Council archive · source document
2008/0169 Response to information request - 71 Seaview Tce Sunshine Beach · 132008.169
Very large file (31.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
APPENDIX A
Regeneration Areas Second Year Third Year
First Year
1 2 3 4 5 6 7 8 9 1 1 1 1 2 3 4 5 6 7 8 9 1 1 1 1 2 3 4 5 6 7 8 9 1 1 1
Month 0 1 2 0 1 0
2 1 2
Site preparation,
demarcation of
management zone
Removal of rubbish,
establishment of nest
boxes, large woody
debris
Removal of large
weed trees
Assisted Natural
Regeneration
Maintain edge of
zone, brushcutting,
mowing
Monitoring
Revegetation Areas Second Year Third Year
First Year
1 2 3 4 5 6 7 8 9 I I 1 I 2 3 4 5 6 7 8 9 1 2 4 6 7 9
Month 0 1 2
I
0
I
1
I
2
3 5 8 I
0
1
1
I
2
Site preparation.
demarcation of
management zone
Initial clearing of
weed species and
tidying up
Planting tube stock
Follow up weeding
Maintain edge of
zone, brushcutting,
mowing
Monitoring
24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2008/0169 Response to information request - 71 Seaview Tce Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 31.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.