Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Appendix B - Code Assessment

Attached to the e-mail Lodgement of Development Application - RAL25/0016.

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Reconfiguring a Lot Code



Stormwater Management Table 9.5.1.3 Criteria for assessable development (part)


Performance outcomes                                                 Acceptable outcomes                                              Assessment
Growth Management
Stormwater Management

PO24                                                                 No acceptable outcome provided                                   PO22 – Complies
Development provides for the effective drainage of lots and roads                                                                     The proposed development will provide effective drainage of lots
in a manner that:-                                                   Editor’s Note— Requirements for the design and construction of   and not impact on the natural flow regime.
                                                                     stormwater management infrastructure are addressed in Part
     a)   maintains the natural flow regime;                         9.4.9 Water Quality and Drainage code
     b)   effectively manages stormwater quality and quantity;
          and
     c)   ensures no adverse impacts on receiving waters and
          surrounding land.



Conflicting land uses Table 9.5.1.3 Criteria for assessable development (part)


Performance outcomes                                                 Acceptable outcomes                                              Assessment
Growth Management
Conflicting land uses

PO25                                                                                                                                  PO25 – Complies
New lots for residential development do not adjoin land located in   No acceptable outcome provided
the Medium impact industry zone or the Low impact                                                                                     The site does not adjoin industrial land.
industry zone.




Rearrangement of Lot Boundaries Table 9.5.1.3 Criteria for assessable development (part)
Log in to download the original file

Appendix B - Code Assessment.pdf · 361 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.