Original source · versioned page text
Attachment 4 - Officer Report Dated 12 September 2023
The original of this document is very large (71.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 37, section 1. The text section number identifies this passage in the reader.
CABIN INTERIOR CABIN INTERIOR
COMMUNAL AREA TYPICAL VILLAGE PERSPECTIVE
CLD-1 CLD-2 FN-1 BAL-1 RN-1 / PF-1 SCR-1 SCR-2
Composite Timber Horizontal Timber Fence Galvanised Steel Render / Paint Timber Louvre Timber Batten
Cladding Weatherboard Balustrade Finish (White) Window Screening Screen
(White)
Revision Project Architect Stage Project No.
01 Development Approval 25/08/2022 CYC Noosa Campsite CG DEVELOPMENT APPROVAL 1302-01 Materials and Finishes Scheme
48 Kabi Road Cootharaba QLD
Client
Christian Youth Council
Drawn
CG/MB
Status
PRE-CONSTRUCTION (NOT FOR CONSTRUCTION)
Scale
at A1 A-DA-01.06 01
Revision
(07) 3251 6900 [email protected] Elevation Architecture Pty Ltd ACN 606 170 807 © Copyright reserved this document is and shall remain the property of Elevation Architecture. Unauthorised use of this document in any form whatsoever is prohibited. All information to be printed in colour. Figured dimensions take precedence over scale dimensions. Contractors must verify all dimensions on site before commencing any work or making shop drawings. P:\Data 1\1302-01 CYC Noosa Campsite\5.2 Development Application\5.2.1 ArchiCAD\1302-01_Master DA 24.pln
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.