Council archive · source document
SUPERSEDED Amended Decision Notice - 010.2007.00002062.001 [As Published] · 132007.2062
2007/2062
6262 Sheet 3 Floor Plan – Level 2 – Marcoola Design 20 April 2008
Group
6262 Sheet 4 Floor Plan – Level 3 – Marcoola Design 20 April 2008
Group
6262 Sheet 5 Elevation B – Marcoola Design Group 20 April 2008
6262 Sheet 6 Elevation C & Elevation D – Marcoola 20 April 2008
Design Group
SC-1705 A01 Site Drainage Layout – Empire November 2008
Consulting Engineers
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The applicant is advised that development contributions and infrastructure charges applicable
to this development approval have been based on the following Uses Class/ Uses and
applicable quantities:-
Existing Development Approved Development
Existing Use Class Approved Use Class
Existing Quantity Approved Quantity
/ Use / Use
Multiple Housing -
Detached House Vacant Land 2 x 3 Bedroom Units
Type 2 – Duplex
2. The applicant is informed that approval of this development application will trigger an
Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
Charges Plan for the estimated amount of $4,051 and is subject to variations in the Consumer
Price Index, All Groups Brisbane from September 2008 until the date of payment. An
Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
Planning Act 1997.
3. The applicant is informed that payment via credit card transaction will not be an acceptable
method of payment for development contributions conditioned in this permit or for
infrastructure charge notices issued separately.
4. The applicant is advised that a Compliance Permit for all plumbing and drainage works within
the boundaries of the development site must be obtained from Council’s Plumbing Services
Section prior to obtaining a Development Permit for Building Works.
5. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
the cost of operational works exceeds $80,000, then a portable long service leave levy is
required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
the approved form issued by the Building and Construction Industry (Portable Long Service
Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
declaration outlining the cost of the operational works must be submitted to Council with the
lodgement of any application for operational works over the site.
6. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:-
6.1 On a Sunday or public holiday, at any time; or
6.2 On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
Page 7 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Amended Decision Notice - 010.2007.00002062.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 73 KB (small file)
- File type
No other editions are linked here.