Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Appendix O - SDAP Code Responses (002)

of 22

Page text shows just the words. Original shows the document exactly as it was published.

  Performance outcomes                                    Acceptable outcomes                                   Response
  PO20 Development does not result in a                   No acceptable outcome is prescribed.                  PO20 Complies
  worsening of operating conditions on the state-                                                               The development will not result in a worsening of
  controlled road network.                                                                                      operating conditions on the state-controlled
                                                                                                                network.
  Note: To demonstrate compliance with this
  performance outcome, it is recommended that an
  RPEQ certified traffic impact assessment is provided,
  prepared in accordance with the Guide to Traffic
  Impact Assessment, Department of Transport and
  Main Roads, 2017.
  PO21 Development does not impose traffic                AO21.1 The layout and design of the                   Not Applicable
  loadings on a state-controlled road which could         development directs traffic generated by the          The site is in a rural area and adjoins two state-
  be accommodated on the local road network.              development to the local road network.                controlled roads and is therefore dependent on
                                                                                                                using them for connectivity.
  PO22 Upgrade works on, or associated with, a            AO22.1 Upgrade works required as a result of          AO22.1 Complies
  state-controlled road are built in accordance with      the development are designed and constructed          Proposal will comply.
  Queensland road design standards.                       in accordance with the Road planning and
                                                          design manual, 2nd edition, Department of
                                                          Transport and Main Roads, 2016.

                                                          Note: Road works in a state-controlled road require
                                                          approval under section 33 of the Transport
                                                          Infrastructure Act 1994 before the works commence.



Table 1.2.2: Environmental emissions
  Performance outcomes                                    Acceptable outcomes                                   Response
  Noise
  Accommodation activities
  PO23 Development involving an accommodation             AO23.1 A noise barrier or earth mound is              AO23.1 Complies
  activity or land for a future accommodation             provided which is designed, sited and                 The development will comply with the identified noise
  activity minimises noise intrusion from a state-        constructed:                                          criteria.

State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                              Page 10 of 21
Log in to download the original file

Appendix O - SDAP Code Responses (002).pdf · 212 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.