Dear Sir/Madam
Decision Notice – Minor Change
Planning Act 2016
I refer to your application received on 28 November 2019, requesting a minor change to an existing
development approval. Council on 19 February 2020, decided your requested changes.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: 132004.5633.02
Street address: 35 Rules Rd Pomona Qld 4568
Real property description: Lot 6 RP 848414
Planning Scheme: The Noosa Plan (8 June 2018)
2. DECISION DETAILS
The following type of approval was issued on 19 May 2005
Development Permit for Material Change of Use of Premises – Educational Establishment
In relation to the request to make a minor change to the existing approval, Council on 19 February
2020, decided to approve the requested changes. The changes are detailed below.
A. Approve the change
B. Amend conditions 1 & 5
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
PO Box 141 P. (07) 5329 6500 [email protected]
TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au
Page 1 of 7
Document Set ID: 21091411
Version: 5, Version Date: 21/02/2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 11 (of 19)
Section 2
4. ASSESSMENT MANAGER CONDITIONS
Land Use
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are numbered Dhamma Rasmi –
Master Plan prepared by Bal Salrai LFRAIA Architect as included with the application;
Reception/ Administration Office Drawing prepared by Bal Salrai Architect and dated 10
September 2004; VSQ-002C1 to VSQ-002C3; VSQ-002B1 to VSQ-002B2; VSQ-002A1 to
VSQ-002A3 prepared by Bal Salrai Architect and dated 16 November 2004 and as may be
amended by these conditions.
Additional Plans – 19 February 2020
Plan No. Rev. Plan/Document Name Date
WD 301 F Site Plan, prepared by REFRESH Design 16/02/2018
As annotated by Council
WD 401 P Ground Floor Plan, prepared by REFRESH 15/11/19
Design
WD 402 P Upper Floor Plan, prepared by REFRESH 15/11/19
Design
WD 403 N Roof Plan, prepared by REFRESH Design 15/11/19
WD 404 P Elevation East, prepared by REFRESH 15/11/19
Design
WD 405 P Elevation West, prepared by REFRESH 15/11/19
Design
WD 406 P Elevation South, prepared by REFRESH 15/11/19
Design
WD 407 P Section 1, prepared by REFRESH Design 15/11/19
WD 408 P Section 2, prepared by REFRESH Design 15/11/19
WD 409 P Section 3, prepared by REFRESH Design 15/11/19
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. The disturbed areas in the vicinity of the new building extension and the new 5 bay car park
adjoining the reception office are to be landscaped in accordance with Council’s Policy on
Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably
qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior
to the new building extension being occupied and maintained at all times thereafter.
4. Existing trees on the site and within road reserves are to be retained, except where required
to be removed due to building operations or the conduct of the approved use. These
landscape plans required to be submitted are to denote areas of existing vegetation or any
existing trees proposed or required to be retained.
Page 2 of 7
Document Set ID: 21091411
Version: 5, Version Date: 21/02/2020
Section 3
5. No part of the building extension shall exceed a height of 9m to the peak or ridge of any
pitched roof, and 8m elsewhere above the natural ground level and the finished ground level.
Except for the peak of the approved annexe building which must not exceed a height of
9.05m above the natural ground level and the finished ground level.
6. Any advertising sign or device is to comply with Council's policies on advertising.
7. Security in the form of a cash bond or trading bank guarantee to the sum of $5000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will
be returned on performance of the conditions of approval less any costs incurred by Council
in respect of enforcing performance of this permit.
8. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
9. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.
10. The maximum number of people to be accommodated on site is 52, which includes all
teaching, caretaking and other staff.
11. The proposed development shall have all bathroom fittings comply with the AAA Water
Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products -
Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard
Part 1.2), with toilets to comply with the AAAA Water Conservation Rating System. All tap
ware and shower roses shall not exceed a maximum flow of 9 litres per min.
12. All additional hot water systems shall be either solar systems; electric heat pump systems;
or gas systems (LPG or natural).
13. This Development Permit for a material change of use of premises lapses if:-
13.1. the use or erection of a building or other structure associated with the use, has not
happened by 19 May 2009, unless application is made and approved by Council for an
extension; or
13.2. the use of the premises (extension to educational establishment) pursuant to the
Development Permit ceases.
Land Development
Carparking Off Street
14. The new carparking shall be provided within the site as shown on Dhamma Rasmi – Master
Plan prepared by Bal Salrai LFRAIA Architect and referenced as Number 15 – Staff
Carparking, except as modified herein.
15. A minimum of 25 uncovered carpark spaces shall be provided on site, which shall include
the existing 20 spaces and the proposed new 5 spaces. The proposed new 5 spaces shall
include 1 clearly defined disabled carpark space.
16. The proposed new car parking area outside Reception Office shall be designed to comply
with the provision of AS2890.1-2004 for user class 1 with allowance for vehicles to enter and
leave the site in a forward gear.
17. The proposed new car parking area outside the Reception Office shall be kept, maintained
in a condition fit for use.
18. The new carparking area shall be free draining and the pavement constructed to a gravel
access road standard. Plans and specifications for these works shall be submitted in
conjunction with an application for a Development Permit for Operational Works.
Pathways
19. Deleted.
Page 3 of 7
Document Set ID: 21091411
Version: 5, Version Date: 21/02/2020
Section 4
Vegetation Protection
20. Additional pavements within the drip zone of any of the existing trees on site to be retained
shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
allow water that falls on this surface to penetrate to the trees root system. The pavement
shall be constructed so as not to damage the tree or their root system and in this regard
temporary fencing shall be provided around the trees during construction to help protect
them.
Plans shall be submitted to the Council for approval that clearly show the type and extent of
the pervious pavement and the temporary fencing prior to obtaining a Development Permit
for Operational Works.
Stormwater Drainage
21. All stormwater drainage shall be collected on site and discharged so there is no net increase
in stormwater runoff from the site.
22. All site stormwater drainage from the additional structures shall be by means of a gravity
system.
23. Roof runoff shall be directed to a rainwater storage system or tank (minimum storage 1000
litres) that is plumbed to service the toilets and bathroom of each new cabin. The design of
the rainwater storage system shall be to the satisfaction of the Manager Plumbing Services.
24. To ensure that polluted run-off does not enter the tributary of Cooroora Creek, stormwater
run-off from the new carparking area and any new driveways shall have the first flush (the
first 12 mm of rainfall or hose-down) treated via a grassed swale or similar treatment system
using Water Sensitive Urban Design principles.
Effluent Disposal
25. Deleted.
Earthworks
26. Filling works required on site shall be carried out in accordance with Section 3.8 of Council’s
Engineering Design Standards Manual and so as not to cause the ponding of water on any
adjoining lands or the blockage of, or interference with, any natural watercourses.
27. Deleted.
Erosion and Sediment Control
28. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required
to be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
General
29. Any damage caused to any public utility during the course of construction shall be repaired
to Council’s standards and at no cost to Council.
30. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to
or from the site shall be covered to prevent materials including dust being windblown from
the vehicle.
Environmental Health
31. Deleted.
32. Deleted.
Page 4 of 7
Document Set ID: 21091411
Version: 5, Version Date: 21/02/2020
Section 5
5. REFERRAL AGENCIES
Not Applicable
6. ADVISORY NOTES
Advice
1. The construction and operation of the development is to be in accordance with Noosa Shire
Council Policy – Development of Hostels.
2. We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their
responsibilities under the Disability Discrimination Act (DDA) in regard to the installation of
disabled access and the provision of disabled facilities, and that access to this building and
the provision of sanitary facilities may need to comply with the requirements of Section D
Part D3 and Section F Clause F2.4 of the Building Code of Australia.
3. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act
if the cost of operational works exceeds $80,000, then a portable long service levy is required
to be paid. In accordance with Section 77(1) of the Act, Council is required to sight the
approved form issued by the Building and Construction Industry (Portable Long Service
Leave) Authority that confirms that the requirements of the Act have been satisfied. A
statutory declaration outlining the cost of the operational works must be submitted to Council
with the lodgement of any application for operational works over the site.
4. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:-
4.1. On a Sunday or public holiday, at any time; or
4.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
5. A maximum penalty of $1,500 applies to an offence under this legislation.
6. An “Application for Approval of Plans for Fit Out of Food Premises” is required if there is to
be any changes to the existing food preparation kitchen prior to works commencing. A
potable drinking water supply in accordance with the Food Safety Standards is to be provided
to kitchen and water for drinking.
7. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud,
paint, cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed
where it could reasonably be expected to move into a roadside gutter, stormwater drain or a
water course. On the spot fines apply for such offences.
Infrastructure Charges
8. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue.
7. PROPERTY NOTES
Not Applicable
8. VARIATION APPROVAL DETAILS
Not Applicable
Page 5 of 7
Document Set ID: 21091411
Version: 5, Version Date: 21/02/2020
Section 6
9. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Building Works All Building Works
Development Permit for Operational Works Landscaping, car parking, stormwater drainage
10. SUBMISSIONS
Not Applicable
11. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written
representations to Council about the conditions contained within the development approval. If
Council agrees or agrees in part with the representations, a negotiated decision notice will be
issued. Only one negotiated decision notice may be given.
12. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at
www.noosa.qld.gov.au or at Council Offices.
Yours faithfully
Billy Glover
Development Planner
Enc: Appeal Rights
Infrastructure Charge Notice
Approved Plans/Documents
DECISION NOTICE HISTORY
Original Decision Notice – 19 May 2005
Negotiated Decision Notice – 11 August 2005, with an amendment
to conditions 3, 10, 11, 12, 13.2, 14, 15, 16, 17, 18, 20, 22, 24;
delete conditions 19, 25, 27, 31 & 32
Decision Notice – Minor Change 132004.5633.02 – 19 February
2020 – Amend conditions 1 & 5
Page 6 of 7
Document Set ID: 21091411
Version: 5, Version Date: 21/02/2020
Section 7
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
229 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(2) An appellant may start an appeal within the appeal period.
(a) if a submitter or advice agency started the appeal in the P&E
(3) The appeal period is –
Court – 2 business days after the appeal has started; or
(a) for an appeal by a building advisory agency – 10 business
(b) otherwise – 10 business days after the appeal is started.
days after a decision notice for the decision is given to the
agency; or (5) A notice of appeal given to a person who may elect to be a co-
respondent must state the effect of subsection (6).
(b) for an appeal against a deemed refusal – at any time after the
deemed refusal happens; or (6) A person elects to be a co-respondent by filing a notice of election,
in the approved form, within 10 business days after the notice of
(c) for an appeal against a decision of the Minister, under chapter
appeal is given to the person.
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under 231 Other appeals
section 269(3)(a) or (4); or
(1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
(d) for an appeal against an infrastructure charges notice – 20 the Supreme Court decides a decision or other matter under this
business days after the infrastructure charges notice is given Act is affected by jurisdictional error, the decision or matter is non-
to the person; or appealable.
(e) for an appeal about a deemed approval of a development (2) The Judicial Review Act 1991, part 5 applies to the decision or
application for which a decision notice has not been given – matter to the extent it is affected by jurisdictional error.
30 business days after the applicant gives the deemed
(3) A person who, but for subsection (1) could have made an
approval notice to the assessment manager; or
application under the Judicial Review Act 1991 in relation to the
(f) for any other appeal – 20 business days after a notice of the decision or matter, may apply under part 4 of that Act for a
decision for the matter, including an enforcement notice, is statement of reasons in relation to the decision or matter.
given to the person.
(4) In this section –
Note – decision includes-
See the P&E Court Act for the court’s power to extend the appeal
(a) conduct engaged in for the purpose of making a decision; and
period.
(b) other conduct that relates to the making of a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (c) the making of a decision or failure to make a decision; and
(5) If an appeal is only about a referral agency’s response, the (d) a purported decision; and
assessment manager may apply to the tribunal or P&E Court to
(e) a deemed refusal.
withdraw from the appeal.
non-appealable, for a decision or matter, means the decision or
(6) To remove any doubt. It is declared that an appeal against an
matter-
infrastructure charges notice must not be about-
(a) is final and conclusive; and
(a) the adopted charge itself; or
(b) may not be challenged, appealed against, reviewed, quashed,
(b) for a decision about an offset or refund-
set aside or called into question in any other way under the
(i) the establishment cost of trunk infrastructure identified in Judicial Review Act 1991 or otherwise, whether by the
a LGIP; or Supreme Court, another court, a tribunal or another entity; and
(ii) the cost of infrastructure decided using the method (c) is not subject to any declaratory, injunctive or other order of
included in the local government’s charges resolution. the Supreme Court, another court, a tribunal or another entity
on any ground.
230 Notice of appeal
232 Rules of the P&E Court
(1) An appellant starts an appeal by lodging, with the registrar of the
tribunal or P&E Court, a notice of appeal that- (1) A person who is appealing to the P&E Court must comply with the
rules of the court that apply to the appeal.
(a) is in the approved form; and
(b) succinctly states the grounds of the appeal. (2) However, the P&E Court may hear and decide an appeal even if
the person has not complied with the rules of the P&E Court
(2) The notice of appeal must be accompanied by the required fee.
Page 7 of 7
Document Set ID: 21091411
Version: 5, Version Date: 21/02/2020
Section 8
48
44
49
41
-
50
Only the change to the Annexe building APPROVED PLAN
51
52
53
PRELIMINARY
40
132004.5633.02
54
is approved on this site plan
55
56
39
POTENTIAL NOOSA COUNCIL
57
WAL
40 FIRE FIGHTING KIN
19 FEBRUARY 2020
G TR
TANK ACK
NOT FOR CONSTRUCTION
58
3,500
-
59
VEHIC
LE TR
ACK
00
9,0
,500
R
R 12
MALE 8 59
MALE 4
40
39
MALE 1 58
52
38
53
SERVER ACCOM.
54
MALE 8
55
56
3
MALE
47 48 49 50 51 52 53 MALE54 55 56 57 58
DRA
IN H1&4 Proposed Minor
11 + 10 Car Parks
7
MALE
Change to Annexe
3,625
FO
OT MALE 2 B1&2
PA
5,050
G1&2
min 3.9m
TH
R
3,0
SWAL
16 Car Parks
00
DAM 00 6
MALE
HANDICAPED
13,500 6,700 5,838
40
6,0
E DR
SWAL
R
CAR PARK
EXISTING
AIN
3,992
COVERED DROP OFF
ED
F1&2
RAIN
C1-4
CAR PARK
19,066
3,500
2,6
00
A1-5 MALE 5
52
R
5
0 ,000
R5
,00
E1&2
5,4
4,116
00
D1-4
SWA
ACCESS
2,200
AT
LE D
7,108
13,759
ND
IBLE PAT
RES.
RAIN
OU
10,247
MP RY
LOW FEATURE LANDSCAPING
CO A
W ND
HIGH
PLANTS
SCREENING
NE BOU
H
41
R
5,0
ABLUTION
EXISTING POINT OF
00
MALE
WATER SUPLY
IN
DRA
YARD
SERVER'S
MALE
ALE
SW
DINING
DRAIN
42
43
40
22,300
41
SWALE DRAIN
AT AT PATH
6,500 3,932 11,869
OFFICE METTA DAY SCAPING
LAND-
RES.
KITCHEN AREA FEATURE
39
& MINI AT
HALL INTERV. MEDITATION ANNEXE FOR
OFFICE ROOM
HALL SINGLE MEDITATION
FEMALE
IN
DELIVERY SERVICE
DAM 45
DRA
AREA
AT 10,432 POTENTIAL
DINING
ALE
EXISTING FIRE FIGHTING
10 Car Parks
ABLUTION
SW
RES.
FEMALE
E EN
TRY FO
R
TANK
SERVIC ENANCE
MAINT ES
VEHICL
ALTERNATIVE ACCESS PATH
FOR FEMALE OLD STUDENTS
53
45
39
COMPOUND BOUNDARY
54
80kL
55
40
SERVER ACCOM.
P1-4 Q1-2
56
41
FEMALE
80kL
O1-4
43
AT
44
RAIN
RES.
LE D
42
57
80kL
M1-4
SWA
40kL R1-4
45
IN
IN
A
DRA
DR MINI HALL
ALE
ALE
SW
SW
FEMALE 3 S1-4
DAM N1-5
(DRY)
ND
FEMAL
BUSHLA
E8 FEMALE 6 FEMALE 4 59
46
FEMALE 1
LINE OF
IMATE
FEMALE 7
APPROX
FEMALE 5 60
FEMALE 2
POTENTIAL 61
47
FIRE FIGHTING
48
TANK
49
50
OLD COMPOUND BOUNDARY
51
Section 9
52
NEW COMPOUND BOUNDARY
53
54
55
56
EXISTING SEWAGE 62
57
'Potential Fire Fighting Tank' to be located TREATMENT SYSTEM
58
OLD COMPOUND
59
BOUNDARY
60
VEHICLE TRACK
61
62
in an already cleared area on-site WALKING TRACK 63
NEW COMPOUND 64
BOUNDARY
65
WORK IN PROGRESS
Client Phase Revision Scale
© 2017 • REFRESH*DESIGN PROPRIETY LIMITED | STUDIO 5/33 VULTURE ST, WEST END, QLD 4101 AUSTRALIA | [email protected] | WWW.REFRESHDESIGN.COM.AU VIPASSANA TRUST QUEENSLAND ISSUE FOR CONSTRUCTION F 1:1000 @ A3
THESE DESIGNS AND DRAWINGS ARE COPYRIGHT AND REMAIN THE PROPERTY OF THE EDMO PTY LTD ATF OBRA TRADING AS REFRESH*DESIGN. USE OR COPYING OF THE DOCUMENT IN WHOLE OR IN PART WITHOUT THE WRITTEN PERMISSION OF THE ARCHITECT CONSTITUTES Project Number & Name Drawing Title Date Drawing No
Document Set ID: 21086471
21016229
STUDIO FOR ARCHITECTURE
AN INFRINGEMENT OF THE COPYRIGHT. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE TO BE CHECKED ONSITE PRIOR TO COMMENCEMENT OF WORK. ANY DIMENSIONS NOT NOMINATED MUST BE REFERED TO THE ARCHITECT FOR CONFIRMATION. PRINTED: 16/ 02/ 2018 17DS_DHAMMA RASMI ANNEX SITE PLAN INCL. NOT APPROVED BUILDINGS IN BLUE 16/02/2018 WD 301
Version: 6,
1, Version Date: 21/02/2020
29/11/2019
Section 10
750
+50 C - REV DATE DESCRIPTION BY
190
267 190 3,000 190 APPROVED PLAN N 19/4/19 ISSUE FOR CONSTRUCTION ER
1,619
DP1
3,900 D4 132004.5633.02 P 15/11/19 ISSUE FOR DA CHANGE ER
2
190 004 3,520 190 850mm MIN NOOSA COUNCIL
180
FOR PWD ACCESS
19 FEBRUARY 2020
90
D4 DOOR MULLION D6
750
190
190
SHOES +50
610
-
2,124
CON1
2,085
190
504
DP1
2
1,910
408 D4
D 850mm MIN B
4,010
2,510
2,850
90
3,630
2,300
CON1 FOR PWD ACCESS +50
2,505
1,590
190
17,408
TGSI AS PER
5,230
MALE AS 1428.1
DP1
DP1
ENTRY
2,107
8,370
750
215 D1.09 2070x1540MM 610 870 870 610 1,205
1:14 CLEARANCE FOR PWD
C DOOR SCHEDULE
2,263
+50
190
RAMP D1 720x2340 SWING DOOR, SOLID DOOR
DP1
4,084
267 190 3,000 190 D2 870x2340 SWING DOOR (OPENING TO BE 850 MIN.), SOLID CORE DOOR
6,090
810
190
1,619
D3 DELETED
D4 CON1 460 P D4 870x2700 SWING DOOR, TIMBER DOOR WITH GLASS PANES,
D10
+200 STORE 8 WITH FIXED SIDE & TOP GLAZING (REFER TO ELEVATION)
D2 50
1,350
800
1,10
850mm MIN 1,805 598 800 D5 DELETED
1
1,434
3,793
180
FOR PWD ACCESS
SLAB
90
D6 870x2700 SWING DOOR, DOUBLE ACTING
217
3 800 930 D1
TIMBER DOOR WITH GLASS PANES
278 800
2
D1 +200
1,350
190
+50 WITH FIXED SIDE GLAZING (REFER TO ELEVATION)
2,124
CON1
AGVE
407 460
2,085
190
276 FIRE WALL D7 920x2340 SWING DOOR, SOLID CORE DOOR
VER
190
ING O
OF ST
D1 297 850 110 D1 NO STRUCTURE D8 DELETED
GLAZ
1,000
800
TO PENETRATE D9 720x2340 SWING DOOR, SOLID CORE DOOR
2
800
1,910
TGSI AS PER
ETER
1,400
5,830
GLAZ D10 820x2340 (x2) DOUBLE SWING DOOR, SOLID CORE DOOR LOCKABLE
27
D4 THIS WALL
6
AS 1428.1 ING O
PERIM
7
D1
D1
D1 VER
29
CON1 DP1
D1
7,206
800
190
297
2,800
REFER TO FINISHES SCHEDULE
+300
1,400
+300
D1
DEMOLISH WALL MALE
DP1 UNDER STAIR CON1 UPPER RING
190
190
3,793
D1
D1
STORE
GLAZ
ENTRY
190
D1
MOVEABLE
VER
190
210
ING O
5,506
WALL
ING O
+300 D9 D9
190
+200
3,400
VER
D6
+300 REVOVABLE
GLAZ
SHOES
STORE
3,780
2,970
CON1 PANEL
480 100
190
2,590
SHOES
+300
D9
CON1
9
900 110
D9
1
3,400
16,380
E SERVICES A
670
407
2,400
D6
805
190
+200 CON1 +300
D9
190
STORE 100 1,499
FEMALE 550 110
D9
110
GLAZ
D1
+300
190
190
23°
VER
UPPER RING D9 13°
SERVICES
D9
ING O
1,446
ING O
190
ENTRY
220
VER
190 1,361 190 3,020 190
190
GLAZ
D1
D1
PLANT ROOM SHOWN IN DIFFERENT
11
+300
190
D1
D1
+300
0
1,461 DEMOLISH ALL WALLS
DP1 POSITION FOR REFERENCE
2,516
1,846
SHOWN IN GREEN
1,000
190
D1
1,513
D1
700 2,000 700 5,347 5,053 6,795 140 550 1,299 1,416 169 13,996
D1 30,520
190 3,020 190 CON1 D1 OVER 110 205
3,400
DP1 11°
G
D1
LAZIN
D1
G
13,800
D1 GLAZ 110
850 D1
3
971
404
ING +200
1,51
MECHANICAL
1
1,51
P
D1 2,17 OVER 460
CONDENSOR
3
1 PLANT AS PER MECHANICAL ENGINEER'S DRAWINGS
1,350
3 11° D1 11°
CON1 407 110 190 DATA BOX
SHOES
SHOES
LINE OF CONC SERVICES 920
D2 SWITCH BOX
22
850mm MIN Section 11
+200 CULVERT BELOW 400
1,5
1,5
LIGHT & POWER
22
D10
FOR PWD ACCESS
STORE D7
D4 11° 11°
190
1,350
4,084
1,5 20
1:14 1,5
24
20 850
,04
460
0
24
RAMP DP1
G
,54
CON1 1
0
5 11°
11° 1,50 TGSI AS PER 1,50 407
3,020
3,400
6 MECHANICAL
2,184
DP1
AS 1428.1 CONTROL PANEL
DP1
1,257 PLANT
1,257 2,183 FOR MECH. SYSTEM
850mm MIN 11° CONTROL SWITCH
190
10°
CON1 F FOR PWD ACCESS H FOR MECH. SYSTEM
200x200 OPENING
4,010
FEMALE 15° D4 2 1000Hx1000Wx100D 1,000 1,600
FOR VENTILATION
P DP1 15° OF ROOM
ENTRY 408 WEATHERLOUVRES C/W
PANEL FILTER
CON1
SHOES
SHOES
DISTANCE OF EXIT: 190 5,270 190
850mm MIN TOTAL: 10325+ 3725 + 3453
SHOES
FOR PWD ACCESS = 17503 METERS
190 2 3,520 190 1 GROUND FLOOR PLAN 1:50 D4 DP1
004 3,900
GFL UFL TOTAL
33 8 41
G
Client Phase Revision Scale
© 2017 • REFRESH*DESIGN PROPRIETY LIMITED | STUDIO 5/33 VULTURE ST, WEST END, QLD 4101 AUSTRALIA | [email protected] | WWW.REFRESHDESIGN.COM.AU VIPASSANA TRUST QUEENSLAND ISSUE FOR DA CHANGE P @ A1
THESE DESIGNS AND DRAWINGS ARE COPYRIGHT AND REMAIN THE PROPERTY OF THE EDMO PTY LTD ATF OBRA TRADING AS REFRESH*DESIGN. USE OR COPYING OF THE DOCUMENT IN WHOLE OR IN PART WITHOUT THE WRITTEN PERMISSION OF THE ARCHITECT CONSTITUTES Project Number & Name Drawing Title Print Date Drawing No
STUDIO FOR ARCHITECTURE
AN INFRINGEMENT OF THE COPYRIGHT. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE TO BE CHECKED ONSITE PRIOR TO COMMENCEMENT OF WORK. ANY DIMENSIONS NOT NOMINATED MUST BE REFERED TO THE ARCHITECT FOR CONFIRMATION.
1:100
PRINTED: 15/ 11/ 19 17DS_DHAMMA RASMI PAGODA STAGE 1 - GROUND FLOOR PLAN 15/11/19 WD 401
Document Set ID: 21086471
21016230
Version: 6,
1, Version Date: 21/02/2020
29/11/2019
The text continues on section 12.