Log in to see the plans as drawn A B C D E F G H I
10,300 7,550 9,940 7,820 1,690 7,190 3,500
line of terrace over line of terrace over line of terrace over
1 1 1 1 EXT. FINISHES LEGEND
2 2
3 3
4 louvre sliding door louvre sliding door 4 AFD aluminium framed door.
5 5
6 6 AFW aluminium framed window.
B
PLANTING
STAIR
STAIR
wc
7 7
B
built-in
R
8 fridge 8 AL aluminium louvres, refer sched.
STEAM
R
b.
E
9 9
EZE
WC aluminium screen.
E
AS
10 10
EZE
11 11
12 12
ASD aluminium sliding door.
pool fence
13 13
6,810
6,810
14 c'bd GYM 14
BAL balustrade
15 15
CINEMA GAMES BAR BLK masonry blockwork.
tv
FT
TF
POOL PLANTER
C C carpet
gate
s
conc reinf. concrete wall/pool shell
CHANGE
CS concrete slab.
FCA fibre cement awning.
fall SAUNA
FC fibre cement cladding
fall PLANTING fascia gutter.
2 2
FG
FT1 floor tile - (no refers to type).
fire fireplace
SPA
GRASS flue flue kit
4,000 TERRACE
4,000
PLANTER HH 'Heka' hood, ref sched.
line of roof over line of roof over
FIRE FT OVER GRASS join joinery item, by joiner
1
PIT TERRACE 2 MR1 metal roof - (no refers to type).
OVER 3
PB plasterboard lining, ref. sched.
line of roof over
PF compliant pool fencing
3 3 PW parapet wall.
operable screens
sliding door timber louvre FT
REN polymer render
2,190
2,190
fall
SBJ silicone butt jointed glass.
bath
UP to SP structural post, refer engineer.
FT POOL window window
4 BED 5 b 4 STR1 stair (no. refers type)
timber louvre
1
TERRACE 2 TIM timber cladding, ref. schedule
BED 5 EN SUITE
line of roof over
3
line of roof over
TD timber deck.
STAIR
4
C FT daybed
window
fw 5
6 TF timber floor.
7
8 TS timber screen, ref. detail
PLANTING wc
STAIR
9 1
10
VER vergola.
5,525
5,525
2
3 VJ1 vertical joint lining, ref sched.
(no. ref. type).
sh. TERRACE
robe ROBE OVER
fall MASTER
BED
artwork
SPA robe
DRESSING C
(over) STAIR PLANTING robe C
LOWER
window
robe 13 12 11 10 9 8 7 6 5 4 3 2 1
5 LINK 5
UP to
operable screens
COVERED covered
LOUNGE lounge
OVER 1
POOL POOL POOL
slider
2
3
4,850
4,850
(over) BRIDGE (over)
STAIR
4
C (over) 5 C
WD.601 6 WD.601
7 b
8
mirror
sliding door
9
step 10 ENS
seat b
FT
services bath
6 10 9 8 7 6 5 4 3 2 1
line of building over 6
joinery
b sh
POOL wc
w
STAIR
DECK gate
2,265
2,265
CHANGE/ FT PLANTING DRESSING
UP to family 1 2 3 4 5 6 7 pool fence WET RM sh
C
operable screens
deck STAIR
robe
7 sh
7
louvre
SH
line of building over
1
line of roof over
2
line of building over
FT
SPARE 3
sliding door
DECK robe
4 wc WC
robe
STAIR
5
OVER 6 DINING
4,330
4,330
7 OVER
8
F UP F
9 STAIR
WD.602 10 to kitchen See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.