Permissible Change Decision Notice Approval or App in Part - 010.1998.00981605.002 [As Published] · 131998.981605.2

of 9

Text shows just the words. Original shows the document exactly as it was published.

                                                                                    1998/981605




      Where an arrestor is more than 15 metres from the location of the pump out truck, a 80 mm
      pump out line is to be installed, all to the standard Council detail. The location of the ends of
      the pump out line are to be determined by Council’s Trade Waste officer during a site
      inspection.
12   A Trade Waste Permit is required to discharge Trade Waste. Two sets of hydraulic drawings
     showing ALL Trade Waste requirements in accordance with the Noosa Trade Waste Policy,
     are to be submitted with the application to Council for approval. Approval is to be obtained as
     part of the building approval process.
13   The Trade Waste application fee of $125 is required at the time of the application.
14   An enclosed area is to be provided for the storage of solid waste, cardboard, garbage bins,
     waste oil storage, bin wash area etc. The grease arrestor is not to be located in the enclosed
     area.
15   The bin washing area is to be connected to the trade waste plumbing line. The area is to be
     roofed unless the 600 x 600 standard raised detail is permitted. Rain water is to be excluded
     from the bin wash area.
Engineering
16   The developer must provide at least 11 off-street car parking spaces, comprising 2 covered
     spaces and 9 uncovered spaces, and access thereto which are to be provided with a sealed
     pavement.
17   The developer shall pay a contribution to Council in lieu of 3 off-street car parking spaces in
     accordance with Council's Policy on Cash Contributions in Lieu of Off Street Carparking, prior
     to issue of a Development Permit for building works. Such payment shall be in accordance
     with the contribution rate adopted by Council and current at the time of payment. An estimate
     only of the contribution at the date of this decision is $18,000.
18   The developer is required to widen the footpath across the frontage of the site to fit with
     Council’s forward plans to ‘One Way’ Edward Street. Such works shall involve the construction
     of kerb and channel, bitumen widening, associated drainage, hot mix correction to the existing
     pavement, where required and footpath upgrading works. Also, the existing grated stormwater
     pit in Gympie Terrace at the frontage of the site, shall be upgraded to a kerb entry pit type in
     conjunction with the works outlined. In this regard, plans prepared by a registered Civil
     Engineer are to be submitted to and approved by the Shire Engineer, prior to the issue of the
     Development Permit for building works.
19   The developer shall bear the cost of alteration of any public utility or other facilities
     necessitated by the development of the land or associated construction works external to the
     site.
20   The developer shall connect to Council's existing water supply and sewerage reticulation
     systems at the developer's expense to the standards and requirements of Council's Shire
     Engineer.
21   The developer shall provide metered water connections from the water supply system to the
     proposed development, in accordance with Council's standards and to the satisfaction of the
     Shire Engineer.
22   The site shall be filled in accordance with the requirement of the Noosaville Master drainage
     Plans and the Shire Engineer. Special treatment shall be required for filling around the two
     existing Mango Trees at the rear of the site. Floor levels for the development are defined
     within the Planning Scheme. Fill levels will be provided on application to Council's Engineering
     Department. Filling works shall be carried out in accordance with Section 3.8 of Council's
     "Engineering Design Standards" manual and so as not to cause the ponding of water on any
     adjoining lands or the blockage of, or interference with, any natural watercourses. No
     earthworks or filling works are to be undertaken until issue of a Development Permit for
     operational works (filling).


                                                                                      Page 3 of 9

Used in these records

About this file

File size
60 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Permissible Change Decision Notice Approval or App in Part - 010.1998.00981605.002 [As Published].pdf · 60 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.