Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2020-12-17 Ordinary Meeting Minutes

of 25

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                      MINUTES


            Ordinary Meeting

         Thursday, 17 December 2020

                                 5pm
           Council Chambers, 9 Pelican Street, Tewantin




Crs Clare Stewart (Chair), Karen Finzel, Joe Jurisevic, Amelia Lorentson,
Brian Stockwell, Tom Wegener, Frank Wilkie



                    “Noosa Shire – different by nature”
Log in to download the original file

2020-12-17 Ordinary Meeting Minutes(PDF, 942KB).pdf · 965 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 24 sections

Section 2

ORDINARY MEETING MINUTES                                                   17 DECEMBER 2020


1   ATTENDANCE & APOLOGIES
    COUNCILLORS
    Councillor C Stewart, Mayor
    Councillor K Finzel
    Councillor J Jurisevic
    Councillor A Lorentson
    Councillor B Stockwell
    Councillor T Wegener
    Councillor F Wilkie

    EXECUTIVE
    B de Chastel, Chief Executive Officer
    A Saward, Acting Director Community Services
    M Shave, Director Corporate Services
    A Dow, Acting Director Environment & Sustainable Development
    D Iezzi, Director Executive Services
    C Billingham, Director Infrastructure Services

    APOLOGIES
    Nil.

    The meeting commenced at 5.00pm.



2   CONFIRMATION OF MINUTES

    Council Resolution
    Moved:           Cr Finzel
    Seconded:        Cr Lorentson
    The Minutes of the Ordinary Meeting held on 19 November 2020 be received and confirmed.
                                                                          Carried unanimously.


3   MAYORAL MINUTES


    1      AFFORDABLE HOUSING
           Council Resolution
           Moved:          Cr Stewart
           That Council note the Mayoral Minute provided to the Ordinary Meeting dated 17
           December 2020, and:
           A.   Request the CEO to review existing Noosa Council land assets to determine if any
                such land would be appropriate for the development of social housing;
           B.   Request the CEO to incorporate consideration of priority sector employee housing
                within the upcoming review of the Local Economic Plan;
           C.   Request the CEO to bring forward a report to a future Council meeting identifying
                potential amendments to the planning scheme to accelerate the provision of
                suitable community housing;

                                                                                  Page 2 of 25

Section 3

ORDINARY MEETING MINUTES                                                   17 DECEMBER 2020


           D.   Council continue to negotiate with State and Local community housing providers
                in the development of an economically efficient model to achieve a mix of public,
                social and private affordable accommodation within community housing
                developments; and
           E.   Council continue to work closely with State Member Sandy Bolton and her Housing
                Action Group.
                                                                          Carried unanimously.



4   PETITIONS

    Nil.




5   NOTIFIED MOTIONS

    Nil.




6   PRESENTATIONS

    Nil.




7   DEPUTATIONS

    Nil.




                                                                                  Page 3 of 25

Section 4

ORDINARY MEETING MINUTES                                                               17 DECEMBER 2020


8    CONSIDERATION OF COMMITTEE REPORTS


1    PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT – 8 DECEMBER 2020


4    PLANNING APPLICATIONS DECIDED BY DELEGATED AUTHORITY
     In accordance with Chapter 5B of the Local Government Act 2009, Cr Stewart provided the following
     declaration to the meeting of a declarable conflict of interest in this matter:
     I, Cr Stewart inform the meeting that I have a declarable conflict of interest in this matter in relation to
     No. 9 OPW18/0155.01 in the list of applications in the report. Mr Shannon Gillard, who is related to the
     applicant CBD Settlers Cove Pty Ltd, and his wife Kate, are friends of mine through our children. We
     socialise together occasionally. Although I have a declarable conflict of interest, I do not believe a
     reasonable person could have a perception of bias because I believe the nature of our relationship is
     not close and personal and Council’s consideration of this application is not to approve or reject it, it is
     only for noting the decision that has already been made by staff. Therefore, I will choose to remain in
     the meeting room. However, I will respect the decision of the meeting on whether I can remain and
     participate in the decision.
     Cr Wilkie assumed the Chair for the purpose of Council considering the conflict of interest declaration.
     Council Resolution
     Moved:              Cr Wilkie
     Seconded:           Cr Stockwell
     That Council note the declarable conflict of interest by Cr Stewart and determine that it is in the public
     interest that Cr Stewart participates and votes on this matter because Council believes that she does
     not have a close personal relationship with Mr Gillard and therefore a reasonable person would trust
     that the final decision is made in the public interest.
                                                                                     Carried unanimously.
     (Cr Stewart did not vote on the above motion)

     Cr Stewart resumed the Chair.

     Council Resolution
     Moved:              Cr Stockwell
     Seconded:           Cr Lorentson
     That Council note the report by the Development Assessment Manager to the Planning &
     Environment Committee Meeting dated 8 December 2020 regarding planning applications that
     have been decided by delegated authority.
                                                                     Carried unanimously.



The following Recommendations from the Planning & Environment Committee were
adopted without discussion or further amendment.

Council Resolution
Moved:            Cr Stockwell
Seconded:         Cr Jurisevic
That the report of the Planning & Environment Committee dated 8 December 2020 be received and
the recommendations therein be adopted except where dealt with by separate resolution.
                                                                                      Carried unanimously.



                                                                                               Page 4 of 25

Section 5

ORDINARY MEETING MINUTES                                                 17 DECEMBER 2020


1   MCU19/0001 DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR
    COMMERCIAL BUSINESS TYPE 1- OFFICE, MULTIPLE HOUSING TYPE 4
    CONVENTIONAL AND RETAIL BUSINESS TYPE 2 - SHOP & SALON AT 6-10 DIAMOND
    STREET, COOROY
    That Planning & Environment Committee Agenda Item 1 be referred to the General Committee
    due to the significance of the issue.



2   MCU20/0090 DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE FOR
    AN EXTENSION TO SHOP/HIRE AND STORAGE BUILDING AT JETTY 256 GYMPIE
    TERRACE, NOOSAVILLE
    That Planning & Environment Committee Agenda Item 2 be referred to the General Committee
    due to the significance of the issue.



3   PLANNING & ENVIRONMENT COURT APPEAL NO 2974 OF 2020 APPLICATION FOR
    EXTENSION TO CURRENCY PERIOD 6 HERON ST, PEREGIAN BEACH
    That Council note the report by the Manager Development Assessment to the Planning &
    Environment Committee Meeting dated 8 December 2020 regarding Planning & Environment
    Court Appeal 2974 of 2020 and agree to defend the appeal.



5   NOOSA COUNCIL CARBON FOOTPRINT REPORT 2019/2020
    That Council note the report by the Project Officer Carbon Reduction to the Planning &
    Environment Committee Meeting dated 8 December 2020 that includes a calculation of the
    2019/20 Carbon Footprint for Noosa Council and its progress towards the target of net zero
    emissions by 2026 and that the CEO organise a workshop with Councillors to review planned
    initiatives with an aim to achieve Council’s stated target of zero net emissions by 2026.




                                                                               Page 5 of 25

Section 6

ORDINARY MEETING MINUTES                                                               17 DECEMBER 2020


2    SERVICES & ORGANISATION COMMITTEE MEETING REPORT – 8 DECEMBER 2020

1    NOOSA HOLIDAY PARKS FEES AND CHARGES
     In accordance with Chapter 5B of the Local Government Act 2009, Cr Stockwell provided the following
     declaration to the meeting of a declarable conflict of interest in this matter:
     I, Cr Stockwell, inform the meeting that I have a declarable conflict of interest in this matter as I am
     currently a leader with Noosa Sea Scouts and have been for nearly 15 years. I currently do not hold an
     Executive position with this organisation, but have so for a number of years up until April 2020. In the
     role of Group Leader I have previously declared an interest and left the room as Noosa Sea Scouts run
     a campground in Noosaville. However, I no longer have any involvement in the setting of campground
     fees for that organisation. Although I have a declarable conflict of interest, I do not believe a reasonable
     person could have a perception of bias because I believe my interest in the organisation currently has
     no relationship with the running of the campground activities. Therefore, I will choose to remain in the
     meeting room. However, I will respect the decision of the meeting on whether I can remain and
     participate in the decision.
     Council Resolution
     Moved:            Cr Jurisevic
     Seconded:         Cr Stewart
     That Council note the declarable conflict of interest by Cr Stockwell and determine that it is in the public
     interest that Cr Stockwell participates and votes on this matter because Council believes that Cr
     Stockwell’s role with the Noosa Sea Scouts currently does not have any involvement with the setting of
     campground fees or other campground activities and therefore a reasonable person would trust that the
     final decision is made in the public interest.
                                                                                        Carried unanimously.
     (Cr Stockwell did not vote on the above motion)

     Council Resolution
     Moved:              Cr Jurisevic
     Seconded:           Cr Wilkie
     That Council note the report by the Property Advisor – Commercial Property to the Services &
     Organisation Committee Meeting dated 8 December 2020 and:
     A.    Set fees and charges for the Noosa Holiday Parks to align with the cessation of the end
           of the July 2022 Queensland school holidays; and
     B.    Adopt the Proposed General Cost Recovery Fees and Commercial Charges schedule
           for Noosa Holiday Parks for the period ending Monday 11 July 2022 as detailed in the
           tables contained within the report.
                                                                                      Carried unanimously.

The following Recommendations from the Services & Organisation Committee were
adopted without discussion or further amendment.

Council Resolution
Moved:            Cr Jurisevic
Seconded:         Cr Wilkie
That the report of the Services & Organisation Committee dated 8 December 2020 be received and
the recommendations therein be adopted except where dealt with by separate resolution.
                                                                                      Carried unanimously.




                                                                                               Page 6 of 25

Section 7

ORDINARY MEETING MINUTES                                                    17 DECEMBER 2020


2   DEBT REFINANCING INVESTIGATION
    That Services & Organisation Committee Agenda Item 2 be referred to the General Committee
    due to the significance of the issue.


3   ORGANISATIONAL STRUCTURE
    That Council note the report by the Director Executive Services to the Services & Organisation
    Committee Meeting dated 8 December 2020 regarding the organisational structure and
    position establishment including temporary project positions.


4   2020 ANNUAL DISASTER MANAGEMENT REPORT
    That Council note the report by the Disaster Management Officer to the Services &
    Organisation Committee Meeting dated 8 December 2020 providing an update on disaster
    management activities and thank the members and advisors to the Noosa Local Disaster
    Management Group for their participation.



5   CAPITAL PROGRAM DELIVERY STATUS – NOVEMBER 2020
    That Council note the report by the Asset Planning Manager to the Services & Organisation
    Committee Meeting dated 8 December 2020 providing an update on the status of the 2020/21
    Capital Works Program to November 2020 and note the progress of the $4.6m of COVID
    recovery funding projects and maintenance activities.




                                                                                  Page 7 of 25

Section 8

ORDINARY MEETING MINUTES                                                              17 DECEMBER 2020


3   GENERAL COMMITTEE MEETING REPORT – 14 DECEMBER 2020


1   MCU19/0001 DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR
    COMMERCIAL BUSINESS TYPE 1 - OFFICE, MULTIPLE HOUSING TYPE 4
    CONVENTIONAL AND RETAIL BUSINESS TYPE 2 - SHOP & SALON AT 6 - 10 DIAMOND
    STREET, COOROY
    The following material was presented to the meeting in relation to this item:
         Cr Stockwell – refer to Attachment 1
    In accordance with Chapter 5B of the Local Government Act 2009, Cr Stewart provided the following
    declaration to the meeting of a prescribed conflict of interest in this matter:
    I, Cr Stewart inform the meeting that I have a prescribed conflict of interest in this matter as Peter Zipf,
    a director of Creekgold Pty Ltd who donated to my election campaign in March 2020, has an interest in
    this application. Mr Zipf attended the pre-lodgement meeting on behalf of the applicant. As a result of
    my conflict of interest, I will now leave the meeting room while the matter is considered and voted on.
    Cr Wilkie assumed the Chair for this item in Cr Stewart’s absence.
    Motion
    Moved:              Cr Stockwell
    Seconded:           Cr Lorentson
    That Council note the report by the Development Planner to the Planning & Environment
    Committee Meeting dated 8 December 2020 regarding Application No. MCU19/0001 for a
    Development Permit for Material Change of Use for Commercial Business - Type 1 Office,
    Multiple Housing - Type 4 Conventional (4 small dwellings), Retail Business - Type 2 Shop &
    Salon situated at 6-10 Diamond Street, Cooroy and:
    A.    Approve the application in accordance with the conditions contained in the Planning &
          Environment Committee Agenda with changes to conditions 5 and 42 and a new
          condition 63 to read as follows:
          5.     The maximum height of the development must not exceed 8 metres above the
                 finished ground level and the natural ground level except for the roof ridge of the
                 small dwellings which must not exceed 8.35m above the natural ground level as
                 shown on the approved plans.
          42.    Pedestrian and bicycle facilities must be provided within the development. The
                 works must be undertaken in accordance with an Operational Works approval and
                 must include in particular:
                 a.     A minimum 1.5 metre wide and some covered pathways within the
                        development site including a minimum of a 2m wide pathway connection to
                        Diamond Lane generally in accordance with approved plans.
                 b.     Adequate separation of all specific pedestrian routes from vehicle access
                        and manoeuvring areas, and clear demarcation by pavement marking,
                        signposts or changes in surface materials or levels.
                 c.     Signage and lighting at strategic locations to direct people to building entries
                        and public toilet facilities.
                 d.     A total of 11 bicycle parking spaces/racks and end of trip facilities complying
                        with the applicable standards and The Noosa Plan 2016.
                 Construction Management Plan
          63.    A preliminary Construction Management Plan must be submitted with the
                 Operational Works application and must address the following:
                 a.     traffic management during all aspects of the construction phase including:

                                                                                              Page 8 of 25

Section 9

ORDINARY MEETING MINUTES                                                   17 DECEMBER 2020


                 i.     a Traffic Management Control Plan in accordance with the Manual of
                        Uniform Traffic Control Devices (MUTCD) detailing all temporary
                        signage and traffic control measures prior to construction;
                 ii.    maintenance of safe pedestrian access for the areas affected by the
                        works during and after daily construction has ceased;
                 iii.   proposed fencing to the site during the construction phase of the
                        development;
                 iv.    approval of the Traffic Management Control Plan by the Department of
                        Transport and Main Roads (DTMR) for any works on State controlled
                        roads; and
                 v.     provision for worker car parking.
            b.   maintenance and protection of water quality and existing drainage lines
                 through the construction site, through the implementation of appropriate
                 erosion and sediment control measures.
            c.   works programme identifying key components of the works and their
                 respective durations.
            d.   establishment of a communication protocol with the general public, adjoining
                 owners, emergency services and local businesses to advise of agreed
                 construction times, impacts on traffic, services and other relevant issues.
            e.   a post out to the local residents and businesses prior to the pre-start meeting
                 advising of the site contact details and the potential for off-site impacts during
                 the developments construction. The post out must:
                 i.     include a copy of the architectural approved plans;
                 ii.    include plans that show any changes to the road network;
                 iii.   be distributed to all businesses and residences in the area bounded
                        by:
                             Opal Street;
                             Kauri Street;
                             Elm Street; and
                             Pearl Street.
                        Written confirmation of the post out must be submitted to Council a
                        minimum of 5 days prior to the pre-start meeting.
            f.   identification of complaint management procedures including:
                 i.     contact details for the on-site manager;
                 ii.    dispute resolution procedures.
            g.   details on the location of external fill sites/sources, the haulage route, type of
                 vehicle to be utilised during filling operations and frequency of usage. NB any
                 damage to the existing road system as a result of haulage operations shall
                 be fully repaired at the applicant’s expense;
            h.   It is acknowledged that the preliminary Construction Management Plan will
                 be a draft document requiring finalisation upon appointment of the Principal
                 Contractor employed to construct the works and a final document will be
                 required to be submitted at the Pre-Start Meeting for the project.




                                                                                  Page 9 of 25

Section 10

ORDINARY MEETING MINUTES                                                     17 DECEMBER 2020


    B.   Find the following matters relevant to the assessment and sufficient reason to approve
         the application:
         1.     The previous infrastructure use has been abandoned and given the site is
                surrounded by business centre type uses, the mixed use development is a logical
                reuse of the land.
         2.     The proposed commercial, retail and residential uses are consistent with the
                surrounding zoning and land use pattern.
         3.      The proposed development is consistent with the Noosa Plan 2020, with the site
                now zoned District Centre.
    C.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


    Amendment
    Moved:           Cr Wilkie
    Seconded:        Cr Finzel
    That condition 5 be amended to delete the words “except for the roof ridge of the small
    dwellings which must not exceed 8.35m above the natural ground level as shown on the
    approved plans“ to read:
    5.   The maximum height of the development must not exceed 8 metres above the finished
         ground level and the natural ground level.
    For:        Crs. Wegener, Finzel and Wilkie
    Against:    Crs. Stockwell, Lorentson and Jurisevic
                                              Carried on the casting vote of the Acting Chair.

    Council Resolution
    Moved:           Cr Stockwell
    Seconded:        Cr Lorentson
    That Council note the report by the Development Planner to the Planning & Environment
    Committee Meeting dated 8 December 2020 regarding Application No. MCU19/0001 for a
    Development Permit for Material Change of Use for Commercial Business - Type 1 Office,
    Multiple Housing - Type 4 Conventional (4 small dwellings), Retail Business - Type 2 Shop &
    Salon situated at 6-10 Diamond Street, Cooroy and:
    A.   Approve the application in accordance with the following conditions:
         PLANNING
                When Conditions must be Complied With
         1.     Unless otherwise stated, all conditions of this Decision Notice must be complied
                with prior to the use commencing, and then compliance maintained at all times
                while the use continues.
                Approved Plans
         2.     Development undertaken in accordance with this approval must generally comply
                with the approved plans of development. The approved plans are listed in the
                following table unless otherwise amended by these conditions.
                 Plan No.     Rev.    Plan/Document Name                               Date
                 DA02         E       Proposed Site Plan, prepared by Verve            06.10.2020
                                      Building Design Co
                 DA03         D       Building Elevations & Perspectives, prepared     06.10.2020
                                      by Verve Building Design Co

                                                                                     Page 10 of 25

Section 11

ORDINARY MEETING MINUTES                                                     17 DECEMBER 2020


               DA04          D        Building Elevations & Perspectives, prepared    06.10.2020
                                      by Verve Building Design Co
               DA05          D        Building Elevations & Perspectives, prepared    06.10.2020
                                      by Verve Building Design Co
               DA06          C        Level 1 & Roof Plan, prepared by Verve          06.10.2020
                                      Building Design Co
               1854_SQMP     Rev      Proposed development at 6-10 Diamond St -       26.08.2019
                             0.doc    Cooroy Stormwater Quality Management Plan,
                                      prepared by Callaghan and Toth
              Nature and Extent of Approved Use
        3.    The non-residential uses must not operate outside the hours of 7am to 10pm
              Monday to Sunday.
              Currency Period
        4.    The Currency Period for this development approval lapses if the use has not
              happened by 17 December 2026, unless an application to extend the currency
              period is approved by Council.
              Building Height
        5.    The maximum height of the development must not exceed 8 metres above the
              finished ground level and the natural ground level.
        6.    Certification must be submitted to Council from a Licensed Surveyor which certifies
              that the buildings do not exceed the maximum height requirement of this Decision
              Notice.
              Building Appearance
        7.    External finishes must be in accordance with that indicated on the approved plans.
              In this regard a colour palette (including roof and fence) must be submitted to
              Council for endorsement prior to the issue of an operational works approval. The
              colours must be muted environmental tones and reflect the character of Cooroy.
        8.    All air conditioning units and/or other mechanical equipment must be fully enclosed
              or screened such that they are not visible from the street frontages nor adjoining
              properties.
        9.    All deck and balcony areas above ground floor must not be enclosed by permanent
              fixtures such as shutters, louvres, glass panelling or the like, except where required
              to satisfy any privacy condition of this Decision Notice or if shown on the approved
              plans.
        10.   Each tenancy along the Diamond Street frontage must provide a minimum of 50%
              fully transparent shopfront glazing to allow passive surveillance and encourage
              social interaction.
        11.   Any security screens to the front of the premises must consist of grille or
              translucent screens and not solid shutters, screens, or roller-doors.
              Weather Protection
        12.   Street awnings must be provided for the full frontage to Diamond Street, except for
              across the driveway, as shown on the approved plans. The awning must be
              designed to provide maximum continuous solar and rain protection and promote
              all weather activity but provide opportunities for street tree planting and
              landscaping. The width of the awning must be determined in consultation with the
              Manager Development Assessment prior to the issue of the operational works
              approval. Any posts must be located to the outer most point of the awning so as
              not to impede pedestrian traffic.


                                                                                  Page 11 of 25

Section 12

ORDINARY MEETING MINUTES                                                    17 DECEMBER 2020


              Performance Bond
        13.   To secure the performance of all conditions of this approval, security in the form of
              a cash bond or trading bank guarantee to the sum of $20,000 must be submitted
              to Council a minimum of 5 days prior to pre-start meeting. The cash bond or trading
              bank guarantee will be returned on performance of the conditions of approval less
              any costs incurred by Council in respect of enforcing performance of this permit.
              Council reserves the right to call upon the bond or guaranteed sum to effect
              compliance with conditions.
              Street Identification
        14.   The street address of the development must be clearly visible and discernible from
              the primary frontage of the site by the provision of a street number and, where
              appropriate, the building name.
              Water & Sewer Connections
        15.   An underground connection to reticulated water and sewerage must be provided
              to the development site in accordance with the standards and requirements of
              Northern SEQ Distributor–Retailer Authority (Unitywater).
        16.   A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
              (Unitywater) must be submitted to Council that certifies an underground connection
              to reticulated water and sewerage has been provided to the development site.
              Community Management Statement
        17.   Any proposed Community Management Statement required for the development
              pursuant to the Body Corporate and Community Management Act 1997 must be
              submitted to Council for endorsement at the same time as submission of the
              Building Format Plan (or similar) to Council for compliance assessment.
              LANDSCAPING
        18.   The development site must be landscaped. The works must be undertaken in
              accordance with an Operational Works approval and Planning Scheme Policy PSP
              3 – Landscaping Plants and Guidelines and must include in particular:
              a.    Landscaping for the full length of both side and rear boundaries as shown on
                    the approved plans. Shade trees must be included which grow to a minimum
                    height of 8m at maturity and provided at 3m centres. The trees must have a
                    minimum pot size of 45 litres. Understory planting must be provided between
                    the shade trees to help screen the development and shade the car parking
                    area.
              b.    Two car parking spaces must be removed and replaced with landscaping.
                    Two 45 litre shade trees per replaced car space must be provided.
              c.    Each centre parking garden must be a minimum of 1.7m² and consist of 1 x
                    45 litre shade tree.
              d.    Street trees - provision of 4 x 45 litre street trees evenly spaced to the
                    western side of the driveway and 2 x 45 litre street trees to the eastern side
                    of the driveway. The existing street tree on the eastern side of the driveway
                    is in poor health and must be replaced. A plant schedule must be provided
                    for operational works.
        19.   All landscape works must be established and maintained in accordance with the
              approved design for the life of the development, and in a manner that ensures
              healthy, sustained and vigorous plant growth. All plant material must be allowed
              to grow to full form and be refurbished when its life expectancy is reached.



                                                                                  Page 12 of 25

Section 13

ORDINARY MEETING MINUTES                                                         17 DECEMBER 2020


              DEMOLITION
              Performance Bond
        20.   Security in the form of a cash bond or trading bank guarantee to the sum of $5,000
              must be submitted to Council prior to the issue of a Development Permit for
              Building Works for demolition, to secure the demolition conditions of this approval.
              The cash bond or trading bank guarantee will be returned on performance of the
              demolition conditions of this approval less any costs incurred by Council in respect
              of enforcing performance of these demolition conditions. Council reserves the right
              to call upon the bond or guaranteed sum to effect compliance with conditions.
              Works
        21.   Demolition must be undertaken in a manner that causes no detrimental effect upon
              the amenity of the neighbourhood by reason of the creation of excessive noise,
              lighting, air-borne hazards, atmospheric pollutants (including dust or odours)
              nuisance or any other emissions in accordance with the nuisance provisions of the
              Environmental Protection Act 1994.
              Waste management
        22.   A Waste Management Plan (demolition) must be submitted in accordance with
              Planning Scheme Policy 11 - Waste Management Plan and approved by Council’s
              Waste Coordinator prior to issue of a development permit for Building Works for
              demolition, removal or relocation.
              The purpose of the Waste Management Plan is to facilitate the segregation of
              waste for the effective reuse and recycling of such materials. Segregated wastes
              attract significantly reduced disposal fees at the landfill with some items free.
              Higher gate fees are charged for mixed waste.
              Waste storage areas must provide for adequate separation of all reusable,
              recyclable and waste materials. These must be located so that they are convenient
              and safe to use.
              The Plan must contain the following information:
              a.   The areas for the storage and separation of waste shown on a site plan;
              b.   A waste management table as indicated below is to be completed showing
                   how waste material is to be segregated - recycled – reused or disposed; and
              c.   Table – Waste Management Table
                      MATERIALS ON-SITE                                     DESTINATION
                                                                Re-use and Recycling         Disposal
                      Expected waste           Estimated    On-site        Off-site     *specify
                      materials                volume(m³)   *specify       *specify     contractor and
                                                            proposed re- contractor and landfill site or
                                                            use or on-     recycling    other disposal
                                                            site recycling outlet       site
                                                            methods
                      Excavation material
                      Green waste
                      Bricks
                      Concrete
                      Timber-please specify
                      Plasterboard
                      Metals - please
                      specify
                      Asbestos
                      Other - please specify
                   Note * If a demolition contractor is undertaking works, then the Waste Management
                   table is to be completed by the demolition contractor.


                                                                                       Page 13 of 25

Section 14

ORDINARY MEETING MINUTES                                                    17 DECEMBER 2020


              Damage to infrastructure
        23.   Any damage to footpaths, street plantings, natural vegetation/trees kerb and
              channel, bridges or roadways must be repaired or reinstated to at least pre-existing
              conditions.
              Vacant site
        24.   The site must be left clean and tidy free from debris such as concrete, wire, rubble,
              brick/s and the like. If the site remains vacant for more than 30 days the lot/s must
              be turfed or landscaped in accordance with Planning Scheme Policy PSP 3 –
              Landscaping Plants and Guidelines and to the satisfaction of Council so as to not
              cause nuisance to the surrounding area.
        25.   All waste materials must be removed from site.
              Litter, erosion and sediment control
        26.   Litter, erosion and sediment control measures must be installed and maintained
              until soils are stabilised by turf, vegetation or sealed.
              Note: it is an offence under the Environmental Protection Act 1994 to deposit or
              potentially allow litter, waste, soil, or other contaminants to enter a waterway or
              storm water drainage system (e.g. roadside gutter).
              Asbestos
        27.   Removal of building materials containing asbestos must be undertaken by a
              licensed asbestos removalist.
        28.   Asbestos removal work (Section 466) of the Work Health and Safety Regulation
              2011 requires a licensed asbestos removalist to give notice to Workplace Health
              and Safety Queensland (WHSQ) of licensed asbestos removal work at least five
              days before the work commences. Notification must be made using Form 65:
              Notification of licensed asbestos removal work, demolition work or emergency
              demolition.
        29.   All building materials containing asbestos products are wrapped and disposed of
              in accordance with the Public Health Regulation 2006 and the Environmental
              Protection Regulation 2008.
              Note: Asbestos is a Regulated Waste. The Department of Environment & Science
              licenses businesses that transport asbestos waste, and landfills that accept this
              waste.
        30.   All building materials containing asbestos, including asbestos cement sheeting or
              roofing and lagging are removed from the building prior to demolition/relocation.
              Plumbing and Drainage
        31.   It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that
              at demolition of a building, the existing sanitary drain upstream from the connection
              point for a service provider’s sewerage system must be sealed water tight. This
              work is deemed as notifiable Work and must be carried out by a suitably licenced
              plumber who must submit an As Constructed plan and Form 4 (Notifiable Works
              Form) to the QBCC (Queensland Building Construction Commission) within 10
              days of completing the work.
        ENGINEERING
              External Works
        32.   Diamond Street must be upgraded for the length of its frontage to the subject site.
              The works must be undertaken in accordance with an Operational Works approval
              and must include in particular:

                                                                                  Page 14 of 25

Section 15

ORDINARY MEETING MINUTES                                                   17 DECEMBER 2020


              a.   Construction of a pedestrian footpath in accordance with the conditions of
                   this Decision Notice.
              b.   Removal of any redundant property accesses and reinstatement of the kerb,
                   footpath and verge area to match the balance of the site frontage.
              c.   Any required stormwater drainage works within the road reserve in
                   accordance the conditions of this Decision Notice.
              d.   Any required road pavement correction due to the development works.
              e.   Relocation, and line marking of existing on-street parking spaces in
                   accordance with the requirements of the Referral Agency and the conditions
                   of this Decision Notice.
              f.   The required relocation of the existing power pole.
              g.   Any required alteration or adjustment to existing public services due to the
                   proposed works.
        33.   Additional external roadworks as may be required by Department of Transport and
              Main Roads approval reference 1901-9327 SRA.
              Site Access and Driveways
        34.   A sealed access driveway must be provided to all parking and manoeuvring areas
              of the development generally in accordance with approved plans. The works must
              be undertaken in compliance with an Operational Works approval and the
              applicable requirements of the relevant utility provider/s, and must include in
              particular:
              a.   A driveway crossover generally in accordance with the approved plans,
                   standard drawing RS-051 and with an overall maximum width of 6.5m at the
                   property boundary.
        35.   Approval from the Department of Transport and Main Roads for the final design of
              the site access and driveway works must be submitted in writing to Council prior to
              the issue of any Development Permit for Operational Works by Council.
              Car Parking
        36.   A minimum of 42 car parking spaces and 4 motor cycle spaces must be provided
              and signage and marked on the site generally in accordance with the approved
              plans and AS/NZS 2890.01, and made available and accessible at all times while
              the use is open for business. The works must be undertaken in accordance with
              an Operational Works approval and must include in particular:
              a.   4 covered parking spaces for the residential units within the total, which are
                   clearly marked for this purpose
              b.   Pedestrian routes within the development site generally in accordance with
                   the conditions of this permit and further details and levels for the pedestrian
                   access to Diamond Lane.
              c.   4 motorcycle spaces.
              d.   Provision of vandal resistant public lighting with intensities to satisfy the
                   requirements of Australian Standard AS1158: Public Lighting Code.
              e.   Linemarking, crossfalls and gradients in accordance with Australian
                   Standard AS/NZS 2890.01: Parking Facilities
        37.   All car parking areas and access driveways must be maintained exclusively for
              vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.



                                                                                 Page 15 of 25

Section 16

ORDINARY MEETING MINUTES                                                    17 DECEMBER 2020


        38.   Directional signage must be provided to direct customers and drivers to the car
              parking spaces provided on site.
              On Street Carparking
        39.   On street carparking along the frontage of the site must be provided with signage
              and linemarking in compliance Australian Standard AS/NZS 2890.01. The works
              must be endorsed by the Department of Transport and Main Roads and
              undertaken in accordance with an Operational Works approval.
              Service Vehicles
        40.   Service vehicle parking, manoeuvring and standing spaces must be provided on
              the site. The works must be undertaken generally in accordance with the approved
              plans and an Operational Works approval. and must include in particular:
              a.   Manoeuvring for Council contractors waste collection vehicle.
              b.   1 SRV space.
              Pedestrian and Bicycle Facilities
        41.   Public pedestrian pathway must be provided for the development. The works must
              be undertaken in accordance with an Operational Works approval and must
              include in particular:
              a.   Concrete footpath for the entire length of the site’s frontage to Diamond
                   Street. The width of the footpath must be determined in consultation with a
                   Council Manager Development Assessment prior to the issue of the
                   operational works approval. The width of the footpath must provide for safe
                   pedestrian traffic and street tree planting and landscaping.
              This condition is imposed pursuant to s128 of the Planning Act 2016 being
              necessary trunk infrastructure identified by Council’s LGIP to service the
              development.
        42.   Pedestrian and bicycle facilities must be provided within the development. The
              works must be undertaken in accordance with an Operational Works approval and
              must include in particular:
              a.   A minimum 1.5 metre wide and some covered pathways within the
                   development site including a minimum of a 2m wide pathway connection to
                   Diamond Lane generally in accordance with approved plans.
              b.   Adequate separation of all specific pedestrian routes from vehicle access
                   and manoeuvring areas, and clear demarcation by pavement marking,
                   signposts or changes in surface materials or levels.
              c.   Signage and lighting at strategic locations to direct people to building entries
                   and public toilet facilities.
              d.   A total of 11 bicycle parking spaces/racks and end of trip facilities complying
                   with the applicable standards and The Noosa Plan 2016.
              Easements
        43.   A 1.5 metre wide easement for “Public Thoroughfare” purposes must be registered
              against the title of the property in favour of Council. The easement must be located
              directly adjacent to the Diamond Lane frontage. The easement must:
              a.   be clearly shown on all plans submitted for Operational Works; and
              b.   be registered prior to the commencement of the use.




                                                                                 Page 16 of 25

Section 17

ORDINARY MEETING MINUTES                                                   17 DECEMBER 2020


        44.   Unless otherwise agreed in writing by the relevant service provider, any public or
              third party infrastructure located on the subject site must be placed within an
              easement registered against the title of the property.
        45.   All easements must be designed in accordance with the planning scheme and
              granted at no cost to the Grantee. Where the Grantee is Council or a service
              authority, the easement documentation must be in accordance with the Grantee’s
              standard easement terms. Draft easement documentation must be submitted to
              Council for endorsement.
        46.   All works must be kept clear of any existing or proposed easements on the subject
              land, unless agreed otherwise in writing by the Grantee.
              ENVIRONMENTAL HEALTH
              Amenity
        47.   The development must be undertaken and operated in a manner that causes no
              detrimental effect upon the amenity of the neighbourhood by reason of the creation
              of excessive noise, lighting, air-borne hazards, atmospheric pollutants (including
              dust or odours) nuisance or any other emissions in accordance with the nuisance
              provisions of the Environmental Protection Act 1994.
              Noise Nuisance
        48.   Noise emission from mechanical equipment must comply with the following
              requirements:
              a.    Air-conditioning, refrigeration, fans including mechanical exhaust
                    fans/ventilation, plant rooms and refuse compactors:
                        7am to 10pm: Maximum background + 5dB(A)
                        10pm to 7am: Maximum background + 3dB(A)
        49.   Submission of written certification from a suitably qualified person confirming that
              the noise levels from all mechanical equipment comply with the noise requirements
              of this Decision Notice when measured at either the residential boundary or outside
              the most exposed part of an affected building, whichever is the closest to the
              equipment.
              The assessment and certification is required immediately after installation of the
              equipment and prior to any occupation of the building, and in a format approved by
              Council. All equipment should be operating at the same time to test the overall
              noise level created.
              Waste Storage & Disposal
        50.   The developer must provide waste storage and disposal facilities in accordance
              with Planning Scheme Policy 9 - Waste Management, including an external
              imperviously paved area correctly sized for all refuse and recycling containers and
              suitably screened from public places and neighbouring properties. The waste
              storage areas must be indicated on the plans and submitted with an operational
              works approval.
        51.   Separate waste storage facilities must be provided for the residential use onsite.
        52.   Waste collection services are limited to between 6.30am and 6.30pm Monday to
              Saturday and not permitted on Sunday or public holidays.
        53.   Service vehicle movements associated with the approved use (including loading
              and unloading) must not occur outside the hours of 7am to 6pm Monday to
              Saturday and not at all on Sundays or public holidays. The requirements of this
              condition must be included in the Community Management Statement for any body
              corporate for the subject site.

                                                                                 Page 17 of 25

Section 18

ORDINARY MEETING MINUTES                                                  17 DECEMBER 2020


              HYDROLOGY
              Stormwater Drainage
        54.   The site must be provided with a stormwater drainage system connecting to a
              lawful point of discharge. The works must be undertaken in accordance with an
              Operational Works approval.
        55.   A primary stormwater quality treatment system must be provided for the
              development for the effective removal of gross pollutants. The works must be
              undertaken in accordance with an Operational Works approval.
        56.   All primary stormwater quality treatment devices must be routinely checked,
              serviced and cleaned in accordance with the manufacturer’s recommendations.
              Records of all maintenance activities undertaken must be kept and made available
              to Council upon request.
        57.   A stormwater quality treatment system must be provided for the development. The
              works must be undertaken in accordance with an Operational Works approval and
              the Bioretention Technical Design Guidelines (Water by Design, 2012), and must
              include in particular stormwater quality treatment devices of a size and location
              generally in accordance with the approved Stormwater quality management plan
              ver 0, prepared by Callahan and Toth, with the exception of the following:
              a.   The Operational Works application must include an amended drainage
                   design, consistent with an updated MUSIC model that demonstrates that
                   drainage from Catchment A1, C and B1 are filtered through a vegetated
                   system, in lieu of the proposed GPT, to achieve the overall same reduction
                   in pollutants prior to release to stormwater; and
              b.   Demonstrate required amendments to the Stormwater Quality treatment train
                   continues to achieve overall development pollution reduction targets of 80%
                   reduction in Total Suspended Solids, 60% Reduction in Total Phosphorous
                   and 45% reduction in Total Nitrogen compared to pre-development scenario,
                   and that the peak 1-year ARI event discharge remains within pre-
                   development peak 1-year ARI discharge.
        58.   All stormwater quality treatment devices must be maintained in accordance with
              the Water by Design (2009) - Maintaining Vegetated Stormwater Assets (Version
              1). A copy of this document must be retained on the site together with the approved
              Operational Works drawings for the stormwater quality treatment system and a
              detailed life cycle costing of the system attached as an addendum. Records of all
              maintenance activities undertaken must be kept and made available to Council
              upon request.
        59.   Any proposed Community Management Statement required for the development
              must include the Water by Design (2009) – Maintaining Vegetated Stormwater
              Assets (Version 1) document and must include the full cost of maintaining the
              system in accordance with that document.
        60.   All water quality treatment features must include signage that states “This
              stormwater Quality Feature reduces nutrients flowing to Mary River, which drains
              to the Great Barrier Reef.” The application for Operational Works must include
              signage design and demonstrates how it is consistent with Noosa Design
              Principles.
              Stormwater Harvesting
        61.   Operating rainwater collection and harvesting tanks must be provided as shown in
              Section 4.2.2 and Section 5 of the Stormwater Quality Management Plan version
              0 prepared by Callahan and Toth and dated August 2019. The tanks must be
              provided in accordance with a Building Works approval.

                                                                                Page 18 of 25

Section 19

ORDINARY MEETING MINUTES                                                     17 DECEMBER 2020


        62.   Operating stormwater harvesting tanks must be provided for the development. The
              tanks must be provided in accordance with approved plans and must include
              capacity, catchment, distribution and reuse as detailed in Section 4.2.2 and Section
              5 of the approved Stormwater Quality Management Plan version 0, prepared by
              Callahan and Toth and dated August 2019.
              Construction Management Plan
        63.   A preliminary Construction Management Plan must be submitted with the
              Operational Works application and must address the following:
              a.   traffic management during all aspects of the construction phase including:
                   i.     a Traffic Management Control Plan in accordance with the Manual of
                          Uniform Traffic Control Devices (MUTCD) detailing all temporary
                          signage and traffic control measures prior to construction;
                   ii.    maintenance of safe pedestrian access for the areas affected by the
                          works during and after daily construction has ceased;
                   iii.   proposed fencing to the site during the construction phase of the
                          development;
                   iv.    approval of the Traffic Management Control Plan by the Department of
                          Transport and Main Roads (DTMR) for any works on State controlled
                          roads; and
                   v.     provision for worker car parking.
              b.   maintenance and protection of water quality and existing drainage lines
                   through the construction site, through the implementation of appropriate
                   erosion and sediment control measures.
              c.   works programme identifying key components of the works and their
                   respective durations.
              d.   establishment of a communication protocol with the general public, adjoining
                   owners, emergency services and local businesses to advise of agreed
                   construction times, impacts on traffic, services and other relevant issues.
              e.   a post out to the local residents and businesses prior to the pre-start meeting
                   advising of the site contact details and the potential for off-site impacts during
                   the developments construction. The post out must:
                   i.     include a copy of the architectural approved plans;
                   ii.    include plans that show any changes to the road network;
                   iii.   be distributed to all businesses and residences in the area bounded
                          by:
                               Opal Street;
                               Kauri Street;
                               Elm Street; and
                               Pearl Street.
                          Written confirmation of the post out must be submitted to Council a
                          minimum of 5 days prior to the pre-start meeting.
              f.   identification of complaint management procedures including:
                   i.     contact details for the on-site manager;
                   ii.    dispute resolution procedures.



                                                                                   Page 19 of 25

Section 20

ORDINARY MEETING MINUTES                                                               17 DECEMBER 2020


                 g.     details on the location of external fill sites/sources, the haulage route, type of
                        vehicle to be utilised during filling operations and frequency of usage. NB any
                        damage to the existing road system as a result of haulage operations shall
                        be fully repaired at the applicant’s expense;
                 h.     It is acknowledged that the preliminary Construction Management Plan will
                        be a draft document requiring finalisation upon appointment of the Principal
                        Contractor employed to construct the works and a final document will be
                        required to be submitted at the Pre-Start Meeting for the project.
    B.    Find the following matters relevant to the assessment and sufficient reason to approve
          the application:
          1.     The previous infrastructure use has been abandoned and given the site is
                 surrounded by business centre type uses, the mixed use development is a logical
                 reuse of the land.
          2.     The proposed commercial, retail and residential uses are consistent with the
                 surrounding zoning and land use pattern.
          3.      The proposed development is consistent with the Noosa Plan 2020, with the site
                 now zoned District Centre.
    C.    Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
                                                                                     Carried unanimously.
    Cr Stewart re-joined the meeting and resumed the Chair.



4   TOURISM NOOSA EXEMPTION REQUEST FOR THE PROVISION OF ALCOHOL FOR
    TEMPORARY EVENTS DURING COVID-19 PANDEMIC
    In accordance with Chapter 5B of the Local Government Act 2009, Cr Stewart provided the following
    declaration to the meeting of a prescribed conflict of interest in this matter:
    I, Cr Stewart inform the meeting that I have a prescribed conflict of interest in this matter as I am a Board
    Director of Youngcare, who are the beneficiary of the funds raised from the “Youngcare Long Lunch”
    event for which Tourism Noosa are applying for an exemption request. As a result of my conflict of
    interest, I will leave the meeting room while the matter is considered and voted on.
    Cr Wilkie assumed the Chair for this item in Cr Stewart’s absence.
    Council Resolution
    Moved:              Cr Stockwell
    Seconded:           Cr Jurisevic
    That Council note the report by the Property Manager to the General Committee Meeting dated
    14 December 2020 and:
    A.    Approve Tourism Noosa’s exemption request for the provision of alcohol at the Eat &
          Drink / Youngcare Long Lunch event and the Eat & Drink Sumptuous High Tea Soiree
          event; and
    B.    Authorise the CEO to assess both temporary event applications once each application
          is properly made and Council has received all the required information to undertake its
          assessment in accordance with Council’s normal permit application and approval
          process.
                                                                                     Carried unanimously.
    Cr Stewart re-joined the meeting and resumed the Chair.




                                                                                              Page 20 of 25

Section 21

ORDINARY MEETING MINUTES                                                         17 DECEMBER 2020


The following Recommendations from the General Committee were adopted without
discussion or further amendment.

Council Resolution
Moved:            Cr Wilkie
Seconded:         Cr Stewart
That the report of the General Committee dated 14 December 2020 be received and the
recommendations therein be adopted except where dealt with by separate resolution.
                                                                               Carried unanimously.



2    MCU20/0090 DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE FOR
     AN EXTENSION TO SHOP/HIRE AND STORAGE BUILDING AT JETTY 256 GYMPIE
     TERRACE, NOOSAVILLE
     That Council note the report by the Development Planner to the Planning & Environment
     Committee meeting dated 8 December 2020 regarding Application No. MCU20/0090 for a
     Development Permit for Material Change of Use – extension to shop/hire and storage building,
     situated at Jetty 256 Gympie Terrace, Noosaville, and:
     A.     Refuse the application for the following reasons:
            1.    The proposal is contrary to Overall Outcome (ad) and Performance Outcomes
                  PO22 and PO23 of the Noosaville Local Plan Code as the proposal will result in
                  increased commercial development on and adjacent the Noosa River and lead to
                  the business operating outside their lease area.
            2.    The proposal is contrary to Overall Outcome (b) and Performance Outcome PO2
                  of the Waterways Works Code as the proposal will result in an increase in gross
                  floor area and an increase to the scale and intensity of commercial operations on
                  the Noosa River.
            3.    The business already exceeds the operational capacity of the lease area, as
                  evidenced by the site’s compliance history, and increasing the enclosed storage
                  space supports the continued operation of the business at a scale and intensity
                  that is not consistent and/or compatible with the designated lease area.
     B.     Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
     C.     Request staff to meet with the applicant to discuss temporary alternative solutions to
            storage and staff safety issues due to the COVID-19 restriction requirements.



3    DEBT REFINANCING INVESTIGATION
     That Council note the report by the Director Corporate Services to the Services & Organisation
     Committee Meeting dated 8 December 2020 and:
     A.     Agree in principle to the 20 year fixed interest refinancing of Council’s current total debt
            balance at the latest applicable QTC borrowing rate;
     B.     Agree to recapitalise the early repayment adjustment through the refinancing transaction
            to ensure cash reserves are maintained; and
     C.     Authorise the Chief Executive Officer to submit an application by 26 February 2021 to
            the Department of State Development, Infrastructure, Local Government and Planning
            seeking borrowing approval for the refinancing transaction.


                                                                                       Page 21 of 25

Section 22

ORDINARY MEETING MINUTES                                                   17 DECEMBER 2020


5   FINANCIAL PERFORMANCE REPORT – NOVEMBER 2020
    That Council note the report by the Manager Financial Services to the General Committee
    Meeting dated 14 December 2020 outlining November 2020 year to date financial performance
    against budget, including performance against key financial sustainability indicators.



6   BUDGET REVIEW 2 (BR2)
    That Council note the report by the Manager Financial Services to the General Committee
    Meeting dated 14 December 2020 and approve the proposed changes to the budget for the
    2020/21 financial year as outlined in the revised Budget Financial Statements attached to the
    report.




                                                                                Page 22 of 25

Section 23

ORDINARY MEETING MINUTES                                                           17 DECEMBER 2020


9    ORDINARY MEETING REPORTS


     1      KIN KIN QUARRY – POTENTIAL LEGAL ACTION
            Council Resolution
            Moved:             Cr Stewart
            Seconded:          Cr Wilkie
            That Council note the report by the Chief Executive Officer to the Ordinary Meeting dated
            17 December 2020 and:
            A.    Note the confidential legal advice in relation to the operation of the Kin Kin Quarry
                  provided as Attachment 2 to the report;
            B.    Authorise the Chief Executive Officer to initiate legal action in accordance with that
                  advice and to work with Council’s legal advisers in gathering the necessary
                  evidence prior to initiating that legal action.
                                                                                 Carried unanimously.




10   CLOSED SESSION

     Nil.




11   PUBLIC QUESTION TIME

     1      BRIAN O’CONNOR
            Question 1:
            Noosa Council is part of a troika that is working with HQ Plantations on a $3.5 million
            conservation deal to convert 2400ha of Yurol Forest and Ringtail Forest, currently the
            site of plantation timber harvesting operations, into National Park; and so I ask what
            plans exist for the rehabilitation of cleared areas of forest either side of Yurol Forest Drive
            between Pomona and Cooroy. Will these lands become replanted koala habitat or will
            they form part of the Noosa Trails Masterplan upgrade proposal?

            Response by Brett de Chastel, Chief Executive Officer:
            As you have pointed out in your question, this land will become National Park once the
            existing pine forest and some hardwood areas have had their final harvesting
            completed. As such, the land will be protected for future generations for their enjoyment
            and use as National Park. There are over 23 protected/endangered species in this area
            including the iconic koala. As you are aware, part of the Noosa Trail already passes
            through this land and the Noosa Trail Masterplan envisages that to continue. All of our
            discussions with Queensland Parks and Wildlife Service has indicated support for those
            trails to continue to be used through the proposed National Park area both in the short
            and long term.




                                                                                         Page 23 of 25

Section 24

ORDINARY MEETING MINUTES                                                       17 DECEMBER 2020


          Question 2:
          Has Noosa Council given thought to using the opportunity of converting Yurol State
          Forest and Ringtail State Forest into National Park to reserve a small parcel of that land
          for affordable housing for Indigenous First Nations People whose ancestors walked that
          land and whose descendants today have traditional ownership heritage and a lasting
          and ongoing relationship with these forests?

          Response by Brett de Chastel, Chief Executive Officer:
          No - there are no current plans to excise any of the land for housing. Under the existing
          agreements, all of the land will be converted into National Park over the next 3 to 7 years.
          However, we have been working closely with the local Kabi Kabi leaders on this project
          over the last 18 months. This includes looking at opportunities to engage with the Kabi
          Kabi on regeneration activities, fire management and cultural heritage site reviews. The
          Kabi Kabi are very supportive of this project and are keen to be involved in the next
          stages of this project. All parties to the existing agreements are also supportive of the
          Kabi Kabi being involved in future stages of this project




12   NEXT MEETING

     The next Ordinary Meeting will be held on 21 January 2021 at the Council Chambers, 9 Pelican
     Street, Tewantin commencing at 5pm.




13   MEETING CLOSURE

     The meeting closed at 6.11pm.




                                                                                    Page 24 of 25

Section 25

ORDINARY MEETING MINUTES   17 DECEMBER 2020


                              ATTACHMENT 1




                                Page 25 of 25

ORDINARY MEETING MINUTES                                                                                         17 DECEMBER 2020

                                                                                                                    ATTACHMENT 1

                                                                                                 vy
                                  oe                                                     ( (Za
                                                                                              F 1 HATCHED AREA SHOWS
              :                                                     ~\ S          |      7 “
              “ANIM                TMM TTT             TTT TTT                er       LS
                   4                                                 aN                MAI TM                       1
               ||| =                   SITE BOUNDARY                           U     fe \            =     WITT
                  on               a= -- = NM - --       A      ch----9f     sire entry’ ff oy} \   il            Jf
                   || ||) |] ame af ane rane’) | ||] mS || 0) 1) || || ee                  all                   Z
                 120° FALL Se eh   ane rane WE aoe rae EL ae FALL     12° FALL       12° FALL
                 PUNT 1 2) unt 2,5)          Nun 33 7 UNIT 4                 |    I                   Hop
               :    FmIllll=        De          eel     =       \     |                         (CONVENIENCE STORE)
                 at         “a                           7         re
                 | STAIR |     SS                         ==
                 aoa                            Ui                |
                             .                   BQ)              —                               ASS.               |
                                    OLORBOND ROOF &                                             ml         -
                     .              GUTTERS TYPICAL   —                                       Al         ST
             zs     5° FALL                                                                =i                    Y)    =
             2                                        <=                                  7               Af f/f fa
             3| | CARPORT                                                            t              —     | JA JANN
             re                        f                                °\              See               IY I J       V8
                                      |                                                            OLY)
                                      |                                  j                         Ee,
                                  J  |  ———                              |           co            | Af Af AL. VA,
                                                                                                                       Page 25 of 25

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.