Figure 3 - External Catchment Plan
3.3 CO-EFFICIENT OF RUNOFF
To be conservative the adjoining properties to the west were assumed to have a fraction impervious of 0.60 from
aerial photography. A C10 value of 0.82 was assumed from Table 4.05.3 (a), QUDM, 2"d Edition, 2007.
3.4 TIME OF CONCENTRATION
Due to the steep grade of the adjoining allotments the time of concentration of the external catchment was
assumed to be 5 minutes from Table 4.06.1, QUDM, 2Edition, 2007.
3.5 RAINFALL INTENSITIES
The rainfall intensities for the catchment discharging to the western boundary of the site were determined from
the IFD chart for the Noosa Region calculated from AR&R, 1987.
Table 1 - Rainfall Intensities
Time of Concentration 1 year 2 year 5 year 10 year 20 year 50 year 100 year
(mins) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr)
5.0 129 I 163 201 223 253 I 291 I 321
3.6 FLOWS (UNMITIGATED)
The flow discharging to the western boundary of the site is shown below for a range of storm events.
Table 2 - Flows (Unmitigated)
Catchment QI (m3/s) Q2 (m3/s) Q5 (m3/s) Q10 (m3/s) Q20 (m3/s) fQ50(m3/s) Q100 (m3/s)
External 0.087 0.116 0.160 0.187 0.223 0.281 0.323
SITE BASED STORMWATER MANAGEMENT PLAN - Revision D ! Se-view Terrace. Sunshine Beach
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2008/0169 Response to information request - 71 Seaview Tce Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 31.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.