Skip to the record
Every meeting, every word.

Council archive · source document

2008/0169 Response to information request - 71 Seaview Tce Sunshine Beach · 132008.169

of 171

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (31.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

The report will include current site condition, address each management zone and detail any significant
issues with the work completed and required. Areas where corrective action is required will be
highlighted in the report with the corrective action outlined.

5.12     Corrective Action

During the 3 year work plan, corrective action will be the responsibility of the contractor and from then
the land owner. Corrective action will be required in instances of non-compliance with the Vegetation
Management work plans.

5.13     Revegetation Floristic and Structural Performance Criteria

Sunshine Coast Regional Council Planning Policy requires that performance criteria be developed to
ensure that "milestones based upon floristic and structural parameters" are achieved in the project.
These benchmarks will then be relied upon by the applicant (or applicants representative) to facilitate
release of bonds held by the Council back to the applicant, during the three year maintenance period.

Basic structural and floristic indicators have been developed for applicable zones for both assisted
natural regeneration and revegetation areas. These indicators can be readily assessed and can provide
an adequate basis upon which to simplistically measure the success of the rehabilitation works.

Like most rehabilitation projects it is likely that there will be various degrees of success throughout the
site even with a good standard of maintenance, monitoring and commitment to the rehabilitation works.
This is due the various mitigating influences that may occur throughout the establishment period and the
variation of threatening processes which will vary spatially and temporally.




[Slinger Residence - Revegetation and Rehabilitation PlanI                                Page 16

Used in these records

About this file

File size
31.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2008_0169 Response to information request - 71 Seaview Tce Sunshine Beach.pdf · 31.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.