Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Appendix O - SDAP Code Responses (002)

of 22

Page text shows just the words. Original shows the document exactly as it was published.

  Performance outcomes                                Acceptable outcomes                                     Response
                                                      Habitable rooms of relevant residential buildings
                                                      located within a transport noise corridor must comply
                                                      with the Queensland Development Code MP4.4
                                                      Buildings in a transport noise corridor, Queensland
                                                      Government, 2015. Transport noise corridors are
                                                      mapped on the DA mapping system.
  PO24 Development involving an accommodation         AO24.1 A noise barrier or earth mound is
  activity or land for a future accommodation         provided which is designed, sited and
  activity minimises noise intrusion from a state-    constructed:
  controlled road or type 1 multi-modal corridor in   1. to meet the following external noise criteria in
  outdoor spaces for passive recreation.                 outdoor spaces for passive recreation:
                                                         a. ≤57 dB(A) L10 (18 hour) free field
                                                             (measured L90 (18 hour) free field
                                                             between 6am and 12 midnight ≤45
                                                             dB(A))
                                                         b. ≤60 dB(A) L10 (18 hour) free field
                                                             (measured L90 (18 hour) free field
                                                             between 6am and 12 midnight >45
                                                             dB(A))
                                                      2. in accordance with chapter 7 integrated noise
                                                         barrier design of the Transport Noise
                                                         Management Code of Practice – Volume 1
                                                         Road Traffic Noise, Department of Transport
                                                         and Main Roads, 2013.

                                                      Note: To demonstrate compliance with the acceptable
                                                      outcome, it is recommended that a RPEQ certified
                                                      noise assessment report is provided, prepared in
                                                      accordance with the State Development Assessment
                                                      Provisions Supporting Information – Community
                                                      Amenity (Noise), Department of Transport and Main
                                                      Roads, 2013.
                                                      OR
State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                         Page 13 of 21
Log in to download the original file

Appendix O - SDAP Code Responses (002).pdf · 212 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.