Original source · versioned page text
20220156 Kauri St OPW
ST
STANDARDS 2004 (AU_NZ)
AN
DA
RD B9
20 9
S
04 B99 (AU_NZ)
STANDARDS 2004
B99
(A
U_
2.6
N Z)
5m
S S S S S S S S S S S S S S S S S S S S S S
B99 (AU_NZ)
STANDARDS 2004 (AU_NZ)
STANDARDS 2004
ST
AN
All rights reserved.
B90904 (AU_NZ) 2.6
(c) 2022 Transoft Solutions, Inc.
DA
5m
STANDARDS 2
All rights reserved.
Solutions, Inc.
(c) 2022 Transoft
RD
B 20
B99
S
9904 (
(c) 2022 Transoft Solutions, Inc. All rights reserved.
B99
STANDARDS 2004 (AU_NZ)
(c) 2022 Transoft Solutions, Inc. All rights reserved.
A U_
N
Z)
B99 ENTRY/EXIT GARAGE UNIT 9 - FORWARDS IN B99 ENTRY/EXIT GARAGE UNIT 5 - FORWARDS IN
STANDARDS 2004 (AU_NZ)
ST
AN
DA
RD
B9200
B99
S
B99
94
STANDARDS 2004 (AU_NZ)
(A
U_
NZ
)
ST
A
2.6
ND
5m
AR
B920904 (AU_NZ)
B9200
DS
rved.
B920904 (AU_NZ)
9 4(
s rese
All right
, Inc.
Solutions
soft
Tran
(c) 2022
DA RDS
2.66m
reserv
ed.
STA N
STANDARDS 2004 (AU_NZ)
rights
Inc. All
ions,
oft Solut
Trans
DS
(c) 2022
A R
AU
ST A ND
_N
Z )
B99 ENTRY/EXIT GARAGE UNIT 8 - FORWARDS IN B99 ENTRY/EXIT GARAGE UNIT 6 - FORWARDS IN
CLIENT DETAILS: PROJECT ADDRESS: APPROVED BY: PROJECT NAME:
PROPOSED RESIDENTIAL DEVELOPMENT
SUNSHINE GROVE PTY LTD TITLE: STATUS:
9 KAURI STREET VEHICLE SWEPT PATHS MATERIAL CHANGE OF USE
© ABN 89 647 469 707 C
B
28/10/22
16/08/22
RFI ISSUE
UPDATED SWEPT PATH LAYOUT
BRP
JAC BRP
BRP
BRP
COOROY, QLD, 4563 BEN PARRY LAYOUT - UNIT 2, 4 & 10 AND
RPEQ: 28084
37 MARY ST
NOOSAVILLE, QLD 4566
A 10/08/22 COMBINED MCU AND OP WORKS ISSUE JAC BRP JB SCALE:
CPEng NER
OPERATIONAL WORKS
+61 7 5211 1003 REV DATE DESCRIPTION DWN CHK APP
AS INDICATED DATE: 19/12/22
DRAWING NUMBER: PROJECT NUMBER: SHEET REV:
SIZE:
RECORCONSULTING.COM REVISIONS
DO NOT SCALE, IF IN DOUBT ASK
C61 20220156 A1 C
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.