Permit from TMR must be held for the awnings at all times (the permit
must cover construction, operation and ultimate removal.) The permit is NOT
transferrable. Any change in ownership would require the new owner to apply for a
new permit in their own name.
TMR has concerns with the proximity of the awnings to several power poles. The
applicant must check with Energex to ensure appropriate offsets are maintained.
Power poles may NOT be relocated closer to the road carriageway to achieve this
offset.
Advice regarding proposed plantings in the state-controlled road corridor
Details of the proposed plantings in the road corridor are to be provided to TMR.
Any plantings must comply with TMR's Landscaping manual, and not pose a hazard to
traffic (eg must not block sight lines, must not block visibility to pedestrians using
crossing location, must not block visibility to people using the bus stop, must be
frangible, must not obstruct operation of the bus stop, must not damage adjacent road
pavements, must be able to be maintained without traffic control being required.
Department of State Development, Manufacturing, Infrastructure and Planning Page 8 of 9