Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Operational Works Report_RosesRd Access 29 April2025

of 35

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                             Callaghan & Toth

Performance outcomes                               Acceptable outcomes

Connectivity
PO5                                                AO5                                  Complies with PO5
Development is designed and                        Development is designed and
operated to maintain and                           operated to maintain ecological      The proposed driveway and culvert
enhance connectivity between                       linkages and maximise opportunity    crossing are located in an existing
and across ecologically                            for connectivity and the movement of access pathway, and historical
important areas and connecting                     fauna by:                            waterway crossing location.
habitat and support unimpeded
and safe movement of terrestrial                    1.   ensuring protection of wildlife   The provision of 50m return on
and aquatic fauna.                                       refuges;                          koala fencing will ensure that
                                                    2.   maintaining vegetation in         terrestrial fauna will be directed to
                                                         patches of the greatest possible the riparian areas for movement and
                                                         size and within the smallest      not onto the Old Bruce Highway.
                                                         possible edge-to-area ratio;
                                                    3.   enhancing connectivity through The culvert has been designed in
                                                         planting and rehabilitation       accordance with the ADR for
                                                         works, including across           waterway barrier works, to ensure
                                                         property boundaries, to areas of fish passage is maintained in
                                                         national park, state forest or    Skyring Creek.
                                                         reserve;
                                                    4.   avoiding the creation of physical Clearing is minimised to maintain
                                                         barriers and safety hazards       habitat values on site.
                                                         (such as roads,
                                                         pedestrian access and instream
                                                         structures) along and within the
                                                         ecological linkage;
                                                    5.   providing mitigation measures
                                                         such as wildlife movement
                                                         infrastructure, fauna exclusion
                                                         and directional fencing,
                                                         underpasses/overpasses and
                                                         traffic calming devices, signage
                                                         and lighting; and
                                                    6.   where offsets are necessary,
                                                         delivering offsets that support
                                                         and enhance ecological
                                                         linkages.




Operational Works Application – Supporting Information                                                       April 2025
36 Roses Road, Federal                                                                                               22
Log in to download the original file

Operational Works Report_RosesRd Access 29 April2025.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.