-3-
9.3. maximum number of contractors expected on site at one time and correlating location
of parking for those contractors. Parking Is not permitted in Councils carpark on
Seaview Terrace and limited or no parking In the surrounding streets.
9.4. loading and unloading areas at each stage of construction
9.5. location of equipment storage at each stage of construction
With respect to the above, the Construction Management Plan must demonstrate that
the use rights of neighbouring properties that utilise the Seaview Terrace access are
not compromised, and address whether any development applications and owners
consent is required for use of other properties off site associated with any construction
activities.
10. Council is currently assessing the Geotechnical study and in this regard any further
Information will follow.
Environment and Landscape Unit
11. Fauna Survey
The Seaview Terrace Ecological Assessment Report for Adrian Slinger By Chenoweth dated
24 March 2009 (the EAR) admits unknown impact upon the values of the adjacent National
Park: Given the vegetated nature of the.site, its close proximity to Noose National Park, and
presence of a vegetated waterway, any development on the site can potentially affect these
values. p21.
Given the admitted potential negative Impact to the native species on the site and the. adjacent
National Park the one day flora and fauna assessment, which was restricted to the site only, is
considered Inadequate. This is particularly so given that very few amphibians would have
been sited during the height of summer,J as admitted by Chenoweth on p18.
%
Applicant admits in section 4.3 that fauna from the adjacent National Park could well use the
site, and the fauna assessment therefore should incorporate an on ground assessment of the
fauna within the Park.
In this regard the applicant is to undertake a five day and night fauna survey as required In
section 4.1 of Noosa Planning Scheme PSP18 Ecological Assessment Guidelines. The survey
Is to be undertaken using the methodology in section 7 of PSP1 8 and all methods shall also
conform to Queensland EPA's Guidelines for Flora and Fauna Surveys (1999) and include the
following;
11.1. the survey Is to include an area of at least 100m into the adjacent National Park,
appropriate licenses will need to be applied for and approved by DERM.
11.2. the survey is to undertaken at an appropriate time and weather conditions to capture
the greatest diversity of species, particularly amphibians.
12. Ground Water and Surface Water Impacts
The Applicant has been previously requested by Council (30th April 09) to provide detailed
assessment of the variations to and the impact upon the water quality and quantity on both the
surface subsurface water drainage. This has not been provided. It Is only once this Information
Is provided that an adequate assessment on the flora and fauna on the wetland on the site
and that In the adjacent National Park can be assessed.
Applicant is to provide a detailed assessment of the variations to and the Impact upon the
water quality and quantity on both the surface subsurface water drainage and conduct a
detailed assessment as the potential Impact the disturbance will have upon the flora and fauna
both within and adjacent to the site.
12.1 provide an explanation as to the type and cause of the Impacts predicted to the
wetland and national park as a result of development of the site; and
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2008/0169 Response to information request - 71 Seaview Tce Sunshine BeachRelated documentApplication case desk ↗
About this file
- File size
- 31.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.