Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Stormwater Management Report

of 42

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 18, section 1. The text section number identifies this passage in the reader.

Best Practice Erosion And Sediment Control                   Erosion Hazard Assessment Form


[11] REQUIREMENTS:
     Permission must be obtained from the owner of a road reserve before placing
     any erosion and sediment control measures within the road reserve.

      WARNINGS:
      Few sediment control techniques work efficiently when placed on a road and/or
      around roadside stormwater inlets. Great care must be taken if sediment control
      measures are located on a public roadway, specifically:
       • safety issues relating to road users;
       • the risk of causing flooding on the road or within private property.

      The construction of roads (whether temporary or permanent) will usually modify
      the flow path of stormwater runoff. This can affect how “dirty” site runoff is
      directed to the sediment control measures.

      COMMENTS:
      “On-road” sediment control devices are at best viewed as secondary or
      supplementary sediment control measures. Only in special cases and/or on very
      small projects (e.g. kerb and channel replacement) might these controls be
      considered as the “primary” sediment control measure.

[12] WARNINGS:
     Soils with a pH less than 5.5 or greater than 8 will usually require treatment in
     order to achieve satisfactory revegetation. Soils with a pH of less than 5
     (whether naturally acidic or in acid sulfate soil areas) may also limit the choice of
     chemical flocculants (e.g. Alum) for use in the flocculation of Sediment Basins.

[13] REQUIREMENTS:
     A preliminary ESCP must be submitted to the local government for approval
     during the planning phase for any development that obtains a total point score of
     17 or greater or when any trigger value is scored or exceeded.




IECA (Australasia)                           November 2008                          Page 7
Log in to download the original file

Stormwater Management Report.pdf · 19.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.