Council archive · source document
Permissible Change Decision Notice Approval or App in Part - 010.1998.00981605.002 [As Published] · 131998.981605.2
1998/981605
29 Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations or the conduct of the approved use. The landscape
plans referred to above are to denote areas of existing vegetation or existing trees proposed to
be retained.
30 Any advertising sign or device is to comply with the provisions of Council's policies on
advertising.
31 The developer shall pay a contribution to Council in accordance with Council’s Policy on
Development in the Noosa River Flood Plain, prior to the issue of a Development Permit for
building works. Such payment shall be in accordance with the contribution rate adopted by
Council and current at the time of payment. An estimate only of the contribution at the date of
this decision is $220.00.
32 The developer must submit security in the form of a cash bond or trading bank guarantee to
the sum of $5,000 to secure performance of all conditions of this approval, prior to the issue of
a Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval.
33 The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
34 This Development Permit for a material change of use of premises lapses if:-
34.1 the use or erection of a building or other structure associated with the use, has not been
commenced within four (4) years of the date of issue of the Development Permit, unless
application is made and approved by Council for an extension; or
34.2 the use of any premises pursuant to the Development Permit ceases.
35 Prior to the commencement of development, the developer must obtain the following
Development Permits:-
35.1 Development Permit for building works;
35.2 Development Permit for plumbing and drainage works;
35.3 Development Permit for operational works of landscaping, carparking and access;
36 The outdoor dining proposed for the site is not to be enclosed by means of additional plastic
awnings or other such structures.
Additional Conditions – 11 October 2010
Planning Assessment
37. Security in the form of a cash bond or trading bank guarantee to the sum of $1,500 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
38. Architectural features such as glass bricks, windows and fixed glass panels to match the
existing development shall be incorporated into the lift wall and balcony enclosure pursuant to
the approved plans of development.
39. To help screen the lift, 2 Elaeocarpus eumundii’s with a pot size of 45 litres shall be planted in
the garden immediately to the south of the lift. A small portion of the existing landscaping may
have to be removed to accommodate the 2 feature trees.
Unity Water
40. Construction works undertaken in the vicinity of Unitywater water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
with repair, replacement or alteration of infrastructure must be met by the applicant.
Page 5 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Permissible Change Decision Notice Approval or App in Part - 010.1998.00981605.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 60 KB (small file)
- File type
No other editions are linked here.