Original source · versioned page text
Stormwater Management Report
The original of this document is very large (19.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 20, section 1. The text section number identifies this passage in the reader.
LEGEND
TYPICAL DRIVEWAY SECTION
W
W
LU
KE
SR
OA
D
V
V
V
V
V
V
V
V
V V V V
V
NOTES
PRELIMINARY SITE PLAN
DESIGNED SURVEYOR DATUM DRAWING STATUS
PROJECT
BRISBANE T 07 3852 4333
DRAWN E [email protected]
PHONE LOCATION
CHECKED GOLD COAST T 07 5571 1599 DRAWING NUMBER
E [email protected] USE FIGURED DIMENSIONS ONLY. DO NOT SCALE, IF A DISCREPANCY ARISES
APPROVED CHECK WITH THE PROJECT ENGINEER AND/OR SUPERVISING AUTHORITY. DO NOT
J. HILL RPEQ 19891 SUNSHINE COAST T 07 5391 3777 WORK FROM REDUCED SCALE DRAWINGS (A1-A3 SIZE PAPER). COPYRIGHT OF ALL
For and on behalf of E [email protected] DRAWINGS & WORKS EXECUTED FROM THEM IS VESTED IN WESTERA PARTNERS
TITLE
DATE SHEET NUMBER REVISION
WESTERA PARTNERS PTY. LTD. AND USE OF THERE FORE WITHOUT PERMISSION IS STRICTLY PROHIBITED! IT IS
NORTHERN NSW T 02 6674 8047 THE BUILDERS RESPONSIBILITY TO ENSURE ALL WORKS ARE CARRIED OUT WITH
No. DATE REVISIONS DES DRN CHK APD DOCUMENT CONTROL APPROVED www.westerapartners.com.au ABN 52 097 417 975 E [email protected] DUE CARE AND DILIGENCE TO COMPLY WITH THE CONTRACT DOCUMENTS. CLIENT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.