Attachment 4 - Option 1 Hydraulic Advice · RAL20/0005
Mitti St, Noosa Heads SLR Ref: SLR Memo 23 09 19.docx
Hydraulic Investigation Date: 23 September 2019
Channel Widening Option
Figure 3 Peak Flood Hazard – 1% AEP Flood Event
The results of the analysis, as shown in the Figures above, are as follows:
• The peak flood depths beyond the channel are less than 500 mm.
• The impacts of the proposed works are less than 20 mm external to the subject site.
• The peak flood hazard beyond the channel; is less than 0.4 m²/s.
Page 4