PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 21 JULY 2015
Applicant’s Request
A survey of the site has been undertaken to certify that the building complies with the stipulated
height requirements. Unfortunately the survey has revealed that the building exceeds the 10
metre height limit by 700mm. [A submitted plan] includes a survey of roof heights of the existing
building whilst Figure 2 below indicates the location of the intrusion which relates to the middle
portion of the roof. Due to the slope of the site this area is not readily visible from the street and
has little impact on the surrounds.
Figures 3 and 4 below illustrate the visual presentation of the height intrusion to the Rene Street
frontage. These photographs clearly demonstrate that the front portion of the building complies
with height requirements and that the area of intrusion will not be noticeable from the Rene Street
frontage as the building provides a stepped building form and the area of intrusion is located in
the middle section of the roof.
Page 27 of 140
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.