-4-
not compromised, and address whether any development applications and owners
consent is required for use of other properties off site associated with any construction
activities.
Response:
A Preliminary Construction Management Plan is included in section 3.4 of the Structural Design
Concept Report prepared by Tod Consulting Engineers (Attachment 3). This preliminary plan
indicates likely staging and construction approach and associated numbers of contactors, and
demonstrates that construction management can be achieved without impacts to adjoining lands.
Preparation of a final construction management plan is subject to detailed design and the
appointed Contractor. A standard condition can be imposed requiring submission and approval of
a construction management plan prior to commencement of work.
10. Council is currently assessing the Geotechnical study and in this regard any further information
will follow.
Response:
Councils comment is acknowledged. No information requested or response required.
Environment and Landscape Unit
11. Fauna Survey
The Sea view Terrace Ecological Assessment Report for Adrian Slinger By Chenoweth dated 24
March 2009 (the EAR) admits unknown impact upon the values of the adjacent National Park:
Given the vegetated nature of the site, its close proximity to Noosa National Park, and presence of
a vegetated waterway, any development on the site can potentially affect these values. p21.
Given the admitted potential negative impact to the native species on the site and the adjacent
National Park the one day flora and fauna assessment, which was restricted to the site only, is
considered inadequate. This is particularly so given that very few amphibians would have been
sited during the height of summer, as admitted by Chenoweth on p18.
Applicant admits in section 4.3 that fauna from the adjacent National Park could well use the site,
and the fauna assessment therefore should incorporate an on ground assessment of the fauna
within the Park.
In this regard the applicant is to undertake a five day and night fauna survey as required in
section 4.1 of Noosa Planning Scheme PSP18 Ecological Assessment Guidelines. The survey is to
be undertaken using the methodology in section 7 of PSP18 and all methods shall also conform to
Queensland EPA's Guidelines for Flora and Fauna Surveys (1999) and include the following;
11.1. the survey is to include an area of at least 100m into the adjacent National Park,
appropriate licenses will need to be applied for and approved by DERM.
11.2. the survey is to undertaken at an appropriate time and weather conditions to capture the
greatest diversity of species, particularly amphibians.
Response:
A Fauna response has been prepared by Litoria Consulting and included in Attachment 5. The extent
of fauna survey requested is considered excessive for the proposal and not achievable as it is highly
unlikely that DERM would provide approval for the survey within the National Park (which in any event
is not reasonable). As a result of discussion with Council it was determined that potential impact
upon amphibian species is the most important fauna consideration. The correspondence from Litoria
indicates that the proposed site development actions in accordance with the Vegetation Management
Concept Plan, Rehabilitation Plan (Attachment 6), Stormwater Management Plan will minimize and
mitigate potential impacts on fauna habitats present on the site.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2008/0169 Response to information request - 71 Seaview Tce Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 31.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.