Decision Letter - Change to an Existing Approval [As Published] · 132005.390.02
2005/390
In the event that the Development Permit for Material Change of Use of Premises lapses or is
cancelled, the contribution or trading bank guarantee will be returned
Earthworks & Site Stability
41. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences or structures that border the development site. Fences that are affected shall be
replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard
any fences to be replaced shall be clearly shown on the plans submitted for Operational
Works approval.
42. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification, establish whether any measures are required to protect the
stability of adjoining buildings and/or structures, and make recommendations on the type of
foundation system(s) best suited for the proposed development. The recommendations of this
report are to be incorporated into the design and construction of the proposed development.
Erosion and Sediment Control
43. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
General
44. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works, which shall be submitted in conjunction with an
application for a Development Permit for Operational Works.
45. Digital detailed design drawings and calculations shall be submitted with any application for a
Development Permit for Operational Works in respect of roadworks and stormwater drainage
works. To avoid conflict with underground pipes or services, all existing and proposed
services required by the development shall be shown on the plans.
46. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
47. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
48. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Environmental Health
49. The developer must provide a suitably external screened imperviously paved area large
enough for all refuse and recycling containers.
50. Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or
located in a manner which prevents a noise nuisance beyond the subject land in accordance
with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot
fines apply for such offences.
51. Noise emission from air conditioning and swimming pool equipment shall comply with the
following requirements:
Page 6 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 299 KB (small file)
- File type
No other editions are linked here.