REPORT

                                                              Appendix O

                                                     SDAP Code Responses




PR139784 | Town Planning Report | v4 | 5 June 2019
rpsgroup.com
Log in to download the original file

Appendix O - SDAP Code Responses (002).pdf · 212 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 21 pages

Page 2

State code 1: Development in a state-controlled road
environment
Table 1.2.1: Development in a state-controlled road environment
  Performance outcomes                                 Acceptable outcomes                                  Response
  Buildings and structures
  PO1 The location of buildings, structures,           AO1.1 Buildings, structures, infrastructure,         Complies with PO1
  infrastructure, services and utilities does not      services and utilities are not located in a state-   The buildings on-site are setback at a significant
  create a safety hazard in a state-controlled road,   controlled road.                                     distances from the state-controlled roads, and do
  or cause damage to, or obstruct road transport       AND                                                  not create a safety hazard for the roads from the
  infrastructure                                       AO1.2 Buildings, structures, infrastructure,         proposed access as proven by the Site Access
                                                       services and utilities can be maintained without     Advice letter included as Appendix F.
                                                       requiring access to a state-controlled road.
  PO2 The design and construction of Buildings         AO2.1 Facades of buildings and structures            AO2.1 Complies
  and structures does not create a safety hazard       facing a state-controlled road are made of non-      Facades of structures are made from non-
  by distracting users of a state-controlled road.     reflective materials.                                reflective materials.
                                                       OR
                                                       AO2.2 Facades of buildings and structures do
                                                       not reflect point light sources into the face of
                                                       oncoming traffic on a state-controlled road.
                                                       AND
                                                       AO2.3 External lighting of buildings and
                                                       structures is not directed into the face of
                                                       oncoming traffic on a state-controlled road and
                                                       does not involve flashing or laser lights.
                                                       AND
                                                       AO2.4 Advertising devices visible from a state-
                                                       controlled road are located and designed in
                                                       accordance with the Roadside advertising guide,
                                                       Department of Transport and Main Roads, 2013.

State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                        Page 1 of 21

Page 3

  Performance outcomes                                       Acceptable outcomes                                  Response
  PO3 Road, pedestrian and bikeway bridges over              AO3.1 Road, pedestrian and bikeway bridges           Not Applicable
  a state-controlled road are designed and                   over a state-controlled road include throw           No bridges over state-controlled roads are
  constructed to prevent projectiles from being              protection screens in accordance with section        proposed.
  thrown onto a state-controlled road.                       4.9.3 of the Design criteria for bridges and other
                                                             structures manual, Department of Transport and
                                                             Main Roads, 2014.
  Filling, excavation and retaining structures
  PO4 Filling and excavation does not interfere              No acceptable outcome is prescribed.                 PO4 Complies
  with, or result in damage to, infrastructure or                                                                 Filling will not interfere with any component of a state-
  services in a state-controlled road.                                                                            controlled road except where new access is created.

  Note: Information on the location of services and
  public utility plants in a state-controlled road can be
  obtained from the Dial Before You Dig service.

  Where development will impact on an existing or
  future service or public utility plant in a state-
  controlled road such that the service or public utility
  plant will need to be relocated, the alternative
  alignment must comply with the standards and design
  specifications of the relevant service or public utility
  provider, and any costs of relocation are to be borne
  by the developer.
  PO5 Filling, excavation, building foundations and          No acceptable outcome is prescribed.                 PO5 Complies
  retaining structures do not undermine, or cause                                                                 See response to PO4.
  subsidence of, a state-controlled road.

  Note: To demonstrate compliance with this
  performance outcome, it is recommended an RPEQ
  certified geotechnical assessment, prepared in
  accordance with Volume 3 of the Road Planning And
  Design Manual 2nd edition, Department of Transport
  and Main Roads, 2016, is provided.


State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                                  Page 2 of 21

Page 4

  Performance outcomes                                  Acceptable outcomes                                  Response
  PO6 Filling, excavation, building foundations and     No acceptable outcome is prescribed.                 PO6 Complies
  retaining structures do not cause ground water                                                             See response to PO4.
  disturbance in a state-controlled road.

  Note: To demonstrate compliance with this
  performance outcome, it is recommended an RPEQ
  certified geotechnical assessment, prepared in
  accordance with Volume 3 of the Road planning and
  design manual 2nd edition, Department of Transport
  and Main Roads, 2016, is provided.
  PO7 Excavation, boring, piling, blasting or fill      No acceptable outcome is prescribed.                 PO7 Complies
  compaction during construction of a                                                                        Proposed works will not cause damage to the state-
  development does not result in ground                                                                      controlled road.
  movement or vibration impacts that would cause
  damage or nuisance to a state-controlled road,
  road transport infrastructure or road works.

  Note: To demonstrate compliance with this
  performance outcome, it is recommended an RPEQ
  certified geotechnical assessment, prepared in
  accordance with Volume 3 of the Road Planning And
  Design Manual 2nd edition, Department of Transport
  and Main Roads, 2016, is provided.
  PO8 Development involving the haulage of fill,        AO8.1 Fill, extracted material and spoil material  PO8 Complies
  extracted material or excavated spoil material        is not transported to or from the development site The quantity of transported material will be managed
  exceeding 10,000 tonnes per year does not             on a state-controlled road.                        to ensure no damage is caused to state-controlled
  damage the pavement of a state-controlled road.                                                            roads.

  Note: It is recommended a pavement impact
  assessment is provided in accordance with the Guide
  to Traffic Impact Assessment, Department of
  Transport and Main Roads, 2017.
  PO9 Filling and excavation associated with the        No acceptable outcome is prescribed.                 PO9 Complies
  construction of vehicular access to a                                                                      See response to PO4.

State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                          Page 3 of 21

Page 5

  Performance outcomes                                  Acceptable outcomes                                    Response
  development does not compromise the operation
  or capacity of existing drainage infrastructure for
  a state-controlled road.
  PO10 Fill material used on a development site         AO10.1 Fill material is free of contaminants           PO10 Complies
  does not result in contamination of a state-          including acid sulfate content.                        See response to PO4.
  controlled road.
                                                        Note: Soils and rocks should be tested in accordance
                                                        with AS 1289.0 – Methods of testing soils for
                                                        engineering purposes and AS 4133.0-2005 –
                                                        Methods of testing rocks for engineering purposes.
                                                        AND
                                                        AO10.2 Compaction of fill is carried out in
                                                        accordance with the requirements of AS 1289.0
                                                        2000 – Methods of testing soils for engineering
                                                        purposes.
  PO11 Filling and excavation does not cause            AO11.1 Compaction of fill is carried out in            PO11 Complies
  wind-blown dust nuisance in a state-controlled        accordance with the requirements of AS 1289.0          Dust nuisance will be appropriately managed through
  road.                                                 2000 – Methods of testing soils for engineering        a construction-management plan.
                                                        purposes.
                                                        AND
                                                        AO11.2 Dust suppression measures are used
                                                        during filling and excavation activities such as
                                                        wind breaks or barriers and dampening of
                                                        ground surfaces.
  Stormwater and drainage
  PO12 Development does not result in an                No acceptable outcome is prescribed.                   PO12 Complies
  actionable nuisance, or worsening of,                                                                        See Appendix G – Stormwater Management Report.
  stormwater, flooding or drainage impacts in a
  state-controlled road.
  PO13 Run-off from the development site is not         AO13.1 Development does not create any new             PO13 Complies
  unlawfully discharged to a state-controlled road.     points of discharge to a state-controlled road.        See Appendix G – Stormwater Management Report
                                                        AND

State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                            Page 4 of 21

Page 6

  Performance outcomes                               Acceptable outcomes                                       Response
                                                     AO13.2 Stormwater run-off is discharged to a
                                                     lawful point of discharge.

                                                     Note: Section 3.4 of the Queensland Urban Drainage
                                                     Manual, Department of Energy and Water Supply,
                                                     2013, provides further information on lawful points of
                                                     discharge.
                                                     AND
                                                     AO13.3 Development does not worsen the
                                                     condition of an existing lawful point of discharge
                                                     to the state-controlled road.
  PO14 Run-off from the development site during      AO14.1 Run-off from the development site                  PO14 Complies
  construction does not cause siltation of           during construction is not discharged to                  See Appendix G – Stormwater Management Report
  stormwater infrastructure affecting a state-       stormwater infrastructure for a state-controlled
  controlled road.                                   road.
  Vehicular access to a state-controlled road
  PO15 Vehicular access to a state-controlled road   AO15.1 Development does not require new or                PO15 Complies
  that is a limited access road is consistent with   changed access to a limited access road.                  See Appendix F – Site Access Advice
  government policy for the management of limited
  access roads.                                      Note: Limited access roads are declared by the
                                                     transport chief executive under section 54 of the
                                                     Transport Infrastructure Act 1994 and are identified in
                                                     the DA mapping system.
                                                     OR
                                                     AO15.2 A new or changed access to a limited
                                                     access road is consistent with the limited access
                                                     policy for the state-controlled road.

                                                     Note: Limited access policies for limited access roads
                                                     declared under the Transport Infrastructure Act 1994
                                                     can be obtained by contacting the relevant
                                                     Department of Transport and Main Roads regional
                                                     office.
                                                  AND
State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                           Page 5 of 21

Page 7

  Performance outcomes                                    Acceptable outcomes                                       Response
                                                          AO15.3 Where a new or changed access is for a
                                                          service centre, access is consistent with the
                                                          Service centre policy, Department of Transport
                                                          and Main Roads, 2013 and the Access policy for
                                                          roadside service centre facilities on limited
                                                          access roads, Department of Transport and Main
                                                          Roads, 2013, and the Service centre strategy for
                                                          the state-controlled road.

                                                          Note: The Service centre policy, Department of
                                                          Transport and Main Roads, 2013, Access policy for
                                                          roadside service centre facilities, Department of
                                                          Transport and Main Roads, 2013 and the relevant
                                                          Service centre strategy for a state-controlled road can
                                                          be accessed by contacting the relevant Department of
                                                          Transport and Main Roads regional office.
  PO16 The location and design of vehicular               AO16.1 Vehicular access is provided from a                PO16 Complies
  access to a state-controlled road (including            local government road.                                    See Appendix F – Site Access Advice
  access to a limited access road) does not create        OR all of the following acceptable outcomes
  a safety hazard for users of a state-controlled         apply:
  road or result in a worsening of operating
  conditions on a state-controlled road.                  AO16.2 Vehicular access for the development is
                                                          consistent with the function and design of the
  Note: Where a new or changed access between the         state-controlled road.
  premises and a state-controlled road is proposed, the   AND
  Department of Transport and Main Roads will need to     AO16.3 Development does not require new or
  assess the proposal to determine if the vehicular
                                                          changed access between the premises and the
  access for the development is safe. An assessment
  can be made by Department of Transport and Main         state-controlled road.
  Roads as part of the development assessment
  process and a decision under section 62 of Transport    Note: A decision under section 62 of the Transport
  Infrastructure Act 1994 issued where sufficient         Infrastructure Act 1994 outlines the approved
  information is provided.                                conditions for use of an existing vehicular access to a
                                                          state-controlled road. Current section 62 decisions

State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                                Page 6 of 21

Page 8

  Performance outcomes                               Acceptable outcomes                                       Response
                                                     can be obtained from the relevant Department of
                                                     Transport and Main Roads regional office.
                                                     AND
                                                     AO16.4 Use of any existing vehicular access to
                                                     the development is consistent with a decision
                                                     under section 62 of the Transport Infrastructure
                                                     Act 1994.

                                                     Note: The development which is the subject of the
                                                     application must be of an equivalent use and intensity
                                                     for which the section 62 approval was issued and the
                                                     section 62 approval must have been granted no more
                                                     than 5 years prior to the lodgement of the application.
                                                     AND
                                                     AO16.5 Onsite vehicle circulation is designed to
                                                     give priority to entering vehicles at all times so
                                                     vehicles do not queue in a road intersection or
                                                     on the state-controlled road.
  PO17 Vehicular access to a state-controlled road   AO17.1 Vehicular access and associated road               PO17 Complies
  or local government road (and associated road      access works are not located within 5 metres of           See Appendix F – Site Access Advice
  access works) are located and designed to not      existing public passenger transport
  damage or interfere with public passenger          infrastructure.
  transport infrastructure, public passenger         AND
  services or pedestrian or cycle access to public   AO17.2 The location and design of vehicular
  passenger transport infrastructure and public      access for a development does not necessitate
  passenger services.                                the relocation of existing public passenger
                                                     transport infrastructure.
                                                     AND
                                                     AO17.3 On-site vehicle circulation is designed to
                                                     give priority to entering vehicles at all times so
                                                     vehicles using a vehicular access do not obstruct
                                                     public passenger transport infrastructure and
                                                     public passenger services or obstruct pedestrian

State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                        Page 7 of 21

Page 9

  Performance outcomes                               Acceptable outcomes                                     Response
                                                     or cycle access to public passenger transport
                                                     infrastructure and public passenger services.
                                                     AND
                                                     AO17.4 The normal operation of public
                                                     passenger transport infrastructure or public
                                                     passenger services is not interrupted during
                                                     construction of the development.
  Vehicular access to local roads within 100 metres of an intersection with a state-controlled road
  PO18 The location and design of vehicular          AO18.1 Vehicular access is located as far as            PO18 Complies
  access to a local road within 100 metres of an     possible from the state-controlled road                 See Appendix F – Site Access Advice
  intersection with a state-controlled road does not intersection.
  create a safety hazard for users of a state-       AND
  controlled road.                                   AO18.2 Vehicular access is in accordance with
                                                     volume 3, parts, 3, 4 and 4A of the Road
                                                     Planning And Design Manual, 2nd edition,
                                                     Department of Transport and Main Roads, 2016.
                                                     AND
                                                     AO18.3 Onsite vehicle circulation is designed to
                                                     give priority to entering vehicles at all times so
                                                     vehicles do not queue in the intersection or on
                                                     the state-controlled road.
  Planned upgrades
  PO19 Development does not impede delivery of       AO19.1 Development is not located on land               AO19.1 Complies
  planned upgrades of state-controlled roads.        identified by the Department of Transport and           Development is not located on land identified as
                                                     Main Roads as land required for the planned             land required for the upgrade of a state-
                                                     upgrade of a state-controlled road.                     controlled road.

                                                     Note: Land required for the planned upgrade of a
                                                     state-controlled road is identified in the DA mapping
                                                     system.
                                                     OR


State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                         Page 8 of 21

Page 10

  Performance outcomes                          Acceptable outcomes                                     Response
                                                AO19.2 Development is sited and designed so
                                                that permanent buildings, structures,
                                                infrastructure, services or utilities are not located
                                                on land identified by the Department of Transport
                                                and Main Roads as land required for the planned
                                                upgrade of a state-controlled road.
                                                OR all of the following acceptable outcomes
                                                apply:

                                                AO19.3 Structures and infrastructure located on
                                                land identified by the Department of Transport
                                                and Main Roads as land required for the planned
                                                upgrade of a state-controlled road are able to be
                                                readily relocated or removed without materially
                                                affecting the viability or functionality of the
                                                development.
                                                AND
                                                AO19.4 Vehicular access for the development is
                                                consistent with the function and design of the
                                                planned upgrade of the state-controlled road.
                                                AND
                                                AO19.5 Development does not involve filling and
                                                excavation of, or material changes to, land
                                                required for a planned upgrade to a state-
                                                controlled road.
                                                AND
                                                AO19.6 Land is able to be reinstated to the pre-
                                                development condition at the completion of the
                                                use.
  Network impacts



State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                   Page 9 of 21

Page 11

  Performance outcomes                                    Acceptable outcomes                                   Response
  PO20 Development does not result in a                   No acceptable outcome is prescribed.                  PO20 Complies
  worsening of operating conditions on the state-                                                               The development will not result in a worsening of
  controlled road network.                                                                                      operating conditions on the state-controlled
                                                                                                                network.
  Note: To demonstrate compliance with this
  performance outcome, it is recommended that an
  RPEQ certified traffic impact assessment is provided,
  prepared in accordance with the Guide to Traffic
  Impact Assessment, Department of Transport and
  Main Roads, 2017.
  PO21 Development does not impose traffic                AO21.1 The layout and design of the                   Not Applicable
  loadings on a state-controlled road which could         development directs traffic generated by the          The site is in a rural area and adjoins two state-
  be accommodated on the local road network.              development to the local road network.                controlled roads and is therefore dependent on
                                                                                                                using them for connectivity.
  PO22 Upgrade works on, or associated with, a            AO22.1 Upgrade works required as a result of          AO22.1 Complies
  state-controlled road are built in accordance with      the development are designed and constructed          Proposal will comply.
  Queensland road design standards.                       in accordance with the Road planning and
                                                          design manual, 2nd edition, Department of
                                                          Transport and Main Roads, 2016.

                                                          Note: Road works in a state-controlled road require
                                                          approval under section 33 of the Transport
                                                          Infrastructure Act 1994 before the works commence.



Table 1.2.2: Environmental emissions
  Performance outcomes                                    Acceptable outcomes                                   Response
  Noise
  Accommodation activities
  PO23 Development involving an accommodation             AO23.1 A noise barrier or earth mound is              AO23.1 Complies
  activity or land for a future accommodation             provided which is designed, sited and                 The development will comply with the identified noise
  activity minimises noise intrusion from a state-        constructed:                                          criteria.

State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                              Page 10 of 21

Page 12

  Performance outcomes                                Acceptable outcomes                                         Response
  controlled road or type 1 multi-modal corridor in   1. to meet the following external noise criteria at
  habitable rooms.                                       all facades of the building envelope:
                                                         a. ≤60 dB(A) L10 (18 hour) façade corrected
                                                              (measured L90 (8 hour) free field between
                                                              10pm and 6am ≤40 dB(A))
                                                         b. ≤63 dB(A) L10 (18 hour) façade corrected
                                                              (measured L90 (8 hour) free field between
                                                              10pm and 6am >40 dB(A))
                                                      2. in accordance with chapter 7 integrated noise
                                                         barrier design of the Transport Noise
                                                         Management Code of Practice – Volume 1
                                                         Road Traffic Noise, Department of Transport
                                                         and Main Roads, 2013.

                                                      Note: To demonstrate compliance with the acceptable
                                                      outcome, it is recommended that a RPEQ certified
                                                      noise assessment report is provided, prepared in
                                                      accordance with the State Development Assessment
                                                      Provisions Supporting Information – Community
                                                      Amenity (Noise), Department of Transport and Main
                                                      Roads, 2013.

                                                      If the building envelope is unknown, the deemed-to-
                                                      comply setback distances for buildings stipulated by
                                                      the local planning instrument or relevant building
                                                      regulations should be used.

                                                      In some instances the design of noise barriers and
                                                      mounds to achieve the noise criteria above the
                                                      ground floor may not be reasonable or practicable. In
                                                      these instances, any relaxation of the criteria is at the
                                                      discretion of the Department of Transport and Main
                                                      Roads.


State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                             Page 11 of 21

Page 13

  Performance outcomes                          Acceptable outcomes                                    Response
                                                OR all of the following acceptable outcomes
                                                apply:

                                                AO23.2 Buildings which include a habitable room
                                                are setback the maximum distance possible from
                                                a state-controlled road or type 1 multi-modal
                                                corridor.
                                                AND
                                                AO23.3 Buildings are designed and oriented so
                                                that habitable rooms are located furthest from a
                                                state-controlled road or type 1 multi-modal
                                                corridor.
                                                AND
                                                AO23.4 Buildings (other than a relevant
                                                residential building or relocated building) are
                                                designed and constructed using materials which
                                                ensure that habitable rooms meet the following
                                                internal noise criteria:
                                                1. ≤35 dB(A) Leq (1 hour) (maximum hour over
                                                    24 hours).

                                                Statutory note: Noise levels from a state-controlled
                                                road or type 1 multi-modal corridor are to be
                                                measured in accordance with AS1055.1–1997
                                                Acoustics – Description and measurement of
                                                environmental noise.

                                                Note: To demonstrate compliance with the acceptable
                                                outcome, it is recommended that a RPEQ certified
                                                noise assessment report is provided, prepared in
                                                accordance with the State Development Assessment
                                                Provisions Supporting Information – Community
                                                Amenity (Noise), Department of Transport and Main
                                                Roads, 2013.
State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                  Page 12 of 21

Page 14

  Performance outcomes                                Acceptable outcomes                                     Response
                                                      Habitable rooms of relevant residential buildings
                                                      located within a transport noise corridor must comply
                                                      with the Queensland Development Code MP4.4
                                                      Buildings in a transport noise corridor, Queensland
                                                      Government, 2015. Transport noise corridors are
                                                      mapped on the DA mapping system.
  PO24 Development involving an accommodation         AO24.1 A noise barrier or earth mound is
  activity or land for a future accommodation         provided which is designed, sited and
  activity minimises noise intrusion from a state-    constructed:
  controlled road or type 1 multi-modal corridor in   1. to meet the following external noise criteria in
  outdoor spaces for passive recreation.                 outdoor spaces for passive recreation:
                                                         a. ≤57 dB(A) L10 (18 hour) free field
                                                             (measured L90 (18 hour) free field
                                                             between 6am and 12 midnight ≤45
                                                             dB(A))
                                                         b. ≤60 dB(A) L10 (18 hour) free field
                                                             (measured L90 (18 hour) free field
                                                             between 6am and 12 midnight >45
                                                             dB(A))
                                                      2. in accordance with chapter 7 integrated noise
                                                         barrier design of the Transport Noise
                                                         Management Code of Practice – Volume 1
                                                         Road Traffic Noise, Department of Transport
                                                         and Main Roads, 2013.

                                                      Note: To demonstrate compliance with the acceptable
                                                      outcome, it is recommended that a RPEQ certified
                                                      noise assessment report is provided, prepared in
                                                      accordance with the State Development Assessment
                                                      Provisions Supporting Information – Community
                                                      Amenity (Noise), Department of Transport and Main
                                                      Roads, 2013.
                                                      OR
State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                         Page 13 of 21

Page 15

  Performance outcomes                                Acceptable outcomes                                   Response
                                                      AO24.2 Each dwelling has access to an outdoor         AO24.2 Complies
                                                      space for passive recreation which is shielded        Outdoor spaces will be appropriately shielded from
                                                      from a state-controlled road or type 1 multi-         state-controlled roads from buildings and vegetation.
                                                      modal corridor by a building, solid gap-free
                                                      fence, or other solid gap-free structure.
                                                      AND
                                                      AO24.3 Each dwelling with a balcony directly          AO24.3 Complies
                                                      exposed to noise from a state-controlled road or      The development contains no balconies directly
                                                      type 1 multi-modal corridor has a continuous          facing a state-controlled road.
                                                      solid gap-free balustrade (other than gaps
                                                      required for drainage purposes to comply with
                                                      the Building Code of Australia).
  Child care centres
  PO25 Development involving a:                       AO25.1 A noise barrier or earth mound is              Not Applicable
  1. child care centre; or                            provided which is designed, sited and
  2. educational establishment                        constructed:
  minimises noise intrusion from a state-controlled   1. to meet the following external noise criteria at
  road or type 1 multi-modal corridor in indoor          all facades of the building envelope:
  education areas and indoor play areas.                 a. ≤58 dB(A) L10 (1 hour) façade corrected
                                                              (maximum hour during normal opening
                                                              hours)
                                                      2. in accordance with chapter 7 integrated noise
                                                         barrier design of the Transport Noise
                                                         Management Code of Practice – Volume 1
                                                         Road Traffic Noise, Department of Transport
                                                         and Main Roads, 2013.

                                                      Note: To demonstrate compliance with the acceptable
                                                      outcome, it is recommended that a RPEQ certified
                                                      noise assessment report is provided, prepared in
                                                      accordance with the State Development Assessment
                                                      Provisions Supporting Information – Community


State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                           Page 14 of 21

Page 16

  Performance outcomes                          Acceptable outcomes                                    Response
                                                Amenity (Noise), Department of Transport and Main
                                                Roads, 2013.

                                                If the building envelope is unknown, the deemed-to-
                                                comply setback distances for buildings stipulated by
                                                the local planning instrument or relevant building
                                                regulations should be used.
                                                OR all of the following acceptable outcomes
                                                apply:

                                                AO25.2 Buildings which include indoor education
                                                areas and indoor play areas are setback the
                                                maximum distance possible from a state-
                                                controlled road or type 1 multi-modal corridor.
                                                AND
                                                AO25.3 Buildings are designed and oriented so
                                                that indoor
                                                education areas and indoor play areas are
                                                located furthest from the state-controlled road or
                                                type 1 multi-modal corridor.
                                                AND
                                                AO25.4 Buildings are designed and constructed
                                                using materials which ensure indoor education
                                                areas and indoor play areas meet the following
                                                internal noise criteria:
                                                1. ≤35 dB(A) Leq (1 hour) (maximum hour
                                                    during opening hours).

                                                Statutory note: Noise levels from a state-controlled
                                                road or type 1 multi-modal corridor are to be
                                                measured in accordance with AS1055.1–1997
                                                Acoustics – Description and measurement of
                                                environmental noise.

State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                  Page 15 of 21

Page 17

  Performance outcomes                                Acceptable outcomes                                   Response
                                                      Note: To demonstrate compliance with the acceptable
                                                      outcome, it is recommended that a RPEQ certified
                                                      noise assessment report, prepared in accordance
                                                      with the State Development Assessment Provisions
                                                      Supporting Information – Community Amenity (Noise),
                                                      Department of Transport and Main Roads, 2013, is
                                                      provided.
  PO26 Development involving a:                       AO26.1 A noise barrier or earth mound is              Not Applicable
  1. child care centre; or                            provided which is designed, sited and
  2. educational establishment                        constructed:
  minimises noise intrusion from a state-controlled   1. to meet the following external noise criteria in
  road or type 1 multi-modal corridor in outdoor         each outdoor education area or outdoor play
  education areas and outdoor play areas.                area:
                                                         a. ≤63 dB(A) L10 (12 hour) free field
                                                             (between 6am and 6pm)
                                                      2. in accordance with chapter 7 integrated noise
                                                         barrier design of the Transport Noise
                                                         Management Code of Practice – Volume 1
                                                         Road Traffic Noise, Department of Transport
                                                         and Main Roads, 2013.

                                                      Note: To demonstrate compliance with the acceptable
                                                      outcome, it is recommended that a RPEQ certified
                                                      noise assessment report is provided, prepared in
                                                      accordance with the State Development Assessment
                                                      Provisions Supporting Information – Community
                                                      Amenity (Noise), Department of Transport and Main
                                                      Roads, 2013.
                                                      OR
                                                      AO26.2 Each outdoor education area and
                                                      outdoor play area is shielded from noise
                                                      generated from a state-controlled road or type 1
                                                      multi-modal corridor by a building, solid gap-free
                                                      fence, or other solid gap-free structure.
State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                             Page 16 of 21

Page 18

  Performance outcomes                                Acceptable outcomes                                    Response
  Hospitals
  PO27 Development involving a hospital               AO27.1 Hospitals are designed and constructed          Not Applicable
  minimises noise intrusion from a state-controlled   using materials which ensure patient care areas
  road or type 1 multi-modal corridor in patient      meet the following internal noise criteria:
  care areas.                                         1. ≤35 dB(A) Leq (1 hour) (maximum hour
                                                          during opening hours).

                                                      Statutory note: Noise levels from a state-controlled
                                                      road or type 1 multi-modal corridor are to be
                                                      measured in accordance with AS1055.1–1997
                                                      Acoustics – Description and measurement of
                                                      environmental noise.

                                                      Note: To demonstrate compliance with the acceptable
                                                      outcome, it is recommended that a RPEQ certified
                                                      noise assessment report is provided, prepared in
                                                      accordance with the State Development Assessment
                                                      Provisions Supporting Information – Community
                                                      Amenity (Noise), Department of Transport and Main
                                                      Roads, 2013.
  Vibration
  Hospitals
  PO28 Development involving a hospital               AO28.1 Hospitals are designed and constructed          Not Applicable
  minimises vibration impacts from vehicles using     to ensure vibration in the treatment area of a
  a state-controlled road or type 1 multi-modal       patient care area does not exceed a vibration
  corridor in patient care areas.                     dose value of 0.1m/s1.75.
                                                      AND
                                                      AO28.2 Hospitals are designed and constructed
                                                      to ensure vibration in the ward area of a patient
                                                      care area does not exceed a vibration dose
                                                      value of 0.4m/s1.75.



State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                              Page 17 of 21

Page 19

  Performance outcomes                                 Acceptable outcomes                                   Response
                                                       Note: To demonstrate compliance with the acceptable
                                                       outcome, it is recommended that a RPEQ certified
                                                       vibration assessment report is provided.
  Air and light
  PO29 Development involving an accommodation          AO29.1 Each dwelling has access to an outdoor         AO29.1 Complies
  activity minimises air quality impacts from a        space for passive recreation which is shielded        Outdoor spaces are appropriately sited.
  state-controlled road or type 1 multi-modal          from a state-controlled road or type 1 multi-
  corridor in outdoor spaces for passive recreation.   modal corridor by a building, solid gap-free
                                                       fence, or other solid gap-free structure.
  PO30 Development involving a:                        AO30.1 Each outdoor education area and                Not Applicable
  1. child care centre; or                             outdoor play area is shielded from a state-
  2. educational establishment                         controlled road or type 1 multi-modal corridor by
  minimises air quality impacts from a state-          a building, solid gap-free fence, or other solid
  controlled road or type 1 multi-modal corridor in    gap-free structure.
  outdoor education areas and outdoor play areas.
  PO31 Development involving an accommodation          AO31.1 Buildings for an accommodation activity        AO31.1 Complies
  activity or hospital minimises lighting impacts      or hospital are designed to minimise the number       No windows are directly facing a state-controlled
  from a state-controlled road or type 1 multi-        of windows or transparent/translucent panels          road.
  modal corridor.                                      facing a state-controlled road or type 1 multi-
                                                       modal corridor.
                                                       OR
                                                       AO31.2 Windows facing a state-controlled road
                                                       or type 1 multi-modal corridor include treatments
                                                       to block light from a state-controlled road or type
                                                       1 multi-modal corridor.


Table 1.2.3: Development in a future state-controlled road environment



State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                            Page 18 of 21

Page 20

  Performance outcomes                                  Acceptable outcomes                                     Response
  PO32 Development does not impede delivery of          AO32.1 Development is not located in a future           AO32.1 Complies
  a future state-controlled road.                       state-controlled road.                                  Development is not located in a future state-
                                                        OR                                                      controlled road.


                                                        AO32.2 Development is sited and designed so
                                                        that permanent buildings, structures,
                                                        infrastructure, services or utilities are not located
                                                        in a future state-controlled road.
                                                        OR all of the following acceptable outcomes
                                                        apply:

                                                        AO32.3 Structures and infrastructure located in a
                                                        future state-controlled road are able to be readily
                                                        relocated or removed without materially affecting
                                                        the viability or functionality of the development.
                                                        AND
                                                        AO32.4 Development does not involve filling and
                                                        excavation of, or material changes to, a future
                                                        state-controlled road.
                                                        AND
                                                        AO32.5 Land is able to be reinstated to the pre-
                                                        development condition at the completion of the
                                                        use.
  PO33 Vehicular access to a future state-              AO33.1 Development does not require new or              PO33 Complies
  controlled road is located and designed to not        changed access between the premises and a               See Appendix F – Site Access Advice.
  create a safety hazard for users of a future state-   future state-controlled road.
  controlled road or result in a worsening of           AND
  operating conditions on a future state-controlled     AO33.2 Vehicular access for the development is
  road.                                                 consistent with the function and design of the
                                                        future state-controlled road.


State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                            Page 19 of 21

Page 21

  Performance outcomes                                      Acceptable outcomes                                   Response
  Note: Where a new or changed access between the
  premises and a future state-controlled road is
  proposed, the Department of Transport and Main
  Roads will need to assess the proposal to determine
  if the vehicular access for the development is safe. An
  assessment can be made by Department of Transport
  and Main Roads as part of the development
  assessment process and a decision under section 62
  of Transport Infrastructure Act 1994 issued where
  sufficient information is provided.
  PO34 Filling, excavation, building foundations            No acceptable outcome is prescribed.                  PO34 Complies
  and retaining structures do not undermine, or                                                                   See response to PO4.
  cause subsidence of, a future state-controlled
  road.

  Note: To demonstrate compliance with this
  performance outcome, it is recommended that an
  RPEQ certified geotechnical assessment is provided,
  prepared in accordance with volume 3 of the Road
  planning and design manual, 2nd edition, Department
  of Transport and Main Roads, 2016.
  PO35 Fill material from a development site does           AO35.1 Fill material is free of contaminants          PO35 Complies
  not result in contamination of land for a future          including acid sulfate content.                       See response to PO4.
  state-controlled road.
                                                            Note: Soil and rocks should be tested in accordance
                                                            with AS1289 – Methods of testing soils for
                                                            engineering purposes and AS4133 2005 – Methods of
                                                            testing rocks for engineering purposes.
                                                            AND
                                                            AO35.2 Compaction of fill is carried out in
                                                            accordance with the requirements of AS1289.0
                                                            2000 – Methods of testing soils for engineering
                                                            purposes.


State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                         Page 20 of 21

Page 22

  Performance outcomes                                 Acceptable outcomes                                      Response
  PO36 Development does not result in an               No acceptable outcome is prescribed.                     PO36 Complies
  actionable nuisance, or worsening of,                                                                         See Stormwater Management Report –
  stormwater, flooding or drainage impacts in a                                                                 Appendix G.
  future state-controlled road.
  PO37 Run-off from the development site is not        AO37.1 Development does not create any new               PO37 Complies
  unlawfully discharged to a future state-controlled   points of discharge to a future state-controlled         See Stormwater Management Report –
  road.                                                road.                                                    Appendix G.
                                                       AND
                                                       AO37.2 Stormwater run-off is discharged to a
                                                       lawful point of discharge.

                                                       Note: Section 3.4 of the Queensland Urban Drainage
                                                       Manual, Department of Energy and Water Supply,
                                                       2013, provides further information on lawful points of
                                                       discharge.
                                                       AND
                                                       AO37.3 Development does not worsen the
                                                       condition of an existing lawful point of discharge
                                                       to the future state-controlled road.




State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                        Page 21 of 21

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗