NOOSA COUNCIL IDAS Development Application Decision Notice 6
39. All stormwater drainage shall be collected on site and discharged so there is no net increase in
stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall be discharged
to Council’s existing drainage structures in Hastings Street. Plans of the drainage design shall be
prepared by a Registered Professional Civil Engineer and submitted to Council prior to obtaining a
Development Permit for Operational Works.
The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street drainage
system at any one location is 25 litres/second.
40. To ensure that polluted run-off does not enter Council’s stormwater drainage system, stormwater run-off
from the carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or hose-
down) collected in a grease/oil arrestor provided on site prior to being permitted to discharge into
Council’s drainage system.
All other clean stormwater, such as roof water, can be collected on site and discharged through a single
underground drain line directly into the existing drainage system, bypassing the grease/oil arrestor.
41. To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil arrestors, which
shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational
Works.
A Development Permit for Building Works shall not be granted until a Development Permit for Operational
Works has been issued in regard to the drainage scheme.
42. All site stormwater drainage shall be by means of a gravity system.
43. All stormwater drainage lines including inter-allotment drainage shall be inspected by closed circuit
television (CCTV) prior to commencement of the approved Use.
CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council following
satisfactory completion of construction works. The developer will be responsible for the full cost of CCTV
inspection, including any additional inspection necessary following defect identification and rectification.
This charge is payable prior to the issue of Operational Works approval and will be determined on the unit
rate basis current at the time of approval.
Sewer Mains
44. The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
45. The site shall be connected to Council’s existing town water supply and be constructed in accordance with
Council’s standards and requirements at no cost to Council.
46. Each water connection to the water reticulation system shall extend to the property boundary and be
metered. Where multiple units including leased buildings are served by a single service, multiple water
meters to each individual unit or leased building shall be installed. All fees for the supply of water meters
shall be paid to the Council.
Earthworks
47. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences or
structures that border the development site. Fences that are affected shall be replaced prior to plan
endorsement. In this regard any fences to be replaced shall be clearly shown on the plans submitted for
Operational Works approval.
Site Stability
48. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site, determine the
soil classification, establish whether any measures are required to protect the stability of adjoining
buildings and/or structures, and make recommendations on the type of foundation system(s) best suited
for the proposed development. This information shall be submitted to the Council for assessment and
approval prior to obtaining a Development Permit for Operational Works.
A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@5008487a\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
04/4078 - SUPERSEDED COMPILED Decision Notice [As Published]Related documentApplication case desk ↗
04/4078 - SUPERSEDED COMPILED Decision Notice [As Published]Related documentApplication case desk ↗
0014F2A0.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 140 KB (small file)
- File type
No other editions are linked here.