Original source · versioned page text
2015-07-21 Planning & Organisation Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 21 JULY 2015 RECOMMENDATION That Council note the report by the Development Planner to the Planning & Organisation Committee Meeting dated 21 July 2015 regarding Application No. MCU15/0034 for a Development Permit for Material Change of Use – Service and Utility Type 3 (Tower) situated at 249 Schreibers Road, Cooran and: A. Approve the application in accordance with the following conditions: PLANNING When Conditions must be Complied With 1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans 2. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 4GYM-51-32- 02 Site Specific Notes and Antenna Table drawn by 23/04/2015 SCHR-C1 Aurecon 4GYM-51-32- 02 Overall Site Plan drawn by Aurecon 23/04/2015 SCHR-C2 4GYM-51-32- 03 Site Setout Plan drawn by Aurecon 05/05/2015 SCHR-C3 4GYM-51-32- 03 Site Elevation and Details drawn by Aurecon 05/05/2015 SCHR-C2 3. Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed within this Decision Notice. Building Height 4. The maximum height of the structure must not exceed 41 metres above the finished ground level and the natural ground surface. 5. Certification must be submitted to Council from a Licensed Surveyor which certifies that the monopole structure does not exceed the maximum height requirement of this Decision Notice. 6. No lights are permitted to be attached to the telecommunications facility, except where required for aircraft hazard lighting purposes or similar. Health and Safety 7. The development must not, at any time during the life of the development, result in human exposure to environmental electromagnetic emissions exceeding the current regulations, standards and/or recommendations of the Australian Radiation Protection and Nuclear Safety Agency (ARPANSA). The carrier of the infrastructure must provide, at any time upon request by Council, written certification to demonstrate compliance with this condition. The written certification must assume: a. a maximum number of users over the lifetime of any pole or other supporting structure b. full power usage c. a maximum down tilt of antennae. Page 51 of 140
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.