Skip to the record
Every meeting, every word.

Council archive · source document

Request for Further Information - 010.2008.00000299.001 [As Published] · 132008.299

of 4

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                  -3-


      13.5. The use of dormitories, bathroom and kitchens; &
      13.6. Any other anticipated noise sources.
      and demonstrate how the development will not cause –
           Excessive noise under Council’s Local Law No. 12 – Control of Nuisances.
            Unlawful environmental nuisance under the Environmental Protection Regulation
             1998.
14.   Submit details on laundry facilities eg: number of washing machines, dryers and
      outdoor cloths drying areas for an 80 bed hostel (It is noted that there is no laundry
      shown at the house refurbishment site of the development).
15.   Communal kitchens shall be constructed to a commercial standard and with
      mechanical exhaust ventilation over the cooking equipment. Details of intended fit-
      out shall be supplied showing adequate refrigeration, storage etc for 72 guests.
16.   Commercial kitchens are to have the liquid waste connected to a Trade Waste line,
      that discharges to an approved grease arrestor in accordance with Council’s Trade
      Waste Policy. Details of the location of the grease arrestor, is required for servicing
      purposes.
17.   The developer must provide waste storage and disposal facilities, including an
      external imperviously paved area correctly sized for all refuse and recycling
      containers and suitably screened from public places and neighbouring properties.
      Detailed plans are required on the number of bins (refuse & recycling) and storage
      and collection locations for the site, and bin wash facility.
Provide details on a storage area for cleaning materials and equipment.
Under the provisions of the Integrated Planning Act 1997, you have three options available in
response to this Information Request. You may give the assessment manager (in this instance
Council) and each referral agency (if any):
1.    all of the information requested; or
2.    part of the information requested together with a letter asking the assessment manager and
      each referral agency to proceed with the assessment of the application; or
3.    a letter:
      (i)      stating that you do not intend to supply any of the information requested; and

      (ii)     asking the assessment manager and each referral agency to proceed with the
               assessment of the application.

Please be aware that under Section 3.2.12 of the Integrated Planning Act 1997, the applicant is to
respond to any information request within 12 months of the request or otherwise, the application
lapses.
A response to the above is required to be submitted, prior to further assessment of the application. If
any further matters arise as part of assessment of this application, you will be advised accordingly.

Should you have any further queries in relation to the above, please do not hesitate to contact me on
the above number.

Yours faithfully,

Used in these records

About this file

File size
19 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Request for Further Information - 010.2008.00000299.001 [As Published].pdf · 19 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.