Skip to the record
For the highest quality transcripts.

Council archive · source document

Decision Notice - 010.2009.00000654.001 [As Published] · 142009.654

of 6

Text shows just the words. Original shows the document exactly as it was published.

                                                                                          2009/654



2.    All existing jetties and boat storage devices shall be removed.
3.    Structures should be designed and constructed such that they are free standing within the
      waterway and are not connected to or behind the revetment wall.
4.    Jetties should have a level-walking surface of R.L 1.000 A.H.D or be level with the top of the
      revetment wall.
5.    A rigid handrail shall be fitted on one side of the walkway.
6.    No posts or vertical supports of the proposed jetty are to extend vertically from the structure
      unless they provide support for the handrail.
7.    No boatlifting devices are to be attached or moored at the jetty structure for the purpose of
      elevating a vessel above the water without Council approval.
8.    There shall be no electrical reticulation system carrying electricity in excess of 24 volts beyond
      the revetment wall.
9.    Lighting associated with the use shall be designed, installed, operated, and maintained in
      accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
10.   Rock scour protection, wrapped in geotextile, extends 3000 mm from the face of the revetment
      wall in this locality. Prior to driving piles, the rocks are to be removed to expose the geotextile
      and the geotextile cut neatly to allow it to be turned back. During pile driving, care is to be
      taken to ensure the geotextile is not damaged. At the completion of pile driving, the fabric is to
      be turned down around the pile and the rocks replaced around the piles.
11.   The jetty is to be used for private purposes only with no commercial operations to be
      undertaken.
12.   Boat repair activities will not be permitted on site.
13.   Wastewater and sullage shall only be disposed of at approved pump out facilities.
14.   The mooring facility shall not be utilised for live-aboard purposes.
15.   Any construction and post construction activity is not to impact on the condition of the
      waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
      (1994) and the Environmental Protection (Water) Policy 1997.
16.   The approval or conditions do not constitute a ruling on structural safety and the applicant
      must make their own arrangement to ensure adequacy of design and work. Also any approval
      granted does not warrant that such plans and specifications have been checked in detail, nor
      does not warrant that such plans and specifications have been checked in detail, nor does it
      absolve the owner of the land from complying with all the conditions of this approval and/or
      relevant Council By-Laws and Policies and/or relevant statues and/or statutory regulations in
      the execution and/or performance of said works. The Council does not accept any
      responsibility for the accuracy of such plans and specifications as approved.
17.   Certification by a Registered Professional Engineer of Queensland that states that the jetty is
      constructed in accordance with best practice methods and is structurally sound shall be
      submitted to Council prior to the return of any bond monies held by Council. A final inspection
      and approval of the structure by Council’s Inspector is also required prior to the return of any
      bond monies held by Council. Please contact Council’s Operational Works Assessment
      Section to arrange the inspection.
18.   The jetty shall be licensed with the Council upon completion of the structural work and shall be
      licensed annually thereafter.
19.   The Development Permit for Operational Works of use of premises lapses if the works have
      not been commenced by 11 June 2011, unless an application to extend the relevant period is
      approved by Council.

                                                                                       Page 2 of 6

Used in these records

About this file

File size
55 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2009.00000654.001 [As Published].pdf · 55 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.