Council archive · source document
Approved Plans - MCU21-0212 · MCU21/0212
Plans and drawings: the text below has words only, no drawings.
A B C D E F G site details
60 and 66 Seaview Tce,
LOT 4 Sunshine Beach QLD 4567
RP189884
Lot 96 on RP 81810
annel
public walkway Site Area 576 sqm
and ch
site boundary | 24.635 m approx | 94° 20' 40"
areas
te kerb
concre
proposed new dwelling
2.0m setback
lower ground
internal 178.70 m²
1 se
site boundary | 22.183 m approx | 4° 20' 40"
external - pav 26.40 m²
external - pool 23.15 m²
k
LOT 51
costal set bac
sub total 228.25 m²
RP81810
LOT 69
RP81810 ground floor
internal 259.93 m²
Terrace
proposed 2
story dwelling external 26.90 m²
site bounda
external - pav 27.19 m²
sub total 314.02 m²
ry | 22.34
2 level 01
Seaview
internal 12.15 m²
8 m appro
external 78.25 m²
sub total 89.75 m²
x | 177° 21'
3 subtotal internal 450.78 m²
subtotal external 181.89 m²
50"
proposed new
total 632.67 m²
driveway
site cover
proposed new
stormwater max 40% = 230.43 m²
connection
lower ground 219.6 m² / 38.12%
4 proposed new
sewer connection
2.0m setback ground floor 230.16 m² / 39.95%
level 01 29.8 m² / 5.17%
10.5m coa
elec pillar sewer pump out line
proposed electrical site boundary | 27.345 m approx | 274° 20' 40"
2.0m setback
stal setback
connection to new dwelling
elec
power pole notes
LOT 68
RP81810 1. All works to be carried out in
FFL 35.750 accordance with the general
roof ridge approx construction notes on coversheet of this
package.
2. All works to be carried out in
accordance with the DA and BA
including drawings & conditions.
3. Areas measured to outside face of
walls. External covered area
calculations do not include external
areas under eaves, driveway and
uncovered hardscaping.
legend
existing sewer line
existing stormwater line
-
APPROVED PLAN
existing electrical line
MCU21/0212
existing telephone
NOOSA COUNCIL
existing water line
15 SEPTEMBER 2022 note: refer survey for all existing services
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0375
LM
JB
G
H
6.05.22
21.06.22
DA RFI
DA Comparison
66 Seaview Tce, G & C Deane site plan SD 100.00 J SCALE As
indicated
proposed site plan
JB I 19.08.22 DA RFI Response
Sunshine Beach
JB J 01.09.22 DA Approval Set schematic design
1:1 @ A3
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 10 pages
Page 2
-
APPROVED PLAN
MCU21/0212 A B C D E F G
NOOSA COUNCIL 2450 2760 4990
public walkway
15 SEPTEMBER 2022 3000
3000
site boundary | 24.635 m approx | 94° 20' 40"
2.0m setback
timber fence to boundary
3622
pool window
2.0m setback
pool
pool window line of building over
1
sheer + blk
art
dumbells
bike
k
k +3m
coastal setbac
out
1
coastal setbac
site bounda
400.02
gym bed 03
site boundary | 22.183 m approx | 4° 20' 40"
RL 30.280
tim tim
c/trainer
robe
ry | 22.34
6660
natural art
ground
functional
trainer
8 m approx
mirror wall
sheer + blk
bench
f/h
store
| 177° 21
out
' 50"
bed 02
bath shwr tim
line of build
2 robe
dry
1 bathroom
ing over
400.01 tile
wm
tile
laundry
family
3220
sheer
wm
tim
powder
f/h store
rail over
tile up
FFL 30.900
3
art
timber fen
FFL 30.900
linen
wine art
ce to boun
f/h art
sheer + blk
store chute guest
tim
wc
drying ct
dary
out
stone
6580
FFL 30.810 ensuite
tile
gate
1
400.00
shwr
surfboard store
robe
blind
FFL 30.810
line of building over
4 2.0m setback
10.5m coa
up shr
2100
store
stal setback
timber fence to boundary
site boundary | 27.345 m approx | 274° 20' 40"
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0375
LM
JB
G
H
1.04.22
21.06.22
Revised DA
DA Comparison
66 Seaview Tce, G & C Deane floor plan SD 200.00 J SCALE 1 : 100
lower ground
JB I 19.08.22 DA RFI Response
Sunshine Beach
JB J 01.09.22 DA Approval Set
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
schematic design
1:1 @ A3
Page 3
-
A B C D E F G APPROVED PLAN
MCU21/0212
2450 2760 4990 NOOSA COUNCIL
3000 3000 public walkway
15 SEPTEMBER 2022
site boundary | 24.635 m approx | 94° 20' 40"
timber fence to boundary
pool fence
swimming pool
3622
2.0m setback
FFL 34.010
450
1 shower
console
outoor room line of void over
pool living
tile
k +3m
k
coastal setbac
tile
site bounda
equipment
fireplace
coastal setbac
1
400.02
site boundary | 22.183 m approx | 4° 20' 40"
ry | 22.34
6660
Terrace
8 m approx
| 177° 21
scooter
Seaview
' 50"
line of void over
bbq
dining
tile
2
sheer
entry
1 tile
400.01
FFL 34.115 FFL 34.130 FFL 34.140
bar
3220
console f/ht chute
joinery
art
pdr
tile
up kitchen
tile
3
bikes pantry
SUP over
timber fen
roller door
art
?
ce to boun
SUP over
tim
art
proposed new
dary
driveway
chute
6580
garage ensuite
kyack over
SUP over
bath
2.0m setback
con01 tile
1 FFL 33.980
400.00
robe
garage door over
tim
skylight over
wc
f/ht joinery
shr
robe
robe
battery charger
4 2.0m setback
up
2100
bikes
bins gas
timber fence to boundary
elec pillar
site boundary | 27.345 m approx | 274° 20' 40"
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0375
power pole
LM
JB
F
G
1.04.22
21.06.22
Revised DA
DA Comparison
66 Seaview Tce, G & C Deane floor plan SD 200.01 I SCALE 1 : 100
ground level
JB H 19.08.22 DA RFI Response
Sunshine Beach
JB I 01.09.22 DA Approval Set
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
schematic design
1:1 @ A3
Page 4
-
APPROVED PLAN
MCU21/0212 A B C D E F G
NOOSA COUNCIL 2450 2760 4990
15 SEPTEMBER 2022 3000
site boundary | 24.635 m approx | 94° 20' 40"
3000
swimming pool under
3622
2.0m setback
1
line of awning over
facade screen
site bounda
k
k +3m
coastal setbac
1
coastal setbac
facade screen
400.02
ry | 22.34
site boundary | 22.183 m approx | 4° 20' 40"
6660
outdoor room under
8 m approx
| 177° 21
planted
roof over
scooter
' 50"
store roof over
2 glass balustrade
1 stone
400.01
firepit
crockery/ d/w bar fridges
3220
glassware mwave under
sk fridge
up
art
3
powder A/C HWU
services
pebble
6580
roof
1
400.00 solar
array
skl01
4 2.0m setback
2100
site boundary | 27.345 m approx | 274° 20' 40"
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0375
LM
JB
E
F
1.04.22
21.06.22
Revised DA
DA Comparison
66 Seaview Tce, G & C Deane floor plan SD 200.02 H SCALE 1 : 100
level 01
JB G 19.08.22 DA RFI Response
Sunshine Beach
JB H 01.09.22 DA Approval Set schematic design
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
1:1 @ A3
Page 5
-
APPROVED PLAN
MCU21/0212 A B C D E F G
NOOSA COUNCIL 2450 2760 4990
15 SEPTEMBER 2022
3000 3000
site boundary | 24.635 m approx | 94° 20' 40"
3622
2.0m setback
1
site bounda
k
k +3m
coastal setbac
1
coastal setbac
400.02
ry | 22.34
site boundary | 22.183 m approx | 4° 20' 40"
void
6660
8 m approx
| 177° 21
' 50"
fire pit under
solar
array
2
1
400.01
3220
proposed roof shaded grey
3
6580
1
400.00
4 2.0m setback
2100
site boundary | 27.345 m approx | 274° 20' 40"
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0375
LM
JB
E
F
1.04.22
21.06.22
Revised DA
DA Comparison
66 Seaview Tce, G & C Deane floor plan SD 210.00 H SCALE 1 : 100
roof plan
JB G 19.08.22 DA RFI Response
Sunshine Beach
JB H 01.09.22 DA Approval Set schematic design
1:1 @ A3
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
Page 6
-
APPROVED PLAN
MCU21/0212
NOOSA COUNCIL
15 SEPTEMBER 2022
1 2 3 4
ngl +8m
2.00m setback
site boundary
2.0m setback
site boundary
RL 40.480
roof
RL39.790
2400
rnd01 tbs01
roof terrace
RL37.870 skl01
level 01
RL37.390
3250
ngl
tbs01
ground level stn01
RL34.140
3240
lower ground
RL30.900
1 elevation west
- 1 : 100
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0375
LM
JB
E
F
1.04.22
21.06.22
Revised DA
DA Comparison
66 Seaview Tce, G & C Deane boundary elevations SD 300.00 H SCALE 1 : 100
elevation west
JB G 19.08.22 DA RFI Response
Sunshine Beach
JB H 01.09.22 DA Approval Set schematic design
1:1 @ A3
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
Page 7
-
APPROVED PLAN
MCU21/0212
NOOSA COUNCIL
15 SEPTEMBER 2022
C B A
2450.000
costal setback
site boundary
2.0m setback
site boundary
RL 40.480
roof
RL39.790
1920
ngl +8m rnd01
tbs01
roof terrace
RL37.870
level 01
480
RL37.390 rnd01
3250
stn01
stn01
bal01
ground level
RL34.140
fen01
3240
lower ground
RL30.900
ngl
1 elevation north
- 1 : 100
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0375
LM
JB
E
F
1.04.22
21.06.22
Revised DA
DA Comparison
66 Seaview Tce, G & C Deane boundary elevations SD 300.01 H SCALE 1 : 100
elevation north
JB G 19.08.22 DA RFI Response
Sunshine Beach
JB H 01.09.22 DA Approval Set schematic design
1:1 @ A3
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
Page 8
-
APPROVED PLAN
MCU21/0212
NOOSA COUNCIL
15 SEPTEMBER 2022
site boundary
2.5m setback
2.5m setback
site boundary
roof
RL39.790
1920
rnd01 bal01
ngl +8m
roof terrace
RL37.870
level 01
480
rnd01 rnd01
RL37.390
3250
scr01 scr01
bal01
ground level
RL34.140
3240
stn01 stn01 stn01 stn01
lower ground
RL30.900
ngl
fen01
1 elevation east
- 1 : 100
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0375
LM
JB
E
F
1.04.22
21.06.22
Revised DA
DA Comparison
66 Seaview Tce, G & C Deane boundary elevations SD 300.02 H SCALE 1 : 100
elevation east
JB G 19.08.22 DA RFI Response
Sunshine Beach
JB H 01.09.22 DA Approval Set schematic design
1:1 @ A3
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
Page 9
-
APPROVED PLAN
MCU21/0212
NOOSA COUNCIL
15 SEPTEMBER 2022
A B C
site boundary
coastal setback
2.0m setback
site boundary
roof
RL39.790
rnd01
2400
rnd01
roof terrace ngl +8m at line of building
RL37.870 skl01
level 01
RL37.390
fen01 ngl +8m
3250
rnd01 gls01 scr01 scr01 scr01
stn01
ground level
RL34.140
rnd01 stn01
3240
lower ground fen01
RL30.900
ngl
1 elevation south
- 1 : 100
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0375
LM
JB
E
F
1.04.22
21.06.22
Revised DA
DA Comparison
66 Seaview Tce, G & C Deane boundary elevations SD 300.03 H SCALE 1 : 100
elevation south
JB G 19.08.22 DA RFI Response
Sunshine Beach
JB H 01.09.22 DA Approval Set schematic design
1:1 @ A3
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
Page 10
-
APPROVED PLAN
MCU21/0212 A B C
NOOSA COUNCIL
15 SEPTEMBER 2022 1500 1500 500 1615 1500
pdr
site boundary | 22.183 m approx | 4° 20' 4 0"
tile
18 17 16 15 14 13 12 11 10 9 8
up
future concrete path tbc by
council
3
140
bikes
no curb to edge of seaview
terrace at location of SU P over
residence. curb detail and FFL 34.120
construction tbc by coun cil FFL 34.340
and built in accordance with FFL 34.310 FFL 34.345
council standards
roller door
SU P over
note: levels and driveway
profile based on existing
levels take from detail
survey M 3672 3001 001
dated 17/5/21
all driveway levels to be +25 0m m above
reviewed on site with 20
seaview terrace
invert level
builder
max width at kerb invert
FFL 34.080 FFL 34.100
FFL 34.040
5000
4000
kerb transition kerb transition kerb transition roll under
FFL 33.850 gradient m ax 1 in 8 gradien t m ax 1 in 40 gradien t m ax 1 in 20 approx. 1 in 20 garage
approx 1:24 actual
con01
kyack over
SUP over
FFL 33.980
gutter crossing in
accordance with council
standards driveway finish:
natural stone
crazy pave
skylight over
garage door over
FFL 33.775 FFL 33.810
FFL 33.865
f/ht joinery
FFL 33.585
robe
battery charger
4
FFL 33.940 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
up
bin store
bikes
bins gas
elec pillar
site boundary | 27.345 m approx | 27 4° 20' 40"
DRAWN REV DATE ISSUE PROJECT CLIEN T DR AW ING N AM E PHASE DW G NO R EV PRO JECT NO 0375
LM A 6.05.22 DA RFI
66 Seaview Tce, G & C Deane landscape details SD 640.00 A SC ALE 1 : 50
detail driveway plan
Sunshine Beach
D o not scale from draw ings. D imensions are to be checked on site prior to com m encem ent of w ork. Discrepancies to be brought to the attention of the author. A ny dim ensions not nominated m ust be referred to the A rchitect for confirma tion. The concepts and inform ation contained in this docum ent are the copyright of Architect. U se or copying of the docum ent in w hole or in part w ithout the w ritten permission of the A rchitect constitutes an infringem ent of copyright.
schem atic design
1:1 @ A3
Page 11
-
APPROVED PLAN
MCU21/0212
NOOSA COUNCIL
15 SEPTEMBER 2022
A B
roof terrace
RL37.870
1500 1500 500 1615 1500
transition 1 in 8 transition 1 in 40 max 1 in 20 (approx 1 in 24) roll under (approx 1 in 24)
site boundary
kerb invert
seaview terrace
garage
future footpath zone
tbc by council
note: levels and driveway
profile based on existing
levels take from detail
survey M 3672 3001 001
dated 17/5/21
ground level
RL34.140
approx. NG L from su rvey
drying cou rt bath
DRAWN REV DATE ISSUE PROJECT CLIEN T DR AW ING N AM E PHASE DW G NO R EV PRO JECT NO 0375
LM A 6.05.22 DA RFI
66 Seaview Tce, G & C Deane landscape details SD 640.01 A SC ALE 1 : 50
driveway detail section
Sunshine Beach schem atic design
1:1 @ A3
D o not scale from draw ings. D imensions are to be checked on site prior to com m encem ent of w ork. Discrepancies to be brought to the attention of the author. A ny dim ensions not nominated m ust be referred to the A rchitect for confirma tion. The concepts and inform ation contained in this docum ent are the copyright of Architect. U se or copying of the docum ent in w hole or in part w ithout the w ritten permission of the A rchitect constitutes an infringem ent of copyright.
Used in these records
Approved Plans - MCU21-0212.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.