Attachment 4 - Option 1 Hydraulic Advice · RAL20/0005
8. The fencing on the walkway shall be consistent with the fencing design identified on Figure
2.
Fencing
9. Additional fencing is to be installed as identified on Plan of Development Option 1 in
accordance with Figure 2 and Figure 3.
10. Where pool fencing with a flap is to be installed, Figure 3, the flap must be able to come to
rest on a level concrete apron.
Signage
11. The following sign must be placed at the four locations identified on the Plan of
Development Option 1:
Stormwater drainage
12. A stormwater open drain is to be constructed across the site in accordance with Plan of
Development Option 1 dated 11/12/2019 and with the dimensions identified in the TUFLOW
hydraulic modelling referred to in the SLR Technical Memorandum dated 23/9/2019.
Fill
13. The area outside of the 3 m wide open drain identified on drawing Plan of Development
Option 1 dated 11/12/2019 must be filled to a minimum level of 13.70m AHD, excluding the
area of the existing drain along the southern boundary.
Stormwater covenant
14. The owner must enter into the Stormwater covenant.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4 - Option 1 Hydraulic Advice.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.