2008/0169 Response to information request - 71 Seaview Tce Sunshine Beach · 132008.169

of 171

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (31.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

                                              Figure 3 - External Catchment Plan

3.3     CO-EFFICIENT OF RUNOFF

To be conservative the adjoining properties to the west were assumed to have a fraction impervious of 0.60 from
aerial photography. A C10 value of 0.82 was assumed from Table 4.05.3 (a), QUDM, 2"d Edition, 2007.

3.4     TIME OF CONCENTRATION

Due to the steep grade of the adjoining allotments the time of concentration of the external catchment was
assumed to be 5 minutes from Table 4.06.1, QUDM, 2Edition, 2007.


3.5     RAINFALL INTENSITIES

The rainfall intensities for the catchment discharging to the western boundary of the site were determined from
the IFD chart for the Noosa Region calculated from AR&R, 1987.
                                                    Table 1 - Rainfall Intensities

       Time of Concentration         1 year          2 year       5 year        10 year        20 year        50 year       100 year
                  (mins)            (mm/hr)         (mm/hr)     (mm/hr)         (mm/hr)        (mm/hr)        (mm/hr)       (mm/hr)

                   5.0                 129      I      163          201            223              253   I     291     I     321

3.6     FLOWS (UNMITIGATED)

The flow discharging to the western boundary of the site is shown below for a range of storm events.


                                                    Table 2 - Flows (Unmitigated)
      Catchment      QI (m3/s)     Q2 (m3/s)        Q5 (m3/s)    Q10 (m3/s)         Q20 (m3/s) fQ50(m3/s)               Q100 (m3/s)

       External            0.087     0.116            0.160           0.187              0.223            0.281             0.323




 SITE BASED STORMWATER MANAGEMENT PLAN - Revision D             ! Se-view Terrace. Sunshine Beach

Used in these records

About this file

File size
31.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2008_0169 Response to information request - 71 Seaview Tce Sunshine Beach.pdf · 31.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.