Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Appendix O - SDAP Code Responses (002)

of 22

Page text shows just the words. Original shows the document exactly as it was published.

  Performance outcomes                                      Acceptable outcomes                                   Response
  Note: Where a new or changed access between the
  premises and a future state-controlled road is
  proposed, the Department of Transport and Main
  Roads will need to assess the proposal to determine
  if the vehicular access for the development is safe. An
  assessment can be made by Department of Transport
  and Main Roads as part of the development
  assessment process and a decision under section 62
  of Transport Infrastructure Act 1994 issued where
  sufficient information is provided.
  PO34 Filling, excavation, building foundations            No acceptable outcome is prescribed.                  PO34 Complies
  and retaining structures do not undermine, or                                                                   See response to PO4.
  cause subsidence of, a future state-controlled
  road.

  Note: To demonstrate compliance with this
  performance outcome, it is recommended that an
  RPEQ certified geotechnical assessment is provided,
  prepared in accordance with volume 3 of the Road
  planning and design manual, 2nd edition, Department
  of Transport and Main Roads, 2016.
  PO35 Fill material from a development site does           AO35.1 Fill material is free of contaminants          PO35 Complies
  not result in contamination of land for a future          including acid sulfate content.                       See response to PO4.
  state-controlled road.
                                                            Note: Soil and rocks should be tested in accordance
                                                            with AS1289 – Methods of testing soils for
                                                            engineering purposes and AS4133 2005 – Methods of
                                                            testing rocks for engineering purposes.
                                                            AND
                                                            AO35.2 Compaction of fill is carried out in
                                                            accordance with the requirements of AS1289.0
                                                            2000 – Methods of testing soils for engineering
                                                            purposes.


State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                                         Page 20 of 21
Log in to download the original file

Appendix O - SDAP Code Responses (002).pdf · 212 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.