Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council
in respect of enforcing performance of this permit. Council reserves the right to call upon
the bond or guaranteed sum referred to in this approval to effect compliance with
conditions.
LAND DEVELOPMENT
Car Parking
8. The proposed shade structures shall be constructed such that they do not impede the
existing carapaces and aisle to such an extent that they no longer comply with AS/NZS
2890.1:2004 for user class 3A.
9. The shade structures shall be designed and constructed to provide a minimum head
clearance (headroom) at any point of 2.3m.
10. The proposed structural column type C4 as shown on Drawing No. 05.06.38-005A prepared
by Light Weight Structures dated June 2006 shall be designed and constructed to be clear
of the design envelope around a parked vehicle as indicated in Figure 5.2 of AS/NZS
2890.1:2004.
11. The proposed shade structures and supporting columns shall not impede the existing
surface stormwater runoff of the site or interfere with the existing stormwater drainage
system of the site.
12. The lighting within the car parking area shall be maintained in accordance with AS/NZS 115
Erosion and Sediment Control
13. Any person acting on this permit shall prevent erosion and sediment export from leaving
the site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
General
14. Any damage caused to any public utility during the course of construction shall be repaired
to Council’s standards and at no cost to Council.
15. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
16. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to
or from the site shall be covered to prevent materials including dust being windblown from
the vehicle.
FURTHER PERMITS REQUIRED
17. Prior to the commencement of development, the following Development Permits must be
obtained:-
17.1. Development Permit for Building Works.
ADVICE FOR INFORMATION PURPOSES ONLY AND ARE NOT CONDITIONS OF
APPROVAL.
1. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:-
1.1. On a Sunday or public holiday, at any time; or
1.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
2. This approval is for Stage 1 only and includes the shade structures over the car parking
Page 7 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachement D - Minor Change Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 539 KB (small file)
- File type
No other editions are linked here.