Attachment F - Response to Acid Sulfate Soils Overlay Code · MCU24/0112
8.2.1 ACID SULFATE SOILS OVERLAY CODE
Updated 04 March 2021
Noosa Plan, Version 1
Table 8.2.1.3 – Criteria for assessable development
Performance Outcomes Acceptable Outcomes Response
Avoidance and management of ASS
PO1 AO1.1 PO1 Complies
Development: The disturbance of ASS is The development will ensure
avoided by: that excavation and
(a) does not disturb ASS; or construction minimises
(b) is managed to avoid or (a) undertaking disturbance to ASS and where
minimise the release of an ASS investigation and unavoidable will take
acid and metal soil analysis according to precautions to avoid or
contaminants, where the National Acid Sulfate minimise the release of acid
disturbance of ASS is Soils Guidance; and metal contaminants.
unavoidable. (b) not excavating or otherwise
removing soil or sediment Where the development
containing ASS; involves interference with the
(c) not permanently or Acid Sulfate Soils, a
temporarily extracting preliminary management plan
groundwater that results in that demonstrates undertaking
the aeration of previously the necessary ASS
saturated ASS; and investigations and neutralising
(d) not undertaking filling on and preventative methods are
land at or below 5 metres appropriately undertaken.
AHD that results in:-
Council may wish to include a
(i) actual ASS being
relevant and reasonable
moved below the water
condition of approval requiring
table; or
the preparation of an Acid
(ii) previously
Sulfate Soils Investigation
saturated ASS being
Report and an Acid Sulfate
aerated.
Soils Management Plan.
Editor's note—National Sampling and
Identification Methods Guidelines is a
reference to:
(a) National Acid Sulfate
Soils Guidance: National acid
sulfate soils sampling and
identification methods manual,
Department of Agriculture and
1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
Performance Outcomes Acceptable Outcomes Response
Water Resources, Canberra
(Sullivan et al, 2018); and
(b) National Acid Sulfate
Soils Guidance: National Acid
Sulfate Soils Identification and
Laboratory Methods Manual,
Department of Agriculture and
Water Resources, Canberra; and
(c) the Australian Standard 4969
OR
AO1.1
The disturbance of ASS avoids
the release of acid and metal
contaminants by:-
(a) undertaking
an ASS investigation
conforming to
the National Acid Sulfate
Soils Guidance;
(b) neutralising existing acidity
and preventing the
generation of acid and metal
contaminants using
strategies documented in
the Soil Management
Guidelines; and
(c) preventing the release of
surface or groundwater
flows containing acid and
metal contaminants into the
environment.
AND
Editor's note—Soil Management
Guidelines is a reference to the 'Soil
Management Guidelines.
Queensland Acid Sulfate Soils Technical
Manual'. Dear SE, Moore NG, Dobos
SK, Watling KM and Ahern
CR. Department of Natural Resources
and Mines (2002).
2
Page 3
Performance Outcomes Acceptable Outcomes Response
AO1.3
Where potential or
actual ASS is identified, they
are managed in accordance
with an ASS management
plan.
3
Used in these records
Attachment F - Response to Acid Sulfate Soils Overlay Code.pdfRelated documentApplication case desk ↗
About this file
- File size
- 128 KB (small file)
- File type
No other editions are linked here.