Decision Letter - Change to an Existing Approval [As Published] · 132005.390.02
2005/390 Page 13 of 16 [OCR of page images] 2005/390 IDAS C-6 © considered unwarranted by a UXO contractor due to the extent of any prior excavation or earthworks or, conversely, of any fillmg proposed as part of the development program, or © prevented or made impracticable by the presence of a structure, stockpile, natural barner or metal waste. In the latter case, alternative action may be appropnate to minimuse the risk in the first mstance For example, where the nsk of exposure to any UXO that may exist 1s reduced by the presence of a structure or natural barrier, issuance of the standard UXO wamung (see Condition 4.2) may suffice while the structure, stockpile or barner remains in place Where a structure is to be removed or teduced as part of the development program, protective precautions, commensurate with any greater tisk to which workers might then be exposed, may need to be considered Progressive assessment will be necessary where such circumstances exist. Uniess, at the completion of prelummary works, there 1s evidence then available to the UXO contractor that any residual nsk 1s neghgyble, the use of detection equipment will typically be required to confirm the site’s status Where investigation, along with any subsequent remedial action and assessment, 15 to be implemented by stages to satisfy Condition 4 1 and 4.3, a preliminary investigation report should be submitted by the applicant to the EPA along with a management plan for the proposed work Staged investi gation/remedhation 1s most likely to be applicable where development of smaller, built-on lots (which can present circumstances such as those discussed above) or broadhectare sites is proposed In such cases, the EPA’s assessment of the report and advice to Council in regard to approval of the development will be dependent on agreement with the management plan Where Condition 4 1 1s to be satisfied by a whole lot or broadhectare development stage being subjected to mvestigahon and any necessary remedial action, the EPA, based on the subsequent investigation/remediation report’s findings and recommendation/s, may reassess the lot, or that portion comprising the development stage, as bemg remediated or not needmg remediation, and advise the applicant and Council accordingly. Otherwise, any balance of land that has not been further imvestigated will retam the nsk assessment made by Defence. This 1s unless evidence obtained from the investigated part/s can be used to refute Defence’s assessment in regard to all or part of the balance. In the latter case, the EPA may reassess all of the balance or the applicable part/s as being unaffected by UXO. 6 Additioval information This concurrence response applies only to contammated land issues and does not remove the need to obtain any further approval for this development which may be required by this or other legislation, State and/or Commonwealth. Applicants are advised to check with all relevant statutory authorities. Applicants should also comply with all relevant legislation. The EPA has not provided a notification to native ttle parties for this application The State’s Native Title Work Procedures indicate that the responsibility for assessment of native title issues for an IDAS application rests with the Assessment Manager It 1s recommended that the Assessment Manager determmes whether native title notification 1s required for this application. *End of response* IDAS C-6 CLM VER2 Page 13 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 299 KB (small file)
- File type
No other editions are linked here.