Council archive · source document
Decision Notice plus copy sent to Referral Agencies [As Published] · 132007.2398
2007/2398 Page 26 of 32 [OCR of page images] 2007/2398 ISSUES / CONDITIONS OF DEVELOPMENT FOR | THE REASONS, INFORMATION, CONCERNS THE SUBJECT APPLICATION STUDIES, FINDINGS, USED IN SETTING OF CONDITIONS INCLUDED: Cost of works. All works associated with this proposal, Main Roads does not contribute to including relocation of services, lighting, etc. | private development works unless a must be carried out at no cost to Main Roads, | specific agreement has been entered into. Noise assessment. The applicant is responsible for achieving the | Environmental Protection Act 1994. acoustic quality objectives of the Environmental Protection Act 1994 and the Main Roads document, "Road Traffic requirements of Main Roads document, Road | Noise Managentent: Code of Practice”. Traffic Noise Management: Code of Practice. Main Roads will not be responsible for the provision of any buffers or noise attenuation measures necessary to maintain an appropriate level of amenity for residential or other noise sensitive uses. The applicant is to provide these noise attenuation facilities which are to be located clear of the State-controfled road reserve, Stormwater runoff. ‘The applicant is to undertake all necessary Maintaining the safety and efficiency of works to ensure that future stormwater runoff from the proposed development is no worse than currently exists. the State Controlled road metwork, The existing downstream drainage infrastructure has insuffickent capacity to accommodate any increased runoff. Page 26 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice plus copy sent to Referral Agencies [As Published]Related documentApplication case desk ↗
About this file
- File size
- 644 KB (small file)
- File type
No other editions are linked here.