Council archive · source document
2008/0169 Response to information request - 71 Seaview Tce Sunshine Beach · 132008.169
Very large file (31.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
DIRECT RUNOFF FROM PAD INTO CATCH DRAIN -CONSTRUCTION EXIT TO BE 3.Om WIDE
TEMPORARY KE
ROADWAY
EXISTING ROA
SUCTION SITE
CONSTRUCTION EXIT
SAND BAG AROUND
INLET TO STOP
SILT ENTERING GULLY
1.2 VARIES 2.0 0.3
SEDIMENT FENCE
CUT OFF DRAIN DETAIL PAVEMENT
ROGRAM FOR SEDIMENT FENCES N.T.S.
ECTIONS WILL BE REQUIRED TO CONTROL
>ED BY ON SITE VEHICLES OR MOVEMENT CONSTRUCTION NOTES:
S. 1. AVOID REMOVING TREES AND SHRUBS IF
:TER EACH STORM EVENT THAT RESULTS POSSIBLE - WORK AROUND THEM. GULLY INLET PROTE
2. ENSURE THE STRUCTURES ARE FREE OF
--SS SEDIMENT DEPOSITS. PROJECTIONS OR OTHER IRREGULARITIES
THE SOURCE OF ANY EXCESSIVE SEDIMENT. THAT COULD IMPEDE WATER FLOW. MAINTENANCE PROGRAM FOR GULLY INLET PR
EBMP GROUP 5 FIG.5.6).
. ENSURE THE BANKS ARE PROPERLY
1. REGULAR INSPECTIONS AFTER EACH RUNOF
-MANAGEMENT COMPACTED TO PREVENT FAILURE.
TO ENSURE THAT THE PROTECTION DEVICE I
ES ARE TO BE EMPLOYED WHERE 4. COMPLETE PERMANENT OR TEMPORARY
IN PLACE AND ANY EXCESSIVE SEDIMENT DEI
RING CONSTRUCTION REQUIRE THE STABILISATION WITHIN 10 DAYS OF ARE TO BE REMOVED.
IY POSSIBLE SEDIMENT MOVEMENT CONSTRUCTION.
DIRECTED BY THE SUPERVISOR.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2008/0169 Response to information request - 71 Seaview Tce Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 31.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.