Skip to the record
The gold standard in government transparency.

Council archive · source document

09/1176 - MCU - Detached House [As Published] · 132009.1176

of 20

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

«

INTEGRATED PLANNING ACT 1997 Part D, Version 3.2

 

Mandatory: ‘information.

 

» ee Fo +

6, Confirm that the folowing mandatory information accompanies this application:

 

Confirmation of

 

: Method of lodgement: :

 

 

Kaper

    

For all applications +. 7 a
(i) Plans showing the nature and Tocalion of the proposed | use on vine premises and a statement about the

intensity and scale of the proposed use (e.g. number of employees, days and hours of operation, number of visitors, be Confirmed mail
number of seats, capacity of storage area)

 

 

When thie application, involves reuse: of existing buildings <

 

(ii) Plans showing the size and location of the buildings to be Teused Confirmed

 

Not applicable

 

  
  
 
  
   
 

 
  

ay

Confirmed

 

 

Not applicable

 

 

 

 

Not applicable

 

 

Confirmed

a nal
Ww) Plans showing the nature and location of the proposed new operational works

 

Not applicable

 

 

 

 

L
X
xX
O
Mo Confirmed
XM
CL)
4)

 

 

OFFICE USE ONLY

 

 

Date received Reference numbers

 

 

 

 

Advice for completing Part D

General advice

 

. Part A must also be completed for all IDAS development applications.

. The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to
another question. :

. When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) for coastal development applications, use the

process from the information sheet Electronically paying fees to the Environmental Protection Agency (EPA) and securely attach the form
Electronic Funds Transfer (EFT) payment notification to this application.

Q3 A development permit authorises development to occur. A preliminary approval is a step in the approval process and does not authorise
development to occur - a subsequent application for a development permit must be sought.

 

 

Table D If the MCU application involves operational work that is the building of a retaining wall on the premises, the application is taken also to be for the
operational work if approval for the operational work has not been applied for in this application or in a separate application.

 

 

 

' This form is also used for material change of use assessable against the land use plan for Caims airport land or Mackay airport land. Wherever planning scheme is
mentioned, take it to mean the land use plan for the airport tand.

 

 

Used in these records

About this file

File size
1.8 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1176 - MCU - Detached House [As Published].pdf · 1.8 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.