Attachment 4 - Officer Report Dated 12 September 2023
Very large file (71.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 51, section 1. The text section number identifies this passage in the reader.
10
10
2a-M SITE PLAN
2a-L
2a-K BDY Boundary
C1 Structural Column
2a-J C2 Structural Column
2a-I 2a-1
CIV-A Civil Asphalt
2a-A 2a-A 2a-C 2a-D 2a-E 2a-F 2a-G 2a-H existing natural ground under CIV-C Civil Conrete
suspended dormitory CIV-G Civil Gravel
existing natural ground under CONC Concrete
11 suspended dormitory FBC Fire Booster Cabinet
FN-1 Fence type
RW under verandah 11 GP Grated Pit
2a-1 fromnatural ground line to HR-1 Handrail
Suspended Lower Dormitory new verandah height SMH Sewer Manhole
Building at RL 12.780 RL Reduced Level
RWO Rain Water Outlet
Suspended Lower Dormitory 2a-2 12 SCR Screen Type 1
SW StormWater
Building at RL 12.780 SWP Stormwater Pit
TOW Top of Wall
r LRO Line of Roof Over
RW unde
Suspended Verandah WS Wheelstop
at RL 12.750
2a-2
Suspended Verandah
at RL 12.750 RW under 2a-M
12.780 2a-L
UP Ramp up Fire pit zone
ground 12.729 1:14
UP 2a-K at approx. RL 12.64
L'Scape
12 L'Scape 2a-J
Ramp up TOW13.279
1:14 2a-I
Pathway RW
2a-A 2a-A 2a-C 2a-D at RL 13.970
13
2D-1 2D-1 TOW12.687
RW
11
14
13
12
10
9
8
7
6
5
4
3
2
1
Flat playing area at approx.
RL 12.80 with small gradient
Grade playing field to meet 14
existing ground contours at
for rainwater runoff
extent shown
Batter playing field to
natural ground
at RL 13.970
13
Pathway
Flat playing area with small
Dining Building gradient for rainwater runoff
Pathway
at RL 13.970 at RL 14.00
15
Fire pit zone
at approx. RL 13.92
tation
14
g vege
existin
2b-K
2b-J
2b-I
2b-H
13.972 2b-G
2D-2 2D-2
2b-F 2b-1
UP
TOW15.435
UP 13.960
1
Ramp up
1:14
Pathway 16
at RL 15.250
2
3
4
CIV-C
5
6 L'Scape
1
2
3
4
5
6
7
7
15.250 Pathway 2D-B
15 at RL 15.250
2b-1
Dormitory Building
at RL 15.280
RW
L'Scape
Dormitory Building 2b-2
at RL 15.280
RW
Pathway up
L'Scape
1:20
2b-1 2b-K
2b-J
L'Scape L'Scape
RW 2b-I
RW 2b-H
SITE KEY Pathway up
1:20 CIV-C
15.777
Drop off/
hot box delivery
2b-F
2b-G
16 Pick up Area
L'Scape
Bin Area
Enclosure
SITE KEY LEGEND Bus Park
CIV-A
CA Communal Area
2
1
3
4
5
V1 Village 1
2
1
3
V2 Village 2 2-A 2b-B 2b-C 2b-D 2b-E
V3 Village 3
5
4
6
8
9
4
3
7
6
2
1
1
50
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
2
3
1
CIV-G
V1 2134567
213 2134756 Dirt/Gravel Surface
16 0
1
9
8
572
34
111789021354678
4
3
12
to accomdate 14 car spaces
456
CA
1234567
V2
3124567
12
3
17
2
1
V3
Revision Project Architect Stage Project No.
01 For Coordination 7/07/2022 CYC Noosa Campsite GA DEVELOPMENT APPLICATION 1302-01 Site Plan - Village 2
02 Development Approval 25/08/2022 48 Kabi Road Cootharaba QLD
Client
Christian Youth Council
Drawn
CG/MB
Status
PRE-CONSTRUCTION (NOT FOR CONSTRUCTION)
Scale
1:200 at A1 A-DA-V2-01.03 02
(07) 3251 6900 [email protected] Elevation Architecture Pty Ltd ACN 606 170 807 © Copyright reserved this document is and shall remain the property of Elevation Architecture. Unauthorised use of this document in any form whatsoever is prohibited. All information to be printed in colour. Figured dimensions take precedence over scale dimensions. Contractors must verify all dimensions on site before commencing any work or making shop drawings. P:\Data 1\1302-01 CYC Noosa Campsite\5.2 Development Application\5.2.1 ArchiCAD\1302-01_Village 2 DA 24.pln
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.