Skip to the record
Accept no substitutions.

Council archive · source document

Decision Notice plus copy sent to Referral Agencies [As Published] · 132007.2398

of 32

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                             2007/2398




      Existing Development                         Approved Development
      Existing Use Class /                         Approved        Use
                              Existing Quantity                            Approved Quantity
      Use                                          Class / Use
                                                                           Stage 1 = 120 single beds +
                                                                           21x 2 bed units
                                                                           Stage 2 = 21x 2 bed units
                                                                           Stage 3 = 29 x 2 bed units
                              1 Lot & house        Multiple Housing -      Stage 4 = 13 x 2 bed units
      Detached House          +                    Type 3 - Retirement &
                                                                           Stage 5 = 21 x 2 bed units
                              1 Vacant Lot         Special Needs
                                                                           Stage 6 = 24 x 2 bed units
                                                                           Stage 7 = 18 x 2 bed units
                                                                           Stage 8 = 20 x 2 bed units
                                                                           Stage 9 = 12 x 2 bed units

2.   The applicant is informed that payment via credit card transaction will not be an acceptable
     method of payment for development contributions conditioned in this permit or for
     infrastructure charge notices issued separately.
3.   The requirement for payment of infrastructure contributions has been assessed in accordance
     with Council’s policy “Infrastructure Contributions (Charges) Rebates for Eligible Community
     Organisations”. This approval is based on the organisation type and purpose of development
     in accordance with Table 1 of the policy as detailed in the contribution condition of the
     Development Permit.
4.   The applicant is advised that a Compliance Permit for all plumbing and drainage works within
     the boundaries of the development site shall be obtained from Council’s Plumbing Services
     Section prior to obtaining a Development Permit for Building Works.
5.   A separate loop of water main should be installed within the property boundary for domestic and
     fire services. Fire hydrants and fire sprinklers are should be connected to the fire main. Fire hose
     reels and the domestic supply to be connected to the metered domestic service.
6.   The applicant is advised that this development may require the provision of fire hydrants and a
     booster pump in accordance with the Building Code of Australia, and in consultation with
     Queensland Fire Services to ensure suitable fire fighting infrastructure is provided. To this end
     any necessary fire hydrants shall be clearly shown on the plans submitted for both Operational
     Works and Building Works approvals and if a booster pump is deemed necessary, the plans
     shall indicate where the fire truck is to be accommodated in order to provide boosting to the
     water supply.
7.   A Waste Management Plan shall be in accordance with Planning Scheme Policy No. 9 and
     further, shall include the following information: -
     7.1     The types of waste that will be generated from the activities approved within the
             development.
     7.2     Estimated volumes or tonnage of both recyclables and waste generated.
     7.3     Methods to be used for dealing with garden waste.
     7.4     Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling.
     7.5     Description of procedures for getting all waste to the bins; the storage of bins and the
             collection of bins by the contractor.



                                                                                          Page 18 of 32

Used in these records

About this file

File size
644 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice plus copy sent to Referral Agencies [As Published].pdf · 644 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.