Annex 7 - Engineering Specifications
Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).
2.5. Deployment of navigation buoy(s) at each site and signage in accordance with permit
conditions.
2.6. Works to be undertaken in accordance with the Project Restoration Plan.
2.7. Monitoring and Maintenance, as required (refer Note 4.)
2.8. Works may need to be adapted in response to climate change, depending on monitoring of
habitat health.
3. NOOSA RIVER FISH HABITAT AREA, MATTERS OF STATE ENVIRONMENTAL SIGNIFICANCE &
MARINE PLANTS
3.1. The objective of the works is to restore oyster-dominated ecosystems to the Noosa River
estuary including within the Noosa River Fish Habitat Area.
3.2. Two of the Phase I Restoration Sites, Tewantin and Goat Island, are within the Noosa River
Fish Habitat (A) Area. The Noosa Sound East and Noosa Sound West restoration sites occur
outside of the Noosa Fish Habitat Area. The Phase II Restoration Sites have not been selected
but will be within the Noosa River Fish Habitat Area (except for any further works in Noosa
Sound restoration sites).
3.3. Works to occur within the identified Restoration Zones, within 30m from shore, in water
depths less than 2m below MLWS. The exception to this is the Tewantin site where works are
proposed on existing rocky substrate, or in the future where otherwise approved in writing by
MSQ.
3.5. Phase 1 works results in temporary impacts to sparse marine plants at Tewantin site only.
3.6. Works are NOT to impact on existing terrestrial vegetation (including vegetation within
mapped MSES).
3.7. During construction, plume is to be minimised and monitored visually to ensure no impacts to
adjacent marine plants. Turbidity monitoring to be undertaken in the event that it extends
within 5m of mapped seagrass beds (Refer Project Restoration Plan Section 6.4).
4. MONITORING & MAINTENANCE
4.1. Restoration substrates to be monitored periodically and after major storm events in
accordance with the Project Restoration Plan.
4.2. Maintenance to be undertaken as required. This may include:
· Reprofiling and/or placement of additional rock on oyster reef patches to reinstate design
levels and profiles after expected settlement has occurred. Ideally this would occur 12
months after deployment but may be subject to timing of other works. Where limited
natural settlement of oysters is experienced (nominally <200mm) and the crest remains