EROSION AND SEDIMENT CONTROL
DAILY SITE CHECK LIST
( nurtllnstormWater
(T pollution onyour building the
Location of site
Site Supervisor
It is suggested that the site supervisor completes the following checklist daily while site work occurs.
TIMING
O m ' n
y c s D 0 0
ITEM AND/OR LOCATION TO CHECK
a. to 0-
Q c.
O
0 C
0
N S
rD
a. Have the tradespeople and suppliers been made aware of the
requirements for erosion and sediment control, and the consequences
involved if there is a breach?
b. If required, has an Erosion and Sediment Control Management Plan been
prepared and approved?
• Are all contractors and subcontractors aware of the contents of this plan?
c. Is the builder's sign displayed?
d. Are the sediment fences erected adequately/correctly?
NOTE:
• Geotextile sediment fence buried at least 200 mm below ground.
• Posts installed at minimum 2m spacing.
• Built up sediment should not exceed 1/3 of the height of the sediment fence.
• No tears or rips.
• Not laying down or covered over by materials.
• Is there an advisory/attention sign on the sediment fence?
e. Is the stabilised entry/exit point (rumble pad) in the correct location?
' oorE
• Are all tradespeople/suppliers using this entry point?
f. Does the entry/exit point (rumble pad) require maintenance?
N YE:
• Has the entry/exit pad got excessive sediment in it?
• Turn over with a machine to expose the coarse aggregate again.
• Aggregate must be 40 mm or greater.
• Is there a bunding/diversion drain above the stabilised entry/exit point
(rumble pad) to divert sediment behind the sediment fence?
• Are the tradespeople using an adjacent lot to gain entry to the site?
If so, has permission been sought from the land owner(s) and are there
control measures in place to prevent the movement of sediment off the
lot and into the gutter?
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2008/0169 Response to information request - 71 Seaview Tce Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 31.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.