                                UNIT DEVELOPMENT
    24 KATHARINA STREET AND 10 NATASHA AVENUE
                                      NOOSA HEADS

TECHNICAL NOTE ON STORMWATER MANAGEMENT

Introduction

Tod Consulting have been engaged by Mark Bain Constructions Pty Ltd to prepare preliminary
civil engineering plans for a proposed 8 unit development at the above site. The scope includes
design of the driveway and turning areas, bulk earthworks and preliminary stormwater drainage
design. This technical note focuses on the stormwater drainage design and management.


Stormwater Quantity

The total site area is 2039m2 and currently contains two separate residential unit complexes. The
proposed redevelopment of the site increases the impervious area slightly, in the order of 250m2.
As such it is proposed to include a detention tank under the lower driveway area to mitigate any
increase in peak flows. A detailed assessment and sizing of the detention tank will be conducted
during the detailed design phase, however for the purpose of the preliminary design and MCU
development application we have adopted a tank size based on a Sunshine Coast Council
deemed to comply solution for medium density development – refer SCC fact sheet attached. As
outline in table 2 of this document the detention volume is based on 90m3 per Ha. In this case
based on the total site area of 2039m2 the detention tank would be 18,000 litres. We believe this
is a very conservative approach and the final tank size is likely to be smaller but have
demonstrated that an 18,000 litre tank can fit under the driveway servicing the Katharina Street
units.

Runoff from the unit complex will be discharged to Council’s drainage infrastructure via a new
manhole over the existing drainage pipe in Katharina Street as shown on the preliminary
drawings.


Stormwater Quality

The State Planning Policy 2017 specifically excludes the need for any water quality treatment for
developments under 2500m2, however it is noted the new 2020 Noosa Plan overrides the SPP
and requires water quality treatment to be addressed for developments of all sizes. With
developments under 2500m2 it is often difficult to provide sufficient space for stormwater
treatment devices and this is certainly the case with this development. Notwithstanding, we have
identified a section of the site landscaping that can be constructed as a bio filter area that will treat
run off from 75% of the site (upper catchment area). The upper catchment area is 1500m2 and
based on Healthy Waterways deemed to comply solutions for Stormwater Quality Treatment for
the North Coast region, the filter area would need to be at least 1.7% of the catchment area, or
26m2. Refer deemed to comply solution R5 for appendix D2 of the above document – extract
attached below. We have determined and a filter area in excess of the above area can be
constructed in the garden bed at the rear of the upper catchment, driveway area.


                                              Page 1 of 2
Log in to download the original file

RFI - Engineering - Stormwater.pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 5 pages

Page 2

In addition to this treatment area, we propose to include rainwater re-use on the site by combining
a storage component to the detention tank in the lower catchment of the site. This stored water
can be used to irrigate the landscaped areas of the site. We have nominated a volume of 18,000
litres (in addition to the detention volume) for rainwater storage/re-use.

Whilst the above actions will not strictly meet the performance outcomes listed in PO6 of the
Water Quality and Drainage Code, we believe they are more than adequate for a development of
this size.



Prepared by



Doug Reynolds RPEQ 9072
TOD Consulting

01/04/2022




                                           Page 2 of 2

Page 3

On-site Underground Detention Storage Orifice Plate Sizing
for Deemed-to-comply Detention
October 2020
This fact sheet describes the steps that
should be taken to size an orifice plate for
on-site underground detention when
using deemed to comply detention
storage. The standardised orifice plate
design will help to ensure post-
development flows match pre-
development conditions for a range of            The outlet pipe to which the orifice plate is
storm events.                                    installed should be sized to convey the 10%
                                                 AEP (at 2100) peak flows. This is to allow for
An orifice plate is required to ensure that      potential future upgrade of the receiving
peak flows being discharged from an              drainage network. Allowance for blockage of
underground storage tank can be attenuated       the underground stormwater network and
for a range of storm events. Without an          surcharge of the underground storage
orifice plate, outflows would be controlled by   should be considered in the siting and
the capacity of the outlet pipe. As the outlet   design of the underground detention storage.
pipe will typically be sized to convey the 10%   The overland flow path is required to have
Annual Exceedance Probability (AEP) event        sufficient capacity so that surrounding floor
(at 2100) peak flows, the post-development       levels will not be inundated if there is
discharges will likely exceed pre-               complete blockage of the underground
development peak flows for smaller AEPs if       stormwater drainage network during the 1 in
an orifice plate or another form of staged       100 AEP (at 2100) event.
discharge control is not installed.
                                                 The stormwater drainage upstream of the
Existing drainage networks, particularly in      detention storage should be designed so that
older established urban areas, were              the 1 in 100 AEP peak flow can be conveyed
generally sized to convey the 39% AEP peak       to the underground detention storage.
flows. Therefore discharging at higher than
pre-development rates during smaller storm       To the maximum degree practical, the entire
events could cause local flooding issues for     site should be drained to the detention
surrounding areas. Control of peak flows         storage. Where this is not possible, the
during smaller events is also necessary in       equivalent storage for the entire site should
order to reduce the risk of increased scour      be provided and the outlet should be
and erosion in receiving waterways.              reduced in size to achieve the same overall
                                                 site discharge. A maximum of 20% of the
Having an outlet pipe sized to convey the        developed portion of the site is allowed to
smaller 39% AEP peak flow, without an            bypass the detention storage.
orifice plate, so that outflows would be
restricted for all storm events, would require   The depth of the required underground
more detention storage volume than               detention storage is flexible in order to allow
proposed by Table 2 of the Flooding and          for a range of proprietary detention storage
Stormwater Management Guidelines (SCC,           products to be utilised. Pre-treatment of
2018).                                           flows entering the tank should be provided
                                                 by a Gross Pollutant Trap (GPT) or gully pit
                                                 baskets.




                                                  Fact Sheet On-Site Detention Orifice Plate Sizing

Page 4

A removable debris screen, in accordance                         The orifice plate holes should be
with the Section BN5.5.2(p) of QUDM (2017)                       spaced so that the:
should be provided upstream of the orifice                        i.    bottom third of the plate can
plate. A sump pit, which houses the outlet                              convey 5/12 of Q0 when H is
orifice, will also be necessary. The access                             2/3 of the tank depth
chamber to the underground storage should
be adequately sized to enable the debris                          ii.   middle third of the plate can
screen to be removed from the tank.                                     convey 1/2 of Q0 when H is
                                                                        2/3 of the tank depth
The orifice plate should be made from a
corrosion resistant 5mm thick stainless steel.                   iii.   the top third of the plate can
The orifice plate will have numerous holes at                           convey 1/12 of Q0 when H is
specified levels and diameters cut out of it.                           2/3 of the tank depth
The minimum acceptable orifice plate hole             Step 4. Multiple holes will be required in
diameter is 25mm.                                             each section of the orifice plate. The
                                                              minimum acceptable orifice plate
Orifice Plate Sizing Process                                  hole diameter is 25mm. Check that
The orifice plate should be designed using                    the proposed number of holes can
the following steps:                                          fit within the available orifice plate
                                                              area over the outlet pipe. In order to
Step 1. Size the outlet pipe to which the                     accommodate the required number
        orifice plate will attach so that it has              of holes, multiple outlet pipes or a
        a diameter half the depth of the                      box culvert may be required. The
        underground tank. Multiple pipes                      procedure to size the orifice plate
        can be used to achieve the required                   holes will not be modified, the holes
        total depth, in order to allow smaller                will just be spread over a greater
        outlet pipes to be used.                              area.
Step 2. Determine the current climate pre-            Step 5. Check that the outlet pipe/s has
        development 10% AEP peak flow                         sufficient capacity (based on
        based on A Review of Simple Peak                      Colebrook-White equation) to
        Flow Estimation Methods for use on                    convey the 10% AEP (at 2100)
        the Sunshine Coast following the                      peak pre-development flows.
        release of ARR 2016 (SCC, 2017).
        This will be the target Qo.                   Step 6. Size the removable debris screen
                                                              so that the area (including blocked
Step 3. Size the required orifice plate holes                 area) is at least 20 times the total
        based on the following equation:                      orifice area. A grid mesh should be
         Qo = C A (2gH)1/2                                    used (e.g. Weldlok A40/203 or
         Where:                                               similar).

         C = 0.6 (unless otherwise justified)         An example of the orifice plate is attached.

         A = total orifice area (m2)                  The proposed outlet design should help to
                                                      ensure that post-development peak flows
         g = acceleration due to gravity              from the site are attenuated to pre-
         (m2/s)                                       development levels for all storm events, up
         H = depth of water above the                 to and including the 1 in 100 AEP (at 2100).
         centroid of orifice plate hole (m)           The depth of water (H) used to size the
                                                      orifice plate is limited to two thirds of the
                                                      depth of the tank. During major storms,


                                                   2 of 3   Fact Sheet On-Site Detention Orifice Plate Sizing

Page 5

additional storage above this level will be                             0.075 m3/s. 7/85mm orifice
therefore be available.                                                 plate holes (or equivalent) are
In some instances, multiple small outlets                               therefore required in the
may be able to be used instead of an orifice                            middle third of the orifice
plate. The capacity of the outlet pipes (which                          plate.
is dependent on factors such as grade and                       iii.    In the top third of the plate,
materials) should be verified to ensure that                            the average depth of water
they do not become the hydraulic control.                               above the centroid is 0.3m,
The multiple pipes should drain to a single                             and it will be required to
pit before connecting to Council’s                                      convey 1/12 of 0.15m3/s, i.e.
underground drainage network.                                           0.0125 m3/s. 1/105mm orifice
                                                                        plate hole (or equivalent) is
Orifice Plate Sizing Example                                            therefore required in the top
An example of the orifice plate sizing is                               third of the orifice plate.
provided below for an example of a 0.5ha             Step 4. The orifice plate holes are able to
rural-residential block being developed into a               physically fit onto the 600mm
medium density development. The volume of                    diameter orifice plate, as shown in
storage required is 210m3. The pre-                          Figure 1, and so multiple outlet
development 10% AEP peak flow is                             pipes will not be required.
0.15m3/s (current day) and 0.18m3/s (at
2100). The depth of the proposed tank is
1.2m.
Step 1. The outlet pipe will be required to
        have a diameter of half of 1.2m, i.e.
        600mm.
Step 2. The target Qo is 0.15m3/s.
Step 3. The following orifice plate holes will
        be required:
          i.   The centroid of the bottom
               third is at 0.1m. The average                           Figure 1 Orifice Plate
               depth of water above the                                  Set Out Example
               centre of the holes at 2/3 of         Step 5. The 600mm RCP outlet at a
               the tank depth is therefore                   minimum grade of 0.2% will have a
               0.7m. The orifice plate holes                 capacity of 0.27m3/s, and so will
               are required to convey 5/12 of                have sufficient capacity to convey
               0.15m3/s, i.e. 0.0625 m3/s.                   the future climate 10% AEP peak
               4/95mm holes (or equivalent)                  flow of 0.18m3/s.
               are therefore required in the
                                                     Step 6. The minimum debris screen area is
               bottom third of the orifice
                                                             20 times the total orifice plate hole
               plate.
                                                             area, i.e 1.53m2.
         ii.   In the middle third of the
               plate, the average depth of
               water above the centroid is
               0.5m, and it will be required to
               convey 1/2 of 0.15m3/s, i.e.



                                                  3 of 3   Fact Sheet On-Site Detention Orifice Plate Sizing

Page 6

EXTRACT FROM HEALTHY WATERWAYS DEEMED
TO COMPLY SOUTIONS FOR WATER QUALITY


[OCR of page images]
EXTRACT FROM HEALTHY WATERWAYS DEEMED
TO COMPLY SOUTIONS FOR WATER QUALITY

Deemed to Comply Solution R5

- utilising rainwater tank(s) and
bioretention system(s)

Deemed to Comply Solution R5 only applies to
residential development greater than 2 dwellings
(townhouse style up to 2 storeys) but <12,500m?
in site area.

REGION

South East Queensland
- Greater Brisbane

- North Coast

- West Region

- South Coast

NOTES

Region - Refer to STEP 1 of Selection and Design
Process of main document for schematic of
climatic regions

Rainwater Tank requirements defined by Queensland
Development Code MP 4.2 and 4.3. Refer to code to
confirm tank sizes.

Bioretention system filter media area refers to the
functional flat portion of the bioretention system only
and does not allow for coarse sediment capture and
batters/bunds to surrounding ground levels. The total
bioretention footprint area must be defined as part
of Selection and Design Process (STEP 7) to account
for batters and coarse sediment as well as filter media
area. Typically for small bioretention systems (<50m7?),
the Total Footprint Area = 3 X Filter Media Area. This
should be used as a starting point for the design process
and refined provided the proponent develops suitable
detailed concept drawings as part of the Development
Approval.

RAINWATER TANKS

Attached dwellings 3kL

BIORETENTION SYSTEM FILTER
MEDIA AREA (% of catchment area)

Detached dwellings SkL

1.1%
1.7%
0.9%

1.3%

Location on Public or Private Land - The bioretention
systems should remain on private land and be managed
by the owners (body corporate). There exists an option
to create a small parkland or drainage reserve for the
bioretention system which could be handed to the local
authority but this would require approval.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.