Original source · versioned page text
Attachment B -Minor Change approval
Original PDF page 14, section 1. The text section number identifies this passage in the reader.
-
APPROVED PLAN REV DATE
K 20/12/18
DESCRIPTION
ISSUE FOR CONSTRUCTION
BY
ER
132004.5633.02 P 15/11/19 ISSUE FOR DA CHANGE ER
NOOSA COUNCIL
19 FEBRUARY 2020
-
STAGE 2
RL 3.000
900
RL 2.100
3,100
RL 0.200
1,600
P
RL -1.000
RL 9.050
5,990
SKY1
FEMALE ENTRY STAGE 2
UPPER RING SKY1 MTS1 SKY1
8,850
MTS1 EG1
MTS1
EG1
RL 3.000 RL 3.060
EG1
60
900
CFC1 BWR1 CFC1 RL 2.100
2,800
BWR1
2,300
3,100
RL 0.200 RL 0.200
RL -1.000
1 ELEVATION SOUTH
Client Phase Revision Scale
© 2017 • REFRESH*DESIGN PROPRIETY LIMITED | STUDIO 5/33 VULTURE ST, WEST END, QLD 4101 AUSTRALIA | [email protected] | WWW.REFRESHDESIGN.COM.AU VIPASSANA TRUST QUEENSLAND ISSUE FOR DA CHANGE P 1:100 @ A3
THESE DESIGNS AND DRAWINGS ARE COPYRIGHT AND REMAIN THE PROPERTY OF THE EDMO PTY LTD ATF OBRA TRADING AS REFRESH*DESIGN. USE OR COPYING OF THE DOCUMENT IN WHOLE OR IN PART WITHOUT THE WRITTEN PERMISSION OF THE ARCHITECT CONSTITUTES Project Number & Name Drawing Title Print Date Drawing No
STUDIO FOR ARCHITECTURE
AN INFRINGEMENT OF THE COPYRIGHT. DO NOT SCALE FROM DRAWINGS. DIMENSIONS ARE TO BE CHECKED ONSITE PRIOR TO COMMENCEMENT OF WORK. ANY DIMENSIONS NOT NOMINATED MUST BE REFERED TO THE ARCHITECT FOR CONFIRMATION. PRINTED: 15/ 11/ 19 17DS_DHAMMA RASMI PAGODA STAGE 1 - ELEVATION SOUTH (MIRROR TO NORTH) 15/11/19 WD 406
Document Set ID: 21086471
21016231
Version: 6,
1, Version Date: 21/02/2020
29/11/2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.