Skip to the record
Accept no substitutions.

Council archive · source document

Appendix D - Noosa Plan Code Assessment · MCU25/0053.01

of 65

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Performance Outcomes                   Acceptable Outcomes                 Response

                                       AO25.2                              Not Applicable

                                       On sloping sites, split             The development is not located
                                       level buildings with small          on land with a slope greater than
                                       floorplates, that step down         25%.
                                       the slope are used as an
                                       alternative to standard single or
                                       double storey construction to
                                       minimise building bulk and
                                       benching of the sites.



                                       Editor's note- refer to Figure
                                       6.9.1A and Figure 6.9.1B



                                       AO25.3                              Not Applicable

                                       On sloping sites, the distance      The development is not located
                                       between the ground level and the    on land with a slope greater than
                                       lowest part of the floor of         25%.
                                       the building does not exceed 3
                                       metres.



Earthworks and drainage

PO26                                   AO26                                Can Comply with AO26

Filling and excavation                 Filling and excavation              The development involves
for operational works do not           for operational works is designed   excavation works to facilitate the
directly, indirectly or cumulatively   and constructed to ensure           basement level. The development
cause adverse impacts external         overland flow and/or flooding is    be designed via a condition to
to the development site by:            not worsened, impeded, or           ensure that the construction of the
                                       otherwise diverted to adversely     basement will not result in
    a.   causing ponding of water
                                       affect other properties or          overland and/or flooding is
         on the site or nearby
                                       downstream environments.            worsened or diverted to other
         land;
                                                                           properties.
    b.   increasing flooding,
         which adversely affects
         the safety or use of any
         land upstream or
         downstream; or

    c.   adversely affecting the
         flow of water in any
         overland flow path.

                                                                                                                 22

Used in these records

About this file

File size
574 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix D - Noosa Plan Code Assessment.pdf · 574 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.