Original source · versioned page text
Appendix O - SDAP Code Responses (002)
Performance outcomes Acceptable outcomes Response
Note: Where a new or changed access between the
premises and a future state-controlled road is
proposed, the Department of Transport and Main
Roads will need to assess the proposal to determine
if the vehicular access for the development is safe. An
assessment can be made by Department of Transport
and Main Roads as part of the development
assessment process and a decision under section 62
of Transport Infrastructure Act 1994 issued where
sufficient information is provided.
PO34 Filling, excavation, building foundations No acceptable outcome is prescribed. PO34 Complies
and retaining structures do not undermine, or See response to PO4.
cause subsidence of, a future state-controlled
road.
Note: To demonstrate compliance with this
performance outcome, it is recommended that an
RPEQ certified geotechnical assessment is provided,
prepared in accordance with volume 3 of the Road
planning and design manual, 2nd edition, Department
of Transport and Main Roads, 2016.
PO35 Fill material from a development site does AO35.1 Fill material is free of contaminants PO35 Complies
not result in contamination of land for a future including acid sulfate content. See response to PO4.
state-controlled road.
Note: Soil and rocks should be tested in accordance
with AS1289 – Methods of testing soils for
engineering purposes and AS4133 2005 – Methods of
testing rocks for engineering purposes.
AND
AO35.2 Compaction of fill is carried out in
accordance with the requirements of AS1289.0
2000 – Methods of testing soils for engineering
purposes.
State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment Page 20 of 21
See the original