Original source · versioned page text
Town Planning Assessment Report
Attached to the e-mail Lodgement of development application - 184 Calanthe Avenue_ Doonan.
1. forms part of a dwelling area of 65m²; dwelling.
house and is not 2. has no more than 2
subdivided from the bedrooms;
balance of the dwelling 3. does not occur on any
house; property covered by a Building Unit
2. contributes to housing Plan; and
choice for members of 4. does not occur on a
the one household; property that already contains a
3. protects the low density dual occupancy or secondary
residential, rural dwelling.
residential or rural
character of the zone;
4. does not occur on a
property covered by a
Building Unit Plan or any
property already
containing more than one
dwelling;
5. is accompanied by
sufficient car parking.
PO5 Development is provided with: AO5.1 If located within the urban Not applicable.
boundary, the dwelling is
1. a level of infrastructure
connected to reticulated water
and services that is
supply, sewerage, stormwater
appropriate to its setting
drainage and telecommunications
and sufficient for the
infrastructure networks (where
intended use;
available to the lot).
2. an effluent treatment and
disposal system that does Editor’s Note—the urban boundary
not have an adverse is indicated on the zone maps
effect on ecologically contained within Schedule 2.
important areas or water
quality; and AO5.2 Where there is no Water tanks proposed and
3. adequate onsite water reticulated water supply, the nominated on the Site Plan.
storage to support the premises is serviced with a Capacity requirements to be
efficient use of water and rainwater tank with the following conditioned as required.
is adequate for everyday minimum water supply capacity:
use of the occupants. 1. for dwellings with no more
than 3 bedrooms – 45,000
litres; or
2. for dwellings of more than
3 bedrooms or where
including a secondary
dwelling on the same
premises – 60,000 litres.
AO5.3 If located on a lot where A Site and Soil Evaluation (On
reticulated sewerage is not Site Effluent) Report has been
available to the lot, the dwelling is prepared by Australian Soil
connected to an on-site effluent Investigations. A 320m2 land
16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.