Council archive · source document
2008/0169 Response to information request - 71 Seaview Tce Sunshine Beach · 132008.169
Very large file (31.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
wetland and national park as a result of development of the site; and
12.2 Address whether any of the wetlands surrounding the site are dependent on surface or
groundwater flows and whether construction or operation of the development will change the
hydrology of the site to the extent that the development is likely to affect the function and any
vegetation composition of the wetlands; and
12.3 Recommend mitigation and management strategies to reduce the extent of the predicted
impacts to the National Park and Wetland.
Please find enclosed our response to each of these matters. I trust that the enclosed information is adequate
and enables Council to finalise its assessment of the application.
If there are any matters that you wish to discuss please do not hesitate to contact me.
Sincerely,
Dan Clowes
Director
CC via email: Gavin Maddock, Gavin Maddock Design
Encl.: Stormwater Management Plan (Jones, Flint and Pike 2010)
Soil and Water Management Plan (Jones, Flint and Pike 2010)
214
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2008/0169 Response to information request - 71 Seaview Tce Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 31.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.